Anti-red Tape Act

  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Anti-red Tape Act as PDF for free.

More details

  • Words: 603
  • Pages: 5
Technical Assistance on Crop Production/Protection: Schedule of Availability of Service: Monday to Friday 8:00 am – 5:00 pm without noon break

Who May Avail of the Services:

Farmers of Infanta

What are the Requirements:

Formal/ Verbal Request

Duration: Without Discrepancy: One working day With Discrepancy: Three working days

How to Avail of the Service: Step

Client

1

Make service request (Formal or verbal)

2

Sign the client logbook

3

Wait for the schedule of service provision

Service Provider

Duration of Activity (Under Normal Circumstances)

Persons in Charge

AT- Crops Section/ Officer of the Day/ Clerk will receive the request and record relevant information 15 minutes

ATs will contact the farmer and visit the farm for actual inspection and proper recommendation at the scheduled time and date

4 hours (including travel time)

Zenie L. Cuento Carmelo S. Francia Manuel R. Rutaquio Jr.

Seminars/Training on Crop Production/Protection: Schedule of Availability of Service:

Monday to Friday 8:00 am – 5:00 pm without noon break

Who May Avail of the Services:

Farmers of Infanta

What are the Requirements:

Formal Request indicating subject, time, date, and venue. (At least one week prior to scheduled date)

Duration:

15 minutes

How to Avail of the Service: Step Client

Submit formal request 1 Sign the client logbook

Service Provider

Duration of Activity (Under Normal Circumstances)

AT Crops Section/ Officer of the Day/ Clerk will receive the request and record relevant information

Zenie D. Cuento Carmelo S. Francia Manuel R. Rutaquio Jr. 15 minutes

Wait for the confirmation of request/s AT/s will conduct the Seminar/Training on the scheduled time and date

Soil Analysis for Crop Production/Protection

Persons in Charge

4-8 hours

Schedule of Availability of Service: Monday to Friday 8:00 am – 5:00 pm without noon break Who May Avail of the Services:

Farmers of Infanta

What are the Requirements:

Air dried Soil Samples properly labeled (Laboratory & STK) Soil Samples and complete materials for Minus-One-Element-Technique

Duration: Laboratory Analysis Soil Test Kit MOET How to Avail of the Service: Step Client

For STK and Laboratory Analysis: 1

Without Discrepancy 30 days 1 day 1 day

Service Provider

Duration of Activity (Under Normal Circumstances)

Persons in Charge

AT- Crops Section/ Officer of the Day/ Clerk will receive the soil samples

Submit one kilogram air dried soil samples Sign the client logbook

With Discrepancy 60 days 2 days

15 minutes

AT/s will conduct the STK analysis, compute fertilizer requirements, and release the result

For STK: AT will receive and bring the soil samples at the Provincial Soil Laboratory; samples are

4 hours

Zenie L. Cuento Carmelo S. Francia Manuel R. Rutaquio Jr.

analyzed; and the results are released For Laboratory Analysis:

Observation and cooperation with AT

For MOET: AT will brief the farmer about the procedures and will assist in setting up the samples with appropriate treatments. Weekly monitoring ; discussion and recommendation based on observation

30 days 45 days

Inputs Assistance for Crop Production/Protection Schedule of Availability of Service: Monday to Friday 8:00 am – 5:00 pm without noon break Who May Avail of the Services:

Farmers of Infanta

What are the Requirements:

Bonafide Farmer Certification from the Barangay Chairperson (If not included in the masterlist)

Duration:

15 minutes

How to Avail of the Service: Step Client

Submit formal request 1 Sign the client logbook

Service Provider

Duration of Activity (Under Normal Circumstances)

AT Crops Section/ Officer of the Day/ Clerk will receive the request and record relevant information

Zenie L. Cuento Carmelo S. Francia Manuel R. Rutaquio Jr. 15 minutes

Wait for the confirmation of request/s AT/s will conduct the Seminar/Training on the scheduled time and date

Persons in Charge

4-8 hours

Related Documents

Anti-red Tape Act
July 2020 7
Tape Bondowoso
May 2020 7
Tape Singkong.docx
May 2020 8
Tape Measure
November 2019 24
Tape Resources
June 2020 9
Tape Recordings
May 2020 1