Professional profile I have experience in the management and deployment in GSM mobile networks and Microwave Transmission projects for more than 10 years including: installation, configurations, maintenance, acceptance, integration, and Organisation of the work teams. Languages: French, Arabic, English Driving license Passport valid to January 2022 Professional experience 1. Team leader Target Telecom Tunisia September 2016, until now - Swap 2G&3G equipment from E// to Huawei - Installation LTE 800 &1800 RRU, cable RET, CPRI, jumper.. - Configuration RET Values & troubleshooting (RTWP, VSWR, VLAN Id.. ) using LMT software - Installation & integration XPIC links huawei 2+0,2+2 (RTN950, 980, XMC2 ODUs) - Installation & integration Long Haul Huwaei in 6+0 XPIC configuration (CSHL,RFU, Branching Unit - Test XPD, E1 cross connection 2. Site Engineer Huawei Tunisia project Ooredoo June 2016, August 2016
Tunisia
- Supervise subcontractor during installation - Test ping with huawei NOC - Swap from ALU 2G to Huawei 2G//3G//LTE equipment (BBU 3910) - Smart QC report (EHS& WAH) - Approve smart QC report done by the subcontractor - Daily reporting 3. Team leader ITS com Tunisia March 2015 to Mai 2016 - Installation Nokia Flexi EDGE BTS with different configuration (ESMB, FPRA, OVP, RF module 900, 1800 - update software , commissioning & integration of Flexi EDGE BTS using 2G Flexi BTS Site Manager - Internal & external wiring (synch cable, EAC cable, DC cables, CPRI, Jumpers, E1 & FE/GE cable… - Installation flexi Multiradio with feeder less & non feeder less configuration (FSME “MS 2100”, FXDA “RF 900”, FXEA “RF 1800”, FRGB “RF 2100”) - Installation & power-on alls boards for NODEB NSN ( FRGP , FSME, RF module , antennas , CPRI , Jumpers , Duplexer .. - update software version (WN7.01104 899 00) to NodeB using 3G BTS Site Manager - commissioning step and integration the NodeB - installation & power-on all boards for eNodeB LTE800&1800 ( FXED: RFM1800, FRME:RFM800, FSMF:MS - FXEA shared between 2G & LTE - update software version (FL15A_ENB_0107_001198_000027) using BTS site Manager - Installation & commissioning 9500MPR (6.1 version) (ESV2, EVO card, MPT-HQAM radio, power injector - Installation & commissioning 3 links MPR (5.1) SDH (3.7m; 2.4m; 3m) space diversity & frequency diversity using (branching, extended power, MPT access card, optical fiber, RG cable - Installation & commissioning Huawei RTN series and B2B links 4. Site supervisor Alcatel-lucent project ORANGE December 2014, January 2015
Cameroun
- Supervise subcontractor during installation - Commissioning and integration of 9500 MPR/MPT - Upgrade software NE from V4.01 to V4.02 (R95M) - Cross connection E1 & VLAN - Routage between DDF BSC & DDF MPR - Commissioning and integration 2G sites (SUMUX, MC_RRH) - Commissioning and integration 2G sites (Evolium A9100) - Commissioning 3G sites (d2U, d4U,RRH) - Troubleshooting - Test call with OMCR
5. Project coordinator ITS com Tunisia project Ooredoo Tunisia August 2014, November 2014 - Interface between the company and the customer - Allocation of teams - Supporting teams during the installation - Resolve technical problems encountered by teams on the site - Make acceptance with customer 6. Site Engineer Huawei Algeria project Djezzy February 2014, July 2014
Algeria
- Swap antennas 2G to 3G band using triplexer & TMA (agisson) - Commissioning & integration node B huawei BTS3900, BTS3900A, DBS3900 (R14) outdoor and indoor cabinet - Installation indoor and outdoor power supply huawei version - Batteries swap - Commissioning and integration huawei optix RTN905, 950, 980; (v1.R8) - VLAN & E1 cross connection - VSWR test using anrutsi site master - Make acceptance with customer - Supervise the subcontractor during installation
7. Team leader ITS com project Ooredoo Tunisia November 2009 to January2014 - Installation of SDH alcatel-lucent 9600 LSY -Installation & commissioning of different OMSN (1650-1660-1662) - Installation and startup of link PDH HUWAEI, RTN-910 & RTN-950 - Cross connection, E1/Ethernet configuration - Troubleshooting of alls version optix RTN 910-950-980 - Troubleshooting of alls version ODU SP; HP; XMC2 - Preventive maintenance and solve problems encountered - Throughput & E1 Test - Commissioning of different types of links (HSB, SD, XPIC) - Installation and startup of link PDH Alcatel, 9400AWY in configuration 1+0 and 1+1(1320CT) - Installation of Alcatel-lucent TC A925 - Installation of Alcatel-lucent BSC MX A 9130 - Installation of Alcatel-lucent BSC G2 - Installation of Alcatel-lucent IPMPLS Router 7750 SR-07
- Installation of rectifier SAFT G4 and connection of alarms system (main alarm Rectifier failure…) - Installation and commissioning of link PDH NEC, PASOLINKNEO ( DXC) in configuration 1+0 and 1+1 (PNMT) - Installation huawei DBS 3900 2G & 3G with outdoor equipment RRU - Commissioning BTS Alcatel-lucent indoor and outdoor (release B8, B9, B10) (OFFLINE&ONLINE) - Installation & commissioning for Nokia Flexi EDGE BTS - Maintenance BTS and link of transmission - Acceptance of sites with the customer 8. Commissioner Alcatel-lucent project ORANGENIGER April 2009, to October 2009 - Supervision of installation and alignment knowledge of Alcatel Lucent equipments transmission MW: Away 1320CT, 9500MXC, 9500 MPR - Installation & commissioning the external batteries cabinet outdoor Power One in using software PCS Burn & Powcom - Connecting alarms for power-one cabinet in the BTS (low Batt, High temp, mains alarms...) - Installation & commissioning the rack batteries Elteck in using software Powersuite3.0 - Connecting Generator alarms in the BTS (OUTC) - Test alarms for Generator (LISTER PETTER) low level fuel & generator startup with OMC_R - Installation & commissioning the 9500 MXC equipment - Installation & commissioning the 9400 AWY family 32E1 V2.1.1 - Commissioning Indoor & outdoor Alcatel BTS (B9) & (B10) - Acceptance of sites with the customer 9. Team leader Alcatel-lucent project SOMTELSomalia February, March 2009 - Survey and check installation of the Alcatel GSM & DCS site - Installation and integration of BTS MBI 3 and MBI 5 GSM & DCS (B10) - Installation of rectifier SAFT G3 and connection of alarms system (main alarm Rectifier failure…) - sweep test with Anritsu site master - Acceptance of sites with the customer
10. Team Leader ITS com project Ooredoo Tunisia June 2007 to January 2009 - Installation BTS Alcatel GSM/DCS G2, G3, G4 EVOLIUM, A9100, A9110 -Anterior and external wiring, feeders (7/8, 5/4, ½), coax,
connector… -Installation of rectifier ELTEK, SAFT and connection of alarms system. -Integration of BTS, IDU and to rectifier -Installation and commissioning of link PDH Alcatel, 9400AWY (1320CT) -Installation and startup of link PDH Alcatel, 9400UX (Nectas) -Maintenance BTS and link of transmission -Acceptance of sites with the customer
11. Installator Sascom July 2006 to Mai 2007
Tunisia
-Installation and startup of link PDH Alcatel, 9400AWY & 9400UX in configuration 1+0 and 1+1 (Nectas & 1320CT) -Installation and startup of link PDH NEC Paso Link, in configuration 1+0 and 1+1(PNMT) -Installation EBCO (External Battery Cabinet Outdoor)
Education and training courses 1. High-level technician in telecommunication specialty transmission ISET COM Tunis; Tunisia [ 3 years ], [ September 1999 ]; The cellular network: GSM, GPRS, UMTS, principles, architectures, standards, terminals, Commutation and services. optical communications: Principle, Architecture and service February 2002: Final project of study: Introduction of optic fiber in the subscriber network February 2001: Mini project: studies of zones June 2001: Technician Training Course in Tunisia Telecom: bureau d’etude January 2001: working training course Tunisia Telecom: study construction and repair of the telephone lines Technical baccalaureate mention rather well: June 1999 Competences and knowledge Network: X25, ATM, FR, GSM, GPRS UMTS, PMR, Internet… Transmission: coaxe, fibre, FHN Techniques of FDMA, TDMA, CDMA, WCDMA, ATM, PDH and SDH Equipments: ALCATEL, NEC, NSN, Huawei, Saft, Eltek… Materials: materials of power, Site master, and earth test.
Data processing: Operating system: (Windows 95/98/NT/2000/XP), Office automations: MS Office (Word, Excel, FrontPage, power point…), Data Base: (Access), Programming: (Pascal, C), software: (OMT software, NECTAS 9400UX, BTS terminal release B8, B9 1320CT9400AWY, PNMT NEC PASOLINK…