UMM WU'AL PHOSPHATE PROJECTFIELD ERECTED TANKS
VEND0R DOCUMENT AND DATA LIST VDDL Form
VENDOR PO. NO.:
NP/322079/MM 004
VDDL REV.:
A01
PAGE:
1OF1
Instruction to Vendor/ Subcontractor a) Vendor to complete and submit this form in accordance with Instrcuction VENDOR DOCUMENT AND REVISION NUMBERING b) Requisitor to review and comments shall not be assumed to indicate either responsibility or liability for accuracy and completeness of this document or to alter contractual terms and conditions. c) Requisitor to highlight the document to be commented by the Employer ENGINEERING DISCIPLINE
VENDOR DOCUMENT NUMBER
DOCUMENT TITLE/ DESCRIPTION
SCHEDULED DATE
EMISSION ISSUE
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ENGINEERING DELIVERABLES‐ Fuel Oil Storage Tank FUEL OIL STORAGE TANK (209FE‐TNK‐002) ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2075_C01
DETAIL OF RING FOUNDATION LAYOUT FOR FLUSH‐TYPE CLEANOUT FITTING NOTCH
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2077_C01
BOTTOM PLATE DEVELOPMENT LAYOUT & DETAILS
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2078_C01
SHELL PLATE DEVELOPMENT LAYOUT & DETAILS
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2079_C01
DETAIL OF FLUSH‐TYPE CLEANOUT FITTING
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2080_C01
DECK PLATE DEVELOPMENT LAYOUT & DETAILS
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2081_C01
DECK SUPPORT/NOZZLE ORIENTATION
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2082_C01
DETAIL OF PONTOON, ACCESSORIES & FOAM DAM
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2083_C01
ROOF WALKWAY LAYOUT & DETAILS ‐ 1, SPLASH BOARD DETAIL ‐ A12
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2084_C01
ROOF WALKWAY LAYOUT & DETAILS ‐ 2, SPLASH BOARD DETAIL ‐ A12
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2085_C01
ROOF WALKWAY LAYOUT & DETAILS ‐ 3
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2086_C01
HANDRAIL LAYOUT & DETAIL ‐ 1
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2087_C01
HANDRAIL LAYOUT & DETAIL ‐ 2
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2088_C01
ROLLING LADDER & EARTHING CABLE DETAIL
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2089_C01
ROLLING LADDER DETAILS ‐ 1
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2090_C01
ROLLING LADDER DETAILS ‐ 2
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2091_C01
ROLLING LADDER DETAILS ‐ 3
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2092_C01
ROLLING LADDER TRACK ASSEMBLY W/ LANDING PLATFORM & STAIR TO FLOATING ROOF DECK DETAILS ‐ 1
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2093_C01
ROLLING LADDER TRACK ASSEMBLY W/ LANDING PLATFORM & STAIR TO FLOATING ROOF DECK DETAILS ‐ 2
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2094_C01
ROLLING LADDER TRACK ASSEMBLY W/ LANDING PLATFORM & STAIR TO FLOATING ROOF DECK DETAILS ‐ 3
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2095_C01
SPIRAL STAIR LAYOUT & DETAILS ‐ 1
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2096_C01
SPIRAL STAIR LAYOUT & DETAILS ‐ 2
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2097_C01
GAUGERS PLATFORM & DETAILS ‐ 1
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2098_C01
GAUGERS PLATFORM & DETAILS ‐ 2
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2099_C01
PRIMARY & INTERMEDIATE WIND GIRDER DETAILS, CURB ANGLE DETAILS
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2100_C01
DETAIL OF SHELL MANWAY ‐ M1/M2 & FLOATING ROOF MANWAY ‐ M4
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2101_C01
DETAIL OF FLOATING ROOF DECK MANWAY ‐ M3, DETAIL OF PONTOON MANWAY ‐ M5
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2102_C01
DETAIL OF FUEL OIL INLET NOZZLE ‐ N1, DETAIL OF ROOF DRAIN (SHELL) OUTLET NOZZLE ‐ N12
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2103_C01
DETAIL OF FUEL OIL OUTLET NOZZLE ‐ N2, DETAIL OF FUEL OIL RECYCLE NOZZLE ‐ N8
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2104_C01
DETAIL OF DRAIN NOZZLES N6 & N7 & DETAIL OF EARTHING LUG ‐ A9
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2105_C01
DETAIL OF GAUGE HATCH NOZZLE ‐ N5A
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2106_C01
DETAIL OF RIM VENT NOZZLE ‐ N15A/B, DETAIL OF SUPPLEMENTARY DRAIN NOZZLE ‐ N16, DETAIL OF EMERGENCY ROOF VENT NOZZLE ‐ N13, DETAIL OF ROOF DRAIN (DECK) INLET NOZZLE ‐ N10
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2107_C01
DETAIL OF LEVEL TRANSMITTER NOZZLE ‐ K1 & K2, & DETAIL OF TEMPERATURE TRANSMITTER NOZZLE ‐ K3
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2108_C01
FLOATING ROOF DECK LEG SUPPORTS 'DS1', 'DS2', DET. OF BLEEDER VENT ‐ 'N14A/B'
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2109_C01
GENERAL ASSEMBLY OF ROOF DRAIN SYSTEM
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2110_C01
PIPE SUPPORTS DETAIL OF ROOF DRAIN SYSTEM
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2111_C01
GENERAL ASSEMBLY OF ROOF SEAL
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2112_C01
PARTS DETAIL OF ROOF SEAL
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2116_C01
TANK MARKING ‐ NUMBERING & CONTENT
06 SEPT. 2015
ISSUED FOR CONSTRUCTION
ME
ME
***********************NOTHING FOLLOWS**********************