7140.docx

  • Uploaded by: Shubkant Zaa
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 7140.docx as PDF for free.

More details

  • Words: 1,333
  • Pages: 6
       

Curriculum Vitae Name Surname Date of birth Nationality Marital status Email Phone number

: Werghemmi : Mohamed : 01-02-1979 : Tunisian : Married : [email protected] : + 216 27 885 904 or +216 22 925848

Professional profile I have experience in the management and deployment in GSM mobile networks and Microwave Transmission projects for more than 10 years including: installation, configurations, maintenance, acceptance, integration, and Organisation of the work teams. Languages: French, Arabic, English Driving license Passport valid to January 2022 Professional experience 1. Team leader Target Telecom Tunisia September 2016, until now - Swap 2G&3G equipment from E// to Huawei - Installation LTE 800 &1800 RRU, cable RET, CPRI, jumper.. - Configuration RET Values & troubleshooting (RTWP, VSWR, VLAN Id.. ) using LMT software - Installation & integration XPIC links huawei 2+0,2+2 (RTN950, 980, XMC2 ODUs) - Installation & integration Long Haul Huwaei in 6+0 XPIC configuration (CSHL,RFU, Branching Unit - Test XPD, E1 cross connection 2. Site Engineer Huawei Tunisia project Ooredoo June 2016, August 2016

Tunisia

- Supervise subcontractor during installation - Test ping with huawei NOC - Swap from ALU 2G to Huawei 2G//3G//LTE equipment (BBU 3910) - Smart QC report (EHS& WAH) - Approve smart QC report done by the subcontractor - Daily reporting 3. Team leader ITS com Tunisia March 2015 to Mai 2016 - Installation Nokia Flexi EDGE BTS with different configuration (ESMB, FPRA, OVP, RF module 900, 1800 - update software , commissioning & integration of Flexi EDGE BTS using 2G Flexi BTS Site Manager - Internal & external wiring (synch cable, EAC cable, DC cables, CPRI, Jumpers, E1 & FE/GE cable… - Installation flexi Multiradio with feeder less & non feeder less configuration (FSME “MS 2100”, FXDA “RF 900”, FXEA “RF 1800”, FRGB “RF 2100”) - Installation & power-on alls boards for NODEB NSN ( FRGP , FSME, RF module , antennas , CPRI , Jumpers , Duplexer .. - update software version (WN7.01104 899 00) to NodeB using 3G BTS Site Manager - commissioning step and integration the NodeB - installation & power-on all boards for eNodeB LTE800&1800 ( FXED: RFM1800, FRME:RFM800, FSMF:MS - FXEA shared between 2G & LTE - update software version (FL15A_ENB_0107_001198_000027) using BTS site Manager - Installation & commissioning 9500MPR (6.1 version) (ESV2, EVO card, MPT-HQAM radio, power injector - Installation & commissioning 3 links MPR (5.1) SDH (3.7m; 2.4m; 3m) space diversity & frequency diversity using (branching, extended power, MPT access card, optical fiber, RG cable - Installation & commissioning Huawei RTN series and B2B links 4. Site supervisor Alcatel-lucent project ORANGE December 2014, January 2015

Cameroun

- Supervise subcontractor during installation - Commissioning and integration of 9500 MPR/MPT - Upgrade software NE from V4.01 to V4.02 (R95M) - Cross connection E1 & VLAN - Routage between DDF BSC & DDF MPR - Commissioning and integration 2G sites (SUMUX, MC_RRH) - Commissioning and integration 2G sites (Evolium A9100) - Commissioning 3G sites (d2U, d4U,RRH) - Troubleshooting - Test call with OMCR

5. Project coordinator ITS com Tunisia project Ooredoo Tunisia August 2014, November 2014 - Interface between the company and the customer - Allocation of teams - Supporting teams during the installation - Resolve technical problems encountered by teams on the site - Make acceptance with customer 6. Site Engineer Huawei Algeria project Djezzy February 2014, July 2014

Algeria

- Swap antennas 2G to 3G band using triplexer & TMA (agisson) - Commissioning & integration node B huawei BTS3900, BTS3900A, DBS3900 (R14) outdoor and indoor cabinet - Installation indoor and outdoor power supply huawei version - Batteries swap - Commissioning and integration huawei optix RTN905, 950, 980; (v1.R8) - VLAN & E1 cross connection - VSWR test using anrutsi site master - Make acceptance with customer - Supervise the subcontractor during installation

7. Team leader ITS com project Ooredoo Tunisia November 2009 to January2014 - Installation of SDH alcatel-lucent 9600 LSY -Installation & commissioning of different OMSN (1650-1660-1662) - Installation and startup of link PDH HUWAEI, RTN-910 & RTN-950 - Cross connection, E1/Ethernet configuration - Troubleshooting of alls version optix RTN 910-950-980 - Troubleshooting of alls version ODU SP; HP; XMC2 - Preventive maintenance and solve problems encountered - Throughput & E1 Test - Commissioning of different types of links (HSB, SD, XPIC) - Installation and startup of link PDH Alcatel, 9400AWY in configuration 1+0 and 1+1(1320CT) - Installation of Alcatel-lucent TC A925 - Installation of Alcatel-lucent BSC MX A 9130 - Installation of Alcatel-lucent BSC G2 - Installation of Alcatel-lucent IPMPLS Router 7750 SR-07

- Installation of rectifier SAFT G4 and connection of alarms system (main alarm Rectifier failure…) - Installation and commissioning of link PDH NEC, PASOLINKNEO ( DXC) in configuration 1+0 and 1+1 (PNMT) - Installation huawei DBS 3900 2G & 3G with outdoor equipment RRU - Commissioning BTS Alcatel-lucent indoor and outdoor (release B8, B9, B10) (OFFLINE&ONLINE) - Installation & commissioning for Nokia Flexi EDGE BTS - Maintenance BTS and link of transmission - Acceptance of sites with the customer 8. Commissioner Alcatel-lucent project ORANGENIGER April 2009, to October 2009 - Supervision of installation and alignment knowledge of Alcatel Lucent equipments transmission MW: Away 1320CT, 9500MXC, 9500 MPR - Installation & commissioning the external batteries cabinet outdoor Power One in using software PCS Burn & Powcom - Connecting alarms for power-one cabinet in the BTS (low Batt, High temp, mains alarms...) - Installation & commissioning the rack batteries Elteck in using software Powersuite3.0 - Connecting Generator alarms in the BTS (OUTC) - Test alarms for Generator (LISTER PETTER) low level fuel & generator startup with OMC_R - Installation & commissioning the 9500 MXC equipment - Installation & commissioning the 9400 AWY family 32E1 V2.1.1 - Commissioning Indoor & outdoor Alcatel BTS (B9) & (B10) - Acceptance of sites with the customer 9. Team leader Alcatel-lucent project SOMTELSomalia February, March 2009 - Survey and check installation of the Alcatel GSM & DCS site - Installation and integration of BTS MBI 3 and MBI 5 GSM & DCS (B10) - Installation of rectifier SAFT G3 and connection of alarms system (main alarm Rectifier failure…) - sweep test with Anritsu site master - Acceptance of sites with the customer

10. Team Leader ITS com project Ooredoo Tunisia June 2007 to January 2009 - Installation BTS Alcatel GSM/DCS G2, G3, G4 EVOLIUM, A9100, A9110 -Anterior and external wiring, feeders (7/8, 5/4, ½), coax,

connector… -Installation of rectifier ELTEK, SAFT and connection of alarms system. -Integration of BTS, IDU and to rectifier -Installation and commissioning of link PDH Alcatel, 9400AWY (1320CT) -Installation and startup of link PDH Alcatel, 9400UX (Nectas) -Maintenance BTS and link of transmission -Acceptance of sites with the customer

11. Installator Sascom July 2006 to Mai 2007

Tunisia

-Installation and startup of link PDH Alcatel, 9400AWY & 9400UX in configuration 1+0 and 1+1 (Nectas & 1320CT) -Installation and startup of link PDH NEC Paso Link, in configuration 1+0 and 1+1(PNMT) -Installation EBCO (External Battery Cabinet Outdoor)

Education and training courses 1. High-level technician in telecommunication specialty transmission ISET COM Tunis; Tunisia [ 3 years ], [ September 1999 ]; The cellular network: GSM, GPRS, UMTS, principles, architectures, standards, terminals, Commutation and services. optical communications: Principle, Architecture and service February 2002: Final project of study: Introduction of optic fiber in the subscriber network February 2001: Mini project: studies of zones June 2001: Technician Training Course in Tunisia Telecom: bureau d’etude January 2001: working training course Tunisia Telecom: study construction and repair of the telephone lines Technical baccalaureate mention rather well: June 1999 Competences and knowledge Network: X25, ATM, FR, GSM, GPRS UMTS, PMR, Internet… Transmission: coaxe, fibre, FHN Techniques of FDMA, TDMA, CDMA, WCDMA, ATM, PDH and SDH Equipments: ALCATEL, NEC, NSN, Huawei, Saft, Eltek… Materials: materials of power, Site master, and earth test.

Data processing: Operating system: (Windows 95/98/NT/2000/XP), Office automations: MS Office (Word, Excel, FrontPage, power point…), Data Base: (Access), Programming: (Pascal, C), software: (OMT software, NECTAS 9400UX, BTS terminal release B8, B9 1320CT9400AWY, PNMT NEC PASOLINK…

More Documents from "Shubkant Zaa"

7140.docx
April 2020 2
Download File-1.pdf
December 2019 13
Iki Seng Bener.docx
April 2020 7
Leaflet.docx
July 2020 7