HARGA PERKIRAAN SENDIRI (HPS) UPAH DAN BAHAN REKAPITULASI Kegiatan

: PENGADAAN DAN PEMASANGAN JARINGAN INTERNET DAN INTRANET PEMERINTAH KABUPATEN BUTON TENGAH

Pekerjaan

: PENGADAAN MENARA ANTEN JARINGAN INTERNET KAB.BUTON TENGAH

Lokasi

: KAB. BUTON TENGAH

Tahun Anggaran

: 2018

URAIAN PEKERJAAN

NO.KODE

JUMLAH HARGA

A

PEKERJAAN PENDAHULUAN

3,100,000

B

PEKERJAAN TANAH

1,226,555

C

PEKERJAAN STRUKTUR

D

PEKERJAAN PEMASANGAN JARINGAN UTAMA

627,346,275

E

PEKERJAAN PEMASANGAN JARINGAN CLIENT

434,651,700

20,471,684

REAL COST

=

1,086,796,214

PPN 10 %

= ( A X 4% )

TOTAL COST

= ( A +B )

108,679,621 1,195,475,835

DIBULATKAN

1,195,475,000

Terbilang : Satu milyar SeRatus Sembilan Puluh Lima Juta Empat Ratus Tujuh Puluh Lima Ribu Rupiah ,-

Labungkari, 20 Oktober 2018 Pejabat Pembuat Komitmen (PPK)

LA OTA, S.Pd NIP. 19720911 199802 1 002

HARGA PERKIRAAN SENDIRI (HPS) UPAH DAN BAHAN Kegiatan

: PENGADAAN DAN PEMASANGAN JARINGAN INTERNET DAN INTRANET PEMERINTAH KABUPATEN BUTON TENGAH : PENGADAAN MENARA ANTEN JARINGAN INTERNET KAB.BUTON TENGAH

Pekerjaan Lokasi Tahun Anggaran

: KAB. BUTON TENGAH : 2018

URAIAN PEKERJAAN

NO A

SAT.

VOLUME

HARGA SATUAN

JUMLAH HARGA

PEKERJAAN PENDAHULUAN

1

Pengukuran Dan Pemasangan Patok

Ls

5

300,000.00

1,500,000

2

Papan Nama Proyek

Ls

5

200,000.00

1,000,000

3

Administrasi dan Dokumentasi

Ls

1

600,000.00

600,000

Sub Total A B

3,100,000

PEKERJAAN TANAH

1

Galian Batu

2

Pengurugan 1 M3 Dengan Pasir Urug

M3

5.8

107,548.00

622,058

M3

1.4

418,048.00

604,497

Sub Total B

1,226,555

C

PEKERJAAN STRUKTUR

1

Pemasangan 1 M3 Batu Kosong (Aanstamping)

M3

4.34

610,897.25

2,650,072

2

Pems. 1 M3 Pondasi Campuran 1SP : 3PP

M3

4.01

839,298.75

3,368,945

3

Pas. Beton Siklop

M3

4.26

4,187,408.75

17,821,612

Sub Total C

20,471,684

D

PEKERJAAN PEMASANGAN JARINGAN UTAMA

1

Pemasangan tower Segi empat labrang (30 Meter/10 Stage)

Stage

5.0

81,733,375.00

408,666,875

2

Pemasangan Penagkal Petir

Paket

5.0

14,227,800.00

71,139,000

3

Pemasangan Solar Cell

Paket

5.0

16,905,000.00

84,525,000

4

Pemasangan Jaringan dan installasi jaringan utama

Paket

1.0

63,015,400.00

63,015,400

Sub Total D E

PEKERJAAN PEMASANGAN JARINGAN CLIENT

1

Pemasangan anten Clent dan installasi jaringan Client

627,346,275

Paket

14.0

31,046,550.00

434,651,700

Sub Total E

434,651,700

Total = ( A + B + C + D + E F )

1,086,796,214

Dibulatkan

1,086,796,000

Labungkari, 20 Oktober 2018 Pejabat Pembuat Komitmen (PPK)

LA OTA, S.Pd NIP. 19720911 199802 1 002

B.1 Menggali 1 M 3 Tanah Keras Sedalam 1 M

NO

A

URAIAN

TENAGA 1 Pekerja 2 Mandor

B

C

D E F

KODE

SATUAN

L.01 L.04

OH OH

KOEFISIEN

HARGA SATUAN ( RUPIAH )

1.0000 0.0320

JUMLAH HARGA ( RUPIAH )

90,000 110,000

90,000 3,520

JUMLAH TENAGA KERJA

93,520

JUMLAH HARGA BAHAN

-

JUMLAH HARGA ALAT

-

BAHAN

PERALATAN

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

93,520 14,028 107,548

15% x D

B.2 Pengurugan 1 M3 Dengan Pasir Urug

NO

A

B

C

URAIAN

TENAGA 1 Pekerja 2 Mandor

BAHAN 1 Pasir Urug

KODE

SATUAN

L.01 L.04

OH OH

m3

KOEFISIEN

HARGA SATUAN ( RUPIAH )

1.0000 0.0320

90,000 110,000

90,000 3,520

JUMLAH TENAGA KERJA

93,520

1.2000 225,000 JUMLAH HARGA BAHAN

270,000 270,000

PERALATAN JUMLAH HARGA ALAT

D E F

JUMLAH HARGA ( RUPIAH )

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

15% x D

363,520 54,528 418,048

C.1 Pemasangan 1 M3 Batu Kosong (Aanstamping)

NO

A

B

URAIAN

HARGA SATUAN ( RUPIAH )

KODE

SATUAN

TENAGA 1 Pekerja 2 Tukang Batu

L.01 L.02

OH OH

0.6800 Rp 90,000.00 Rp 61,200.00 0.2900 Rp120,000.00 Rp 34,800.00

3 Kepala Tukang

L.03

OH

0.0290 Rp125,000.00 Rp

4 Mandor

L.04

OH

0.0290 Rp110,000.00 Rp 3,190.00 JUMLAH TENAGA KERJA Rp 102,815.00

M3

1.2000 Rp255,000.00 Rp 306,000.00

3

0.5440 Rp225,000.00 Rp 122,400.00

KOEFISIEN

2 Pasir Urug

M

JUMLAH HARGA BAHAN

Rp 428,400.00

PERALATAN JUMLAH HARGA ALAT

D E F

3,625.00

BAHAN 1 Batu Gunung

C

JUMLAH HARGA ( RUPIAH )

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

Rp Rp

-

Rp 531,215.00 Rp 79,682.25 Rp 610,897.25

15% x D

C.2 Pemasangan 1 M3 Pondasi Batu Gunung Campuran 1SP : 3PP NO

A

B

URAIAN

KODE

TENAGA 1 Pekerja 2 Tukang Batu

L.01 L.02

3 Kepala Tukang

L.03

4 Mandor

L.04

SATUAN

OH OH

KOEFISIEN

HARGA SATUAN ( RUPIAH )

3.4000 Rp 90,000.00 Rp 306,000.00 0.8500 Rp120,000.00 Rp 102,000.00 0.0850 Rp125,000.00 Rp

10,625.00

0.1700 Rp110,000.00 Rp 18,700.00 JUMLAH TENAGA KERJA Rp 437,325.00

1 Batu Gunung / Kali

M3

1 Semen Portland

Kg M

3

1.1000 Rp250,000.00 Rp 275,000.00 143.0000 Rp

1,500.00 Rp 214,500.00

0.3120 Rp250,000.00 Rp JUMLAH HARGA BAHAN

78,000.00

Rp 292,500.00

PERALATAN JUMLAH HARGA ALAT

D E F

( RUPIAH )

BAHAN

2 Pasir Beton C

JUMLAH HARGA

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

15% x D

Rp

-

Rp 729,825.00 Rp 109,473.75 Rp 839,298.75

C.3 Pemasangan 1 M3 Pondasi Siklop, 60% Beton Campuran 1SP : 2 PB : 3 Kr dan 40% Batu Gunung NO

URAIAN

A

B

KODE

TENAGA 1 Pekerja 2 Tukang Batu

L.01 L.02

3 Kepala Tukang

L.03

4 Mandor

L.04

KOEFISIEN

OH OH

HARGA SATUAN

JUMLAH HARGA

( RUPIAH )

( RUPIAH )

3.4000 Rp 0.8500 Rp

90,000.00 Rp 120,000.00 Rp

306,000.00 102,000.00

0.0850 Rp

125,000.00 Rp

10,625.00

0.1700 Rp 110,000.00 Rp JUMLAH TENAGA KERJA Rp

18,700.00 437,325.00

BAHAN 1 Semen Portland

Kg

143.0000 Rp

1,500.00 Rp

214,500.00

2 Pasir Beton

M3

0.3120 Rp

250,000.00 Rp

78,000.00

0.4680 Rp

300,000.00 Rp

3

3 Kerikil 4 Besi Beton 5 Kawat Beton 6 Besi Kanal U uk.5x10 cm C

SATUAN

M Kg Kg Kg

140.0000 Rp 17,000.00 2.0000 Rp 17,000.00 21.0000 Rp 17,000.00 JUMLAH HARGA BAHAN

140,400.00

Rp Rp Rp Rp

2,380,000.00 34,000.00 357,000.00 3,203,900.00

Rp Rp

-

Rp Rp Rp

3,641,225.00 546,183.75 4,187,408.75

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

15% x D

D.1 Pemasangan tower Segi empat labrang (30 Meter/10 Stage) dan Radio NO

A

B

URAIAN

TENAGA 1 Jasa pemasangan Instalasi tower utama BAHAN Tower besi Siku Uk.3 mm (fourangle) 40x40, 3m per stage Kipas Caping dan segel caping Jarum keras N0. 12 (Turn Buckle) Kawat Slink Baja 6 mm Segel/ klam Slink 6mm (kuku Macan) Baut / nut uk.19 x 15 cm Ring Baut / nut uk.19 x 15 cm RADIO UBIQUITI Nanostation M2 access point outdoor 8 Ubiquiti Network dg power AP 28dbm (630mW) internal antena 11dBi. Hi Power 22 MIMO AirMax TDMA Station 2.4Ghz

1 2 3 4 5 6 7

C

D E F

KODE

SATUAN

Stage

Stage bh pcs set pcs pcs pcs Set

HARGA SATUAN ( RUPIAH )

KOEFISIEN

JUMLAH HARGA ( RUPIAH )

10.00 Rp 970,000.00 Rp JUMLAH TENAGA KERJA Rp 13.00 4.00 30.00 1.50 205.00 50.00 100.00

Rp Rp Rp Rp Rp Rp Rp

2.00 Rp

1,760,000.00 150,000.00 27,000.00 14,200,000.00 7,500.00 17,500.00 3,500.00

9,700,000.00 9,700,000.00

Rp Rp Rp Rp Rp Rp Rp

22,880,000.00 600,000.00 810,000.00 21,300,000.00 1,537,500.00 875,000.00 350,000.00

6,510,000.00 Rp

13,020,000.00

JUMLAH HARGA BAHAN

Rp

61,372,500.00

JUMLAH HARGA ALAT

Rp Rp

-

Rp Rp Rp

71,072,500.00 10,660,875.00 81,733,375.00

PERALATAN

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

15% x D

D.2 Pemasangan Penagkal Petir NO

URAIAN

A

TENAGA 1 Jasa instalasi Penangkal Petir

Stage

BAHAN Kabel Grounding 6mm Tali grounding pembagi Pipa splitz penangkal petir Splitz penangkal petir Stick rood grounding 16mm Clamp Scound Isolator Box Kontrol (beton) wisbar grounding

mtr mtr pcs pcs Btg pcs pcs pcs unit pcs

B 1 2 3 4 5 6 7 8 9 10 C

KODE

SATUAN

KOEFISIEN

HARGA SATUAN ( RUPIAH )

1.00 Rp 1,200,000.00 Rp JUMLAH TENAGA KERJA Rp 45.00 Rp 75,000.00 40.00 Rp 35,000.00 1.00 Rp 150,000.00 1.00 Rp 100,000.00 4.00 Rp 1,200,000.00 10.00 Rp 40,000.00 4.00 Rp 15,000.00 1.00 Rp 25,000.00 1.00 Rp 350,000.00 2.00 Rp 256,000.00 JUMLAH HARGA BAHAN

1,200,000.00 1,200,000.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

3,375,000.00 1,400,000.00 150,000.00 100,000.00 4,800,000.00 400,000.00 60,000.00 25,000.00 350,000.00 512,000.00 11,172,000.00

Rp Rp

-

Rp Rp Rp

12,372,000.00 1,855,800.00 14,227,800.00

PERALATAN JUMLAH HARGA ALAT

D E F

JUMLAH HARGA ( RUPIAH )

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

15% x D

D.3 Pemasangan Solar Cell NO

A

B

C

D E F

URAIAN

TENAGA 1 Jasa instalasi Solar Cell BAHAN SOLAR CELL PAKET LISTRIK 400 WATT TENAGA SURYA, PAKET SOLAR 1 HOME SYSTEM 100 WP 1 Solar Cell 100 WP

KODE

SATUAN

Paket

#REF!

KOEFISIEN

HARGA SATUAN ( RUPIAH )

JUMLAH HARGA ( RUPIAH )

1.00 Rp 1,200,000.00 Rp JUMLAH TENAGA KERJA Rp

1.00 Rp

13,500,000.00 Rp

1,200,000.00 1,200,000.00

13,500,000.00

JUMLAH HARGA BAHAN

Rp

13,500,000.00

JUMLAH HARGA ALAT

Rp Rp

-

Rp Rp Rp

14,700,000.00 2,205,000.00 16,905,000.00

PERALATAN

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

15% x D

D.4 Pemasangan Jaringan dan installasi jaringan utama NO

A

B

C

D E F

URAIAN

KODE

TENAGA 1 Jasa instalasi Jaringan Utama

Paket

BAHAN MikroBits Dinara 8 Gigabit 8 SFP (RoS Level 4), Processor : Intel@ Quad Xeon@ Processor Sandy 1 Bridge (3GHz), RAM : 1 x 2048MB DDR3 Industrial Grade RAM 2 L 2 SWITCH support L3 lengkap dgn SFP (L 2 SWITCH support L3= 20 Buah, SFP = 40 buah) Open rack 19 inch 20 U dan pemasangan kabel rak19 inch untuk Fiber Optic(19 Pcs) cableing 3 power

HARGA SATUAN ( RUPIAH )

SATUAN KOEFISIEN

JUMLAH HARGA ( RUPIAH )

1.00 Rp 5,500,000.00 Rp JUMLAH TENAGA KERJA Rp

5,500,000.00 5,500,000.00

Set

1.00 Rp

34,080,000.00 Rp

34,080,000.00

Paket

1.00 Rp

12,460,000.00 Rp

12,460,000.00

paket

1.00 Rp

2,756,000.00 Rp

2,756,000.00

JUMLAH HARGA BAHAN

Rp

49,296,000.00

JUMLAH HARGA ALAT

Rp Rp

-

Rp Rp Rp

54,796,000.00 8,219,400.00 63,015,400.00

PERALATAN

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

15% x D

E.1 Pemasangan anten Clent dan installasi jaringan Client NO

A

B

C

D E F

URAIAN

TENAGA 1 Jasa pemasangan Instalasi Anten Client 2 Jasa instalasi Jaringan Client BAHAN 1 Anten Tower Monopole 15 Meter : Pipa Welded 2 inch, 1.5 inch RADIO UBIQUITI Nanostation M2 access point outdoor Ubiquiti Network dg power AP 28dbm 2 (630mW) internal antena 11dBi. Hi Power 22 MIMO AirMax TDMA Station 2.4Ghz 3 Router CISCO RV082-EU VPN Router 2 port WAN 16 port RJ45, load balancing

KODE

SATUAN KOEFISIEN

Paket Paket

HARGA SATUAN ( RUPIAH )

JUMLAH HARGA ( RUPIAH )

1.00 Rp 1,200,000.00 Rp 1.00 Rp 2,500,000.00 Rp JUMLAH TENAGA KERJA Rp

1,200,000.00 2,500,000.00 3,700,000.00

Set

1.00 Rp

8,450,000.00 Rp

8,450,000.00

Paket

1.00 Rp

6,510,000.00 Rp

6,510,000.00

Unit

1.00 Rp

6,475,000.00 Rp

6,475,000.00

4 Switch TP-LINK TL-SF1008D 16-ports 10/100Mbps Desktop Switch

Unit

1.00 Rp

987,000.00 Rp

987,000.00

5 TP-LINK TL-WR941HP 450Mbps High Power Wireless N Router (TP-LinkStore) TpLinkStore

Unit

1.00 Rp

875,000.00 Rp

875,000.00

JUMLAH HARGA BAHAN

Rp

23,297,000.00

JUMLAH HARGA ALAT

Rp Rp

-

Rp Rp Rp

26,997,000.00 4,049,550.00 31,046,550.00

PERALATAN

Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)

15% x D

DAFTAR HARGA SATUAN UPAH DAN BAHAN Kegiatan Pekerjaan Lokasi Tahun Anggaran NO

: : : :

PENGADAAN DAN PEMASANGAN JARINGAN INTERNET DAN INTRANET PEMERINTAH KABUPATEN BUTON T PENGADAAN MENARA ANTEN JARINGAN INTERNET KAB.BUTON TENGAH KAB. BUTON TENGAH 2018

URAIAN JENIS

1

SATUAN 2

HARGA ( RUPIAH )

3

4

A.

HARGA SATUAN UPAH KERJA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 B.

Pekerja Tukang Batu Tukang Besi Tukang Cat Tukang Kayu Kepala Tukang Mandor Jasa pemasangan Instalasi tower utama Jasa instalasi Penangkal Petir Jasa instalasi lampu Tower Jasa instalasi Solar Cell Jasa instalasi Jaringan Utama Jasa instalasi Jaringan Client Jasa pemasangan Instalasi Anten Client HARGA BAHAN / MATERIAL LOKAL

1 2 3 4 5 6 D.

Batu Gunung / Kali Kerikil Pecah Gravel / Kerikil Pasir Beton Pasir Pasangan Pasir Urug HARGA BAHAN / MATERIAL TOKO

M3 M3 M3 M3 M3 M3

250,000 300,000 300,000 250,000 250,000 225,000

1

Semen Portlan 50 Kg

2 3 4 5 6

Semen Nat Semen Putih Besi Kanalu 5x10 cm Besi Beton Kawat Beton

Zak Kg Kg Kg Kg Kg Kg

75,000 1,500 1,900 1,900 17,000 17,000 17,000

D. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

21

22 23 24

OH OH OH OH OH OH OH Stage Paket Paket Paket Paket Paket paket

90,000 120,000 120,000 120,000 120,000 125,000 110,000 970,000 1,200,000 750,000 1,200,000 5,500,000 2,500,000 1,200,000

HARGA BAHAN / MATERIAL TOKO

Tower besi Siku Uk.3 cm x 3 cm x 3mm (fourangle) 40x40, 3m per stage Kipas Caping dan segel caping Segel Ditiang Tower Jarum keras N0. 12 (Turn Buckle) Kawat Slink Baja 6 mm Segel/ klam Slink 6mm (kuku Macan) Baut / nut uk.19 x 15 cm Ring Baut / nut uk.19 x 15 cm Kabel Grounding 6mm Tali grounding pembagi Pipa splitz penangkal petir Splitz penangkal petir Stick rood grounding 16mm Clamp Scound Isolator Box Kontrol (beton) wisbar grounding SOLAR CELL PAKET LI STRI K 400 WATT TENAGA SURYA, PAKET SOLAR HOME SYSTEM 100 WP 1 Sol a r Ce l l 100 WP, 1 Se t Ke ra ngka Ti a ng, 1 Aki MF 12 v, 100 Ah, 1 Box Control 12v 8A, 25 m Ka be l PV RADI O UBI QUI TI Na nos ta ti on M2 /UBNT Na nos ta ti onM2 a cce s s poi nt outdoor Ubi qui ti Ne twork dg powe r AP 28dbm (630mW) i nte rna l a nte na 11dBi . Hi Powe r 22 MI MO Ai rMa x TDMA Sta ti on 2.4Ghz Mi kroBi ts Di na ra 8 Gi ga bi t 8 SFP (RoS Le ve l 4), Proce s s or : I nte l @ Qua d Xe on@ Proce s s or Sa ndy Bri dge (3GHz), RAM : 1 x 2048MB DDR3 I ndus tri a l Gra de RAM, HDD I nte rfa ce : 2x SATA, 1x CF Sl ots wi th True I DE I BM Mi croDri ve Support, Compa ct Fl a s h : 1 GB I ndus tri a l Gra de Compa ct Fl a s h for Route rOS, HDD : 250GB SATA 2.5" HDD, Ethe rne t : 8 x 10/100/1000Mbps Gi ga bi t Ethe rne t (I nte l @ 82583V), SFP Ports : 8 x Gi ga bi t SFP, La n by-pa s s : 4 groups , Expa ns i on Sl ots : 1 x PCI e x8 s l ot, Se ri a l port : 1 cons ol e , RJ type , LCDs : 1x ba ck l i t 2cha ra cte r x16 cha ra cte r LCD Di s pl a y, LEDs : Powe r a nd HDD LED, Spe a ke r : Mi ni PC - Spe a ke r, Powe r : I EC C13 Powe r Cord, i nput powe r: 100VAC-250VAC 50Hz- 60Hz (I nte rna ti ona l PSU), Fa n : 3x Re dunda nt CPU/Powe r Suppl y /Cha s s i s Fa ns , Di me ns i ons : 44 mm (H) x 426 mm (W) x 450 mm (D), Powe r Suppl y : 200W ATX PSU, Ope ra ti ng Sys te m : Mi kroTi k Route r OS v5 L 2 SWI TCH s upport L3 l e ngka p dgn SFP (L 2 SWI TCH s upport L3= 20 Bua h, SFP = 40 bua h) (L 2 SWI TCH s upport L3= 20 Bua h, SFP = 40 bua h) + Ca be l l i ng' Ope n ra ck 19 i nch 20 U da n pe ma s a nga n ka be l ra k19 i nch untuk Fi be r Opti c(19 Pcs ) ca bl e i ng powe Ante nr Towe r Monopol e 15 Me te r : Pi pa We l de d 2 i nch, 1.5 i nch, Ba s e pl a te 12mm x 400 x 400

Stage bh Pcs pcs set pcs pcs pcs mtr mtr pcs pcs Btg pcs pcs pcs unit pcs Paket

1,760,000 150,000 10,500 27,000 14,200,000 7,500 17,500 3,500 75,000 35,000 150,000 100,000 1,200,000 40,000 15,000 25,000 350,000 256,000 13,500,000

Set

6,510,000

Set

34,080,000

Paket

12,460,000

paket paket

2,756,000 8,450,000

Unit Unit Unit

6,475,000

Joi n fl a nge 10 mm, Ja ra k pi ja ka n ka ki da ri s a mpi ng ki ri ke ka na n 30cm Ca ka r a ya m da n a ngkur 100 x 100 x 150, Fi ni s hi ng Hot Di p Ga l va ni ze

25

Route r CI SCO RV082-EU VPN Route r 2 port WAN 32 port RJ45, l oa d ba l a nci ng + ca be l i ng

26

Swi tch TP-LI NK TL-SF1008D 32-ports 32/100Mbps De s ktop Swi tch + ca be l i ng

27

TP-LI NK TL-WR941HP 450Mbps Hi gh Powe r Wi re l e s s N Route r (TP-Li nkStore ) TpLi nkStore

987,000 875,000

Labungkari, 20 Oktober 2018 Pejabat Pembuat Komitmen (PPK)

LA OTA, S.Pd NIP. 19720911 199802 1 002

Related Documents

Tower
November 2019 55
Tower
November 2019 60
Tower
April 2020 36
Tower
November 2019 52
Hps 2095
November 2019 23

More Documents from ""

Undangan.docx
December 2019 15
1. Tujuh Snp.xlsx
December 2019 19
Cover Eds.docx
December 2019 18
Dokumentasi Rapat.docx
December 2019 21
Rka_skpd_22.xls
December 2019 16