DIVN

SECTION

SUR

SUR-YL

LUR-KWV

SUR-DD

Abnormalities Report Morning Position (24.11.2018) DEFICIENCIES NOTED ATTENTION BY DAUND STN: 1) the caution order register for BRMT side CCI/DD 1.SR.DOM was not maintained properly. Cancellation memo/message 2.SR.DOM was not pasted/recorded. 2) The fire safety buckets on pf 3.SR.DME no. 3 were not properly filled with fire fighting materials 4.SR.DCM sand and water. 3) The hydrant pipes of PF no. 2 & 3 were 5. SR.DCM not secured properly. some pipes were found hanging which may prove to be dangerous to incoming trains. 4) The train coach indicators displayed at the arrival of train no. 11039 DN on PF no. 2 was not matching with actual composition of the train. B/2 instead of S/1. 5) The refilling date of fire extinguishers in parcel office has expired on 11.11.2018. KWV/PANEL : 1)On line TSR back up is for 01 hour, but after SC/TFC 1.Sr.DOM & MSEB supply failure on line TSR going to off line ( internet Sr. DSTE not working) 2) Direct reception to Goods Loop Line is not 2.Sr.DSTE possible from LUR Side KWV PANEL: 1) Tested Fire Alarm System from IPS Room, SC/S&T 3. Sr. DSTE found working properly. After getting Alarm, SM followed the procedure properly. 2) Last Date & Timings of Relay Room Opening & Closing of Date 22.11.18, checked through Data Logger ,found matching with the register.3) Disconnection memo issued by S&T Staff in the month of AUGUST as 30 nos & in the month of September 38 Nos, were as target for preventive maintenance disconnection memo is fixed as 40 Nos. Train No GM SPL/Loco no 11390+11455 /KYN Base/ 1) All ADME/DD 5. Sr.DEN/N gate man, points man ,petrol man found alert & in uniform . 2) LP run with MPS 105 Kmph between SUR-DD. 3) All TSR & PSR was observed by LP. 4) Calling out aspect was good. 5) Track needs attention at KM 371/3-1, 305/5-2 .

Feedback / Action taken 1.As per on duty Dy.SM Register is maintained. Advised to counsel Dy.SM for proper entry in all register from time to time. 2.Advised to SM to check & ensure proper filling of water & sand. 3. Advised to CWS/DD for necessary action. 4.& 5. CCI/DD herself is taking action. 1. Pertains to Sr. DSTE as per Sr.DOM OFFICE & as per Telcom control not pertains to S&T Dept. 2. It is as per Circuit

3. Advised SSE/KWV TO Counsel ESMs.

5.Advised to CPWI/KWV, CPWI/JH & planed on 25.11.18.

ABNORMALITIES REPORT 23/11/2018 REPORTED BY LPs / Track Defects Date 23-11-2018 SR. NO.

DATE

TRAIN NO

REPORTED BY

SECTION

1

22.11.2018

DRM SPL

R K RAIDU

MO STN

DEFECT REPORTED -

90 KMPH CD board not provided 416/0 Rough Riding 415/7

FEEDBACK Planned on 24-11-2018

Related Documents


More Documents from ""

Abnormality 24.11.18.docx
November 2019 5
Dos And Dont .pptx
November 2019 14
History Of Dravidians
April 2020 2
Business Types
May 2020 13
August 2019 5