APPENDIX B PART III
PART III SCHEDULE OF DAYWORK RATES
CN10443 APPENDIX B Part III/hs
B/3/1
LTC 07/102
APPENDIX B PART III
6.0 6.1
SCHEDULE OF DAYWORK RATES CONTRACTOR PERSONNEL 6.1.1 CONTRACTOR shall submit a schedule of rates for each category of staff to be utilised to perform the SERVICES. The rates inserted below shall be those used in the compilation of the CONTRACT PRICE. These rates will be used for evaluation of CONTRACT VARIATIONS. 6.1.2 The hourly rate shall be the fully inclusive charge including, but not limited to, salaries, taxes, insurances, all overtime payments including weekends, offices and office equipment, computer and bureau costs, hardware/software programming, administration charges, supervision, management, medicals, holidays, overheads, transport. Safety clothing/equipment, profits, and any other costs charges and expenses not specifically detailed. The rate will apply only to those hours actually worked. 6.1.3 The rates shall be for a daily work schedule of 8 hours per day, 6 days per week. Hourly Rate Doha Office (QR/HR.)
Staff Category
Hourly Rate CONTRACTOR'S Base Office (QR/HR.)
Project Manager/Engineer Senior discipline Engineer Discipline Engineer Surveyor Senior Designer CAD Designer/ Draughtsman Draughtsman Technical Clerk Document Controller Secretary Planner Estimator QA Manager Other (CONTRACTOR to specify)
CN8606 APPENDIX B Part III/hs
B/3/2
LTC 07/102
APPENDIX B PART III
6.2 PRINTING RATES The following tabulated charges are unit costs for the supply of prints/plastic transparencies/microfilms, extra to those specified in the CONTRACT. These unit rates shall be those used for compiling the CONTRACT PRICE. Item Size
QR/Print
QR/Film
QR/Microfilm
A0 Dyeline A1 Dyeline A2 Dyeline A3 Dyeline A4 Dyeline A3 Xerox A4 Xerox Xerox Reduction A1 - A3 Xerox Reduction A2 - A3 Xerox Reduction A3 - A4 Electronic Files in CD Format Electronic Files in 1.44MB 3.5” Diskette Format Others (CONTRACTOR to list)
CN8606 APPENDIX B Part III/hs
B/3/3
LTC 07/102