TO DECONGEST METRO MANILA

METRO PADYAKAN WALK AND BIKE WAY

PROJECT DESCRIPTION The Problem •

Traffic congestion and environmental degradation in Metro Manila due to wide use of motorized transport



Increase in number of illegal settlers - many of whom are among urban workers from out of town – caused by high transportation costs

1

PROJECT DESCRIPTION The Concept •

Allocation of dedicated secondary roads that interconnect the 17 cities and towns of Metro Manila for the exclusive use of pedestrians and bicycle riders

PROPOSED NETWORK Estimated length : 200 kms Estimated no. of intersections: 500

Walk and Bike way

2

PROJECT OBJECTIVES ƒ

To provide a safe thoroughfare where low-cost and environmentfriendly means of non-motorized transportation for commuters and pedestrians; and

ƒ

To open up economic opportunities along the route of the Walk and Bike ways.

PROJECT COMPONENTS ƒ

Identification of the road network for the walk and bike way

ƒ

Coordination and consultation with stakeholders

ƒ

Project implementation ¾ Road surface improvements ¾ Road markings ¾ Signage

ƒ

Public information campaign

ƒ

Monitoring and evaluation

3

1.75

PEDALWAY

1.75

WALKWAY

TYPICAL SECTION OF WALK AND BIKE WAY

Provision of traffic signals and lane markings at major intersections Typical Walk and Bike Way Plan at Intersecting Main Roads

4

PROPOSED SIGNAGES

IMMEDIATE IMPACT ƒ Improved mobility ƒ Cheaper travel ƒ Safe mobility for pedestrians and bikers ƒ Encourage people to walk and bike ƒ Reduced motorized vehicle ƒ Economic benefits

5

PROJECT COST ƒ Typical 2-lane road, 8 meters wide Intersecting main road (60 meters) Main walk and bike way

PhP 0.149 M PhP 1.440 M/km

ƒ Approx. 500 intersections x 0 .149 M = PhP 74.50 M ƒ Approx. 200-km network x 1.44 M = 288.00 M

TOTAL PROJECT COST

PhP 362.50 M

TIMEFRAME Short-Term (within 2005)



Medium-Term (2006-2008)



Interconnected walk and bike way for the 17 LGUs [100 km] PhP 182.0 M

Long Term (2009-2010)



Walk and bike way network for Metro Manila [98 km] PhP 175.5 M

Pilot walk and bike way PhP 5.0 M September 17, 2005 Launch

6

Thank you

7

Related Documents

Articles 69376 Mmda
October 2019 16
Articles-69376 Cai Asia
October 2019 14
Articles 69376 Ncts
October 2019 16
Articles 69376 Marikina
October 2019 10
Articles 69376 Ayala
October 2019 13
Articles
November 2019 57

More Documents from ""

Articles-69376 Cai Asia
October 2019 14
Presentation 3
October 2019 21
Articles 69376 Ncts
October 2019 16
Articles 69376 Marikina
October 2019 10
Articles 69376 Ayala
October 2019 13
Fs Driving Strips
October 2019 12