BAÛNG NGOÂN NGÖÕ Vieät Nam

English

stt

BAÛNG TÍNH KHOÁI LÖÔÏNG

BILL OF QUANTITIES

BAÛNG THOÁNG KEÂ THEÙP

RE-BAR SCHEDULE

BAÛNG TOÅNG HÔÏP COÁT THEÙP

SUMMARY LIST OF RE-BAR

COÂNG TRÌNH:

PROJECT:

HAÏNG MUÏC:

ITEM:

SOÁ TT

ID

DIEÃN GIAÛI

DESCRIPTION

ÑÔN VÒ

UNIT

KHOÁI LÖÔÏNG

QUANTITY

ÑÔN GIAÙ

UNIT PRICE

THAØNH TIEÀN

TOTAL

TEÂN CK

MEMBER

SOÁ CK

N.of M.

SH THEÙP

BAR No.

HÌNH DAÙNG & KÍCH THÖÔÙC

SHAPE & DIMENSION

DAØI 1 THANH (MM)

LENGTH OF BAR (MM)

SOÁ THANH /CK

N.of BAR /PCS

TOÅNG CHIEÀU DAØI (M)

TOTAL OF LENGTH (M)

TOÅNG KHOÁI LÖÔÏNG (KG)

TOTAL OF WEIGHT (KG)

ÑÖÔØNG KÍNH (MM)

DIAMETER (MM)

TOÅNG COÄNG

TOTAL

Ñaøo ñaát

Excavating

1

Coïc cöø traøm

Wooden pile

2

Beâ toâng loùt

Lean concrete

3

Beâ toâng moùng ñôn

Concrete for isolated

4

Beâ toâng moùng baêng

Concrete for band foundation

5

Beâ toâng moùng beø

Concrete for raft foundation

6

Beâ toâng neàn

Concrete for ground floor slab

7

Beâ toâng coå moùng, coät, boå truï

Concrete for pedestal, column, sub-column

8

Beâ toâng daàm, giaèng, lanh toâ

Concrete for beam, brace, lintel

9

Beâ toâng saøn

Concrete for floor slab

10

Beâ toâng oâ-vaêng

Concrete for awning

11

Beâ toâng töôøng

Concrete for R.C. wall

12

Beâ toâng caàu thang

Concrete for staircase

13

Coáp-pha moùng ñôn

Formwork for isolated

14

Coáp-pha moùng baêng

Formwork for band foundation

15

Coáp-pha moùng beø

Formwork for raft foundation

16

Coáp-pha coå moùng, coät, boå truï

Formwork for pedestal, column, sub-column

17

Coáp-pha daàm, giaèng

Formwork for beam, brace

18

Coáp-pha saøn neàn

Formwork for ground floor slab

19

Coáp-pha saøn taàng

Formwork for floor slab

20

Coáp-pha lanh toâ

Formwork for lintel

21

Coáp-pha oâ-vaêng

Formwork for awning

22

Coáp-pha töôøng

Formwork for R.C. wall

23

Coáp-pha caàu thang

Formwork for staircase

24

BAÛNG THEÙP CÔ BAÛN STT

Dieãn giaûi

Hình daùng

L1

L2

1 Straigth

Teân taäp tin straigth

2 Top Both

200

3 Top Left

200

200 topboth topleft

4 Top Right

200 topright

5 Bottom Both

200

6 Bottom Left

200

200 bttboth bttleft

7 Bottom Right 8 Rect Stirrup

L3

200 bttright 120

9 Cir Stirrup

700

300 rectstir cirstir

10 V Reinforcing

200

200 vreinf

11 M Reinforcing

200

200 mreinf

12 Hook Straigth

60

60 hookstr

BAÛNG THOÂNG TIN Dieãn giaûi

Giaù trò

Phaàn höôùng daãn cuûa c

Teân coâng trình

26 NGUYEÃN AN NINH, P. BEÁN THAØNH, Q.1, TP.HCM

Teân haïng muïc

MOÙNG, COÄT, DAÀM, SAØN

Ngoân ngöõ söû duïng

v

QUY ÑÒNH VEÀ MAØ

QUY ÑÒNH VEÀ NUÙ Ctrl+M Ctrl+T Ctrl+L Ctrl+K Ctrl+D

Phaàn höôùng daãn cuûa chöông trình

QUY ÑÒNH VEÀ MAØU SAÉC Coù theå khoâng caàn nhaäp Neân nhaäp khi caàn laäp thoáng keâ theùp Baét buoäc phaûi nhaäp

QUY ÑÒNH VEÀ NUÙT TAÉT Chaïy baûng khoái löôïng Chaïy baûng thoáng keâ theùp Theâm moät doøng trong baûng thoáng keâ Hoaøn taát baûng toång hôïp coát theùp Xoùa taát caû caùc sheet nhaäp lieäu

SAIGONKIEN TRUC

11/30/2009

BAÛNG TÍNH KHOÁI LÖÔÏNG COÂNG TRÌNH:

26 NGUYEÃN AN NINH, P. BEÁN THAØNH, Q.1, TP.HCM

HAÏNG MUÏC:

MOÙNG, COÄT, DAÀM, SAØN

SOÁ TT

DIEÃN GIAÛI

ÑÔN VÒ KHOÁI LÖÔÏNG

1 Concrete for pedestal, column, sub-column C1-H

4* .35* .4* 2.7

=

#VALUE!

C2-H

6* .4* .5* 2.7

=

#VALUE!

CP-H

3* .2* .2* 2.7

=

#VALUE!

C1-T

4* .35* .4* 4

=

#VALUE!

C2-T

6* .4* .5* 4

=

#VALUE!

CP-T

3* .2* .2* 4

=

#VALUE!

C1-L

4* .35* .4* 3

=

#VALUE!

C2-L

6* .4* .5* 3

=

#VALUE!

CP-L

3* .2* .2* 3

=

#VALUE!

C1-L1

4* .35* .4* 3

=

#VALUE!

C2-L1

6* .4* .45* 3

=

#VALUE!

CP-L1

3* .2* .2* 3

=

#VALUE!

C1-L2

4* .35* .4* 3

=

#VALUE!

C2-L2

6* .4* .45* 3

=

#VALUE!

CP-L2

3* .2* .2* 3

=

#VALUE!

C1-L3

4* .35* .4* 3

=

#VALUE!

C2-L3

6* .4* .45* 3

=

#VALUE!

CP-L3

3* .2* .2* 3

=

#VALUE!

C1-L4

4* .3* .35* 3

=

#VALUE!

C2-L4

6* .35* .4* 3

=

#VALUE!

CP-L4

3* .2* .2* 3

=

#VALUE!

C1-L5

4* .3* .35* 3

=

#VALUE!

C2-L5

6* .35* .4* 3

=

#VALUE!

CP-L5

3* .2* .2* 3

=

#VALUE!

C1-L6

4* .3* .35* 3

=

#VALUE!

C2-L6

6* .35* .4* 3

=

#VALUE!

CP-L6

3* .2* .2* 3

=

#VALUE!

C1-L7

4* .3* .3* 3

=

#VALUE!

C2-L7

6* .3* .35* 3

=

#VALUE!

CP-L7

3* .2* .2* 3

=

#VALUE!

C2-M

6* .3* .35* 2.4

=

#VALUE!

2 Concrete for beam, brace, lintel DM-1

1* .5* 1.5* 7.65

=

#VALUE!

DM-2

2* .7* 1.5* 7.65

=

#VALUE!

Bill of Quantities

m3

#VALUE!

m3

#VALUE!

Page 6 /49

SAIGONKIEN TRUC

11/30/2009

DM-3

1* .7* 1.5* 7.8

=

#VALUE!

DM-4

1* .5* 1.5* 8.65

=

#VALUE!

DM-5

1* .4* 1.5* 5.6

=

#VALUE!

1* .4* 1.5* 4.35

=

#VALUE!

1* .4* 1.5* 5.45

=

#VALUE!

1* .4* 1.5* 4.3

=

#VALUE!

1* .4* 1.5* 5.6

=

#VALUE!

1* .4* 1.5* 4.35

=

#VALUE!

DM-7

1* .4* 1.5* 5.45

=

#VALUE!

DM-8

1* .4* 1.5* 5.45

=

#VALUE!

S1

1* .5* .22* 7.65

=

#VALUE!

S1

1* .5* .22* 8.65

=

#VALUE!

S2

1* .5* .22* 7.65

=

#VALUE!

S2

1* .5* .22* 7.8

=

#VALUE!

S3

1* .3* .22* 4.35

=

#VALUE!

DS-1

1* .2* .4* 5.6

=

#VALUE!

1* .2* .4* 4.35

=

#VALUE!

1* .2* .4* 5.45

=

#VALUE!

1* .2* .4* 4.3

=

#VALUE!

1* .2* .4* .5

=

#VALUE!

8* .2* .4* 5.6

=

#VALUE!

8* .2* .4* 4.35

=

#VALUE!

8* .2* .4* 5.45

=

#VALUE!

8* .2* .4* 4.3

=

#VALUE!

8* .2* .4* .5

=

#VALUE!

8* .2* .4* 1.15

=

#VALUE!

1* .2* .4* 5.6

=

#VALUE!

1* .2* .4* 4.35

=

#VALUE!

1* .2* .4* 5.45

=

#VALUE!

8* .2* .4* 5.6

=

#VALUE!

8* .2* .4* 4.35

=

#VALUE!

8* .2* .4* 5.45

=

#VALUE!

8* .2* .4* 1.15

=

#VALUE!

DS-3

9* .2* .4* 5.1

=

#VALUE!

DS-4

1* .2* .4* 5.6

=

#VALUE!

1* .2* .4* 4.35

=

#VALUE!

1* .2* .4* 5.45

=

#VALUE!

1* .2* .4* 4.45

=

#VALUE!

1* .2* .4* .5

=

#VALUE!

DM-6

DS-1a

DS-2

DS-2a

Bill of Quantities

Page 7 /49

SAIGONKIEN TRUC

DS-4a

11/30/2009

8* .2* .4* 5.6

=

#VALUE!

8* .2* .4* 4.35

=

#VALUE!

8* .2* .4* 5.45

=

#VALUE!

8* .2* .4* 4.45

=

#VALUE!

8* .2* .4* .5

=

#VALUE!

DS-5

27* .35* .55* 7.65

=

#VALUE!

DS-6

9* .35* .55* 7.8

=

#VALUE!

DS-7

9* .35* .55* 8.65

=

#VALUE!

DS-8

8* .2* .3* 4.35

=

#VALUE!

DS-9

9* .2* .3* 2.35

=

#VALUE!

DS-10

9* .1* .3* 3.15

=

#VALUE!

DM-1

3* .2* .35* 4.35

=

#VALUE!

3* .2* .35* .8

=

#VALUE!

DM-2

2* .35* .5* 7.65

=

#VALUE!

DM-2a

2* .2* .3* 7.65

=

#VALUE!

3 Concrete for floor slab BM

TREÄT

LÖÕNG

L 1-7

Bill of Quantities

m3

1* 5.6* 7.65* .6* 1

=

#VALUE!

1* 4.35* 7.65* .6* 1

=

#VALUE!

1* 5.45* 7.8* .6* 1

=

#VALUE!

1* 5.1* 8.65* .6* 1

=

#VALUE!

1* 2.1* 7.65* .22* 1

=

#VALUE!

1* 4.35* 4.5* .22* 1

=

#VALUE!

1* 5.45* 7.8* .22* 1

=

#VALUE!

1* 5.1* 8.65* .22* 1

=

#VALUE!

1* 3.2* 5.6* .1* 1

=

#VALUE!

1* 4.45* 5.6* .1* 1

=

#VALUE!

1* 3.2* 4.35* .1* 1

=

#VALUE!

1* 1.2* 4.35* .1* 1

=

#VALUE!

1* 3.2* 5.45* .1* 1

=

#VALUE!

1* 4.45* 5.45* .1* 1

=

#VALUE!

1* 4.05* 5.1* .1* 1

=

#VALUE!

1* 4.3* 4.6* .1* 1

=

#VALUE!

7* 3.2* 5.6* .1* 1

=

#VALUE!

7* 4.45* 5.6* .1* 1

=

#VALUE!

7* 3.2* 4.35* .1* 1

=

#VALUE!

7* 1.2* 4.35* .1* 1

=

#VALUE!

7* 3.2* 5.45* .1* 1

=

#VALUE!

7* 4.45* 5.45* .1* 1

=

#VALUE!

7* 4.05* 5.1* .1* 1

=

#VALUE!

#VALUE!

Page 8 /49

SAIGONKIEN TRUC

KT

MAÙI

Bill of Quantities

11/30/2009

7* 4.3* 4.6* .1* 1

=

#VALUE!

7* 1.15* 3.2* .1* 1

=

#VALUE!

7* 1.15* 4.45* .1* 1

=

#VALUE!

1* 1.15* 4.4* .1* 1

=

#VALUE!

1* 1.15* 3.25* .1* 1

=

#VALUE!

1* 4.4* 5.6* .1* 1

=

#VALUE!

1* 3.25* 5.6* .1* 1

=

#VALUE!

1* 4.35* 4.4* .1* 1

=

#VALUE!

1* 4.4* 5.45* .1* 1

=

#VALUE!

1* 3.25* 5.45* .1* 1

=

#VALUE!

1* 5.1* 5.15* .1* 1

=

#VALUE!

1* 3.4* 4.3* .1* 1

=

#VALUE!

1* 3.825* 4.35* .1* 2

=

#VALUE!

1* .8* 3.825* .1* 4

=

#VALUE!

Page 9 /49

SAIGONKIEN TRUC

11/30/2009

Bill of Quantities

Page 10 /49

OÁI LÖÔÏNG

SAIGONKIEN TRUC

11/30/2009

Bill of Quantities

Page 11 /49

SAIGONKIEN TRUC

11/30/2009

Bill of Quantities

Page 12 /49

SAIGONKIEN TRUC

11/30/2009

Bill of Quantities

Page 13 /49

CIDECO

11/30/2009

BAÛNG THOÁNG KEÂ THEÙP COÂNG TRÌNH:

26 NGUYEÃN AN NINH, P. BEÁN THAØNH, Q.1, TP.HCM

HAÏNG MUÏC:

MOÙNG, COÄT, DAÀM, SAØN

2 3 4 5 6 7 8 9 10 ÑG-1

1

1 2 3

Rebar Schedule

1100 900

1800 1800 1500 1750 1750 1750 1750 1750 2600 3000 4200 4200 8400

900 1100 1300 900 1100

1100 900

1100

1

900

1

900 1100 3700

M-4

3700

1100

5

1800

1900

900 1100 900

4

1800

1900

1100

3

700

1000 2900 3400 900

2

700

200 1000

1

900 1100 120 900 1100

3

1100

M-3

6100

900

5

900 1100 120

4

1100

3

3100

900 1100 900

2

3100

1100

1

120 120 900

3

1000

M-2

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

200 1000

TEÂN CK

10

#VALUE!

3

#VALUE!

20

#VALUE!

7

#VALUE!

10

#VALUE!

15

#VALUE!

12

#VALUE!

15

#VALUE!

8

#VALUE!

5

#VALUE!

10

#VALUE!

7

#VALUE!

20

#VALUE!

7

#VALUE!

10

#VALUE!

8

#VALUE!

12

#VALUE!

8

#VALUE!

8

#VALUE!

5

#VALUE!

10

#VALUE!

8

#VALUE!

10

#VALUE!

8

#VALUE!

10

#VALUE!

7

#VALUE!

10

#VALUE!

7

#VALUE!

10

#VALUE!

7

#VALUE!

20

#VALUE!

15

#VALUE!

10

#VALUE!

7

#VALUE!

10

#VALUE!

7

#VALUE!

8

#VALUE!

5

#VALUE!

8

#VALUE!

5

#VALUE!

20

#VALUE!

10

#VALUE!

16

#VALUE!

2

#VALUE!

20

#VALUE!

3

#VALUE!

Page 14/49

CIDECO

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

4100

4

2

680

5700

1000

5700

200

2

120

1

1000

2

1880

200

ÑG-3

4850 680 1000

2

5800 5800

200

1

120

1

1000

ÑG-4

1880

200

3 4

4900

1

1 2

200 1000

ÑG-5

120

3 4

2 3 4

Rebar Schedule

1000 120

1

1000

1

200 200

ÑG-6

1880 6920 6920 5460

3 4

4200 4100

3 4

4200

680

1

200 1000

3

1880

1880 4200 4200 4200 4200

1000 680

ÑG-2

1880

1000

7

200 1000 120 120

6

200 1000 1280 680

4100

5

200 200

TEÂN CK

11/30/2009

20

#VALUE!

3

#VALUE!

12

#VALUE!

3

#VALUE!

8

#VALUE!

24

#VALUE!

8

#VALUE!

24

#VALUE!

20

#VALUE!

12

#VALUE!

20

#VALUE!

2

#VALUE!

12

#VALUE!

2

#VALUE!

8

#VALUE!

24

#VALUE!

16

#VALUE!

10

#VALUE!

16

#VALUE!

2

#VALUE!

12

#VALUE!

2

#VALUE!

8

#VALUE!

33

#VALUE!

16

#VALUE!

12

#VALUE!

16

#VALUE!

2

#VALUE!

12

#VALUE!

2

#VALUE!

8

#VALUE!

34

#VALUE!

20

#VALUE!

14

#VALUE!

20

#VALUE!

2

#VALUE!

12

#VALUE!

2

#VALUE!

8

#VALUE!

40

#VALUE!

16

#VALUE!

4

#VALUE!

16

#VALUE!

10

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

5

4100

12

#VALUE!

2

#VALUE!

6

4100

12

#VALUE!

2

#VALUE!

Page 15/49

CIDECO

C1-H

4

6

3

Rebar Schedule

4

1280 680 300 200 280 300 200 280 300 200 280

480 2490

1

380 2490 380 2490

1 2

C1-Tr

4200

1 2

CT-H

4200

1 2

C2-H

300

3

200

2

480

280

1

4200

300

1

4200

200

ÑK-5

480

280

3

10050

380

2

10050

580

1

480

280 3740

280

1

120

ÑK-4

120

3

300

2

200

1

120

1

300

ÑK-3

200

3

5800

120

2

5800

300

1

200

1

120

ÑK-2

480

300

3

5850

200

2

5850

120

1

120

1

120

ÑK-1

1880

300

8

1880

200

7

120

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

120

TEÂN CK

11/30/2009

8

#VALUE!

24

#VALUE!

8

#VALUE!

24

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

34

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

34

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

58

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

24

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

24

#VALUE!

16

#VALUE!

8

#VALUE!

6

#VALUE!

18

#VALUE!

20

#VALUE!

8

#VALUE!

6

#VALUE!

18

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

18

#VALUE!

16

#VALUE!

6

#VALUE!

Page 16/49

CIDECO

2 C2-L1

6

3

C1-L2

4

C2-L2

6

CT-L2

3

C1-L3

Rebar Schedule

4

1

380

380 480 280 380 480 280

2940

1 2

280 2940

1 2

280 2940

1 2

380 2940

1 2

280 2940

1 2

CT-L1

2940

1

380

4

280

380

2 C1-L1

2940

1

280

3

380

CT-L

380

380

2

380 2940

1 120

6

120

C2-L

120

2

280 2940

1

120

4

120

C1-L

120

2

580 3740

1

120

3

120

2 CT-Tr

3740

1

120

6

120

C2-Tr

380

280 2940

280

2

120

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

120

TEÂN CK

11/30/2009

6

#VALUE!

26

#VALUE!

20

#VALUE!

8

#VALUE!

6

#VALUE!

26

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

26

#VALUE!

16

#VALUE!

6

#VALUE!

6

#VALUE!

21

#VALUE!

20

#VALUE!

6

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

16

#VALUE!

6

#VALUE!

6

#VALUE!

21

#VALUE!

20

#VALUE!

6

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

16

#VALUE!

6

#VALUE!

6

#VALUE!

21

#VALUE!

20

#VALUE!

6

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

Page 17/49

CIDECO

6

CT-L5

3

4

C2-L6

6

CT-L6

3

C1-L7

4

C2-L7

Rebar Schedule

6

1

280

280 380 280 280 380 280 280

2940

1 2

280 2940

1 2

280 2940

1 2

280 2940

1 2

280 2940

1 2

C1-L6

2940

1 2

280

280

2 C2-L5

2940

1

280

4

280

280

2 C1-L5

2940

1

280

3

280

280

CT-L4

120

2

280 2940

1

120

6

120

C2-L4

120

2

280 2940

1

120

4

120

C1-L4

120

2

280 2940

1

120

3

120

2 CT-L3

2940

1

120

6

120

C2-L3

280

280 2940

280

2

120

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

120

TEÂN CK

11/30/2009

6

#VALUE!

21

#VALUE!

16

#VALUE!

6

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

16

#VALUE!

6

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

Page 18/49

CIDECO

120

280 280

4

#VALUE!

6

#VALUE!

21

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

10

#VALUE!

14

#VALUE!

4

#VALUE!

6

#VALUE!

10

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

5

3625

16

#VALUE!

1

#VALUE!

6

3600

16

#VALUE!

1

#VALUE!

6

#VALUE!

125

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

1

580

280

2500

21550+ 1* 480

200 350

4

21550+ 1* 480 2887.5

20

#VALUE!

2

#VALUE!

4

2500

16

#VALUE!

2

#VALUE!

5

3625

16

#VALUE!

1

#VALUE!

6

3600

16

#VALUE!

2

#VALUE!

6

#VALUE!

125

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

1

#VALUE!

6

#VALUE!

24

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

20

#VALUE!

2

#VALUE!

1

580

280

3

4200 4200 2800

3

120

280

21550+ 1* 480

350

21550+ 1* 480

200

2

350

1

580

200

4

Rebar Schedule

#VALUE!

#VALUE!

3

1

14

2

2

DS-4

#VALUE!

#VALUE!

7 1

21

20

2

DS-3

#VALUE!

2887.5

350

1

21550+ 1* 480

6

3

7 DS-2

280

2

21550+ 1* 480

200 350

1

280

200

1

120

2 DS-1

1340

1

200 350

3

280

120

CT-M

1340

1 2

280

200 350

1

120

2 C2-M

2940

1

120

3

350

CT-L7

280

280

2

120

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

200

TEÂN CK

11/30/2009

2887.5

Page 19/49

CIDECO

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M) 2500

4

3550

5

3600

20

#VALUE!

1

#VALUE!

6

#VALUE!

125

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

#VALUE!

2

#VALUE!

5

3550

16

#VALUE!

1

#VALUE!

6

3625

16

#VALUE!

1

#VALUE!

7

3600

20

#VALUE!

1

#VALUE!

6

#VALUE!

125

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

24

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

24

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

24

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

1425

16

#VALUE!

1

#VALUE!

2887.5

20

#VALUE!

2

#VALUE!

1

4200

350 280

16

4200

350 120

4200

350 180

4200

200

2800

4

120

580

180

22750+ 2* 480

350

22750+ 1* 480

200

3

580

350

2

4200

350 200

1

4200

2800

3 4

580

200

1

580

2800 200 350 120

1

2

Rebar Schedule

#VALUE!

2500

4

7

1

4

3

DS-9

#VALUE!

#VALUE!

2

56

16

2

4

DS-8

#VALUE!

#VALUE!

3

7

2

20

2

DS-7

#VALUE!

2887.5

200

8

21550+ 1* 480

16

3

8 DS-6

350 280

2

21550+ 1* 480

200

1

350 120

1

580

200

DS-5

350 120

7

200

6

200 350 180

TEÂN CK

11/30/2009

Page 20/49

CIDECO

TEÂN CK

11/30/2009

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

2500

5

3600

16

#VALUE!

2

#VALUE!

6

#VALUE!

132

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

1425

16

#VALUE!

1

#VALUE!

4

2887.5

20

#VALUE!

2

#VALUE!

5

2500

20

#VALUE!

2

#VALUE!

6

3550

16

#VALUE!

1

#VALUE!

7

3600

16

#VALUE!

2

#VALUE!

6

#VALUE!

132

#VALUE!

14

#VALUE!

1

#VALUE!

14

#VALUE!

1

#VALUE!

6

#VALUE!

24

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

16

#VALUE!

2

#VALUE!

6

#VALUE!

24

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

24

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

1 2

280

2

4200

200 300

DS-12

4200

480

80

3

580

4200

200 300

2

120

1

2

Rebar Schedule

300 180

1

200

2

480 22750+ 1* 420

300 180

DS-14

4200

22750+ 1* 420

200

3

300 120

2

4200

200

1

300 120

3

200

DS-13

4200 2700

3 4

22750+ 1* 480

200 300

8

22750+ 2* 480

120

1

580

280

7

200 350

#VALUE!

120

1

350 200 350

#VALUE!

3

1

#VALUE!

16

2

DS-11

2

3550

200 300

7

#VALUE!

6

8 DS-10

20

480

3

2887.5

14

#VALUE!

2

#VALUE!

4

2512.5

14

#VALUE!

2

#VALUE!

5

2500

14

#VALUE!

2

#VALUE!

Page 21/49

CIDECO

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

14

#VALUE!

2

#VALUE!

7

3500

14

#VALUE!

2

#VALUE!

6

#VALUE!

132

#VALUE!

14

#VALUE!

1

#VALUE!

14

#VALUE!

1

#VALUE!

6

#VALUE!

17

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

12

#VALUE!

14

#VALUE!

1

#VALUE!

14

#VALUE!

1

#VALUE!

6

#VALUE!

12

#VALUE!

14

#VALUE!

2

#VALUE!

14

#VALUE!

2

#VALUE!

6

#VALUE!

24

#VALUE!

8

#VALUE!

43

#VALUE!

8 1 2 3 1 2 3 1 2 3 1

1 2 3

SAN TRET

1

1

2000 2000 380 4200 4200 380 2840

10

#VALUE!

30

#VALUE!

3

2900

6

#VALUE!

7

#VALUE!

4

4200

6

#VALUE!

7

#VALUE!

5

4140

10

#VALUE!

60

#VALUE!

8

#VALUE!

43

#VALUE!

5790

7

4200

6

#VALUE!

11

#VALUE!

8

5850

6

#VALUE!

11

#VALUE!

9

1240

10

#VALUE!

43

#VALUE!

8

#VALUE!

14

#VALUE!

4140

11

1300

6

#VALUE!

3

#VALUE!

12

4200

6

#VALUE!

3

#VALUE!

13

4140

10

#VALUE!

59

#VALUE!

8

#VALUE!

43

#VALUE!

14

Rebar Schedule

380

4140

10

1

2000

2

6

SAN LUNG

2000

60

DT-2a

380

60

10

2900

5740

60

DT-3

2900

15

4200

6

#VALUE!

11

#VALUE!

16

5800

6

#VALUE!

11

#VALUE!

6

#VALUE!

108

#VALUE!

1

3840

60

1

60

DT-2

60

11

60

DT-1

480

60 280 200 250 80 200 250 280 200 250 80 200 250 180

3525

60 120 200 250 120 200 250 120 200 250 120 200 250 120

6

60

TEÂN CK

11/30/2009

Page 22/49

CIDECO

Rebar Schedule

60

#VALUE!

102

#VALUE!

80

1950

6 8

#VALUE!

87

#VALUE!

80

60 80

4

1950

80

3

4140

8

#VALUE!

81

#VALUE!

6

#VALUE!

10

#VALUE!

#VALUE!

108

#VALUE!

#VALUE!

45

#VALUE!

#VALUE!

66

#VALUE!

#VALUE!

27

#VALUE!

7 8 9 10

1590

60

4200

6

4140

60

6

6

825

80

#VALUE!

8

825

80

10

60

#VALUE!

60

6

80

3900

80

5

8

4

#VALUE!

12

4200

6

#VALUE!

4

#VALUE!

#VALUE!

36

#VALUE!

#VALUE!

12

#VALUE!

13 14

1240

60

#VALUE!

6

4140

60

6

60

1650

60

11

6

6

#VALUE!

3

#VALUE!

#VALUE!

108

#VALUE!

#VALUE!

102

#VALUE!

#VALUE!

87

#VALUE!

#VALUE!

81

#VALUE!

1 2 3 4

3840

60

4200

3

4140

60

16

6

1950

80

#VALUE!

8

1950

80

3

60

#VALUE!

60

6

80

1300

80

15

8

4200

6

#VALUE!

10

#VALUE!

#VALUE!

108

#VALUE!

#VALUE!

45

#VALUE!

#VALUE!

66

#VALUE!

#VALUE!

27

#VALUE!

7 8 9 10

1590

60

6

6

4140

60

#VALUE!

6

825

80

10

8

825

80

#VALUE!

60

6

60

3900

80

5

80

8

1650

6

#VALUE!

4

#VALUE!

12

4200

6

#VALUE!

4

#VALUE!

#VALUE!

36

#VALUE!

#VALUE!

12

#VALUE!

13 14

1240

60

11

6

4140

60

7

2

60

SAN LAU DIEN HINH

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

60

TEÂN CK

11/30/2009

6

15

1300

6

#VALUE!

3

#VALUE!

16

4200

6

#VALUE!

3

#VALUE!

Page 23/49

CIDECO

4140

11

#VALUE!

6

#VALUE!

3

#VALUE!

6

#VALUE!

3

#VALUE!

#VALUE!

120

#VALUE!

#VALUE!

66

#VALUE!

#VALUE!

177

#VALUE!

8

#VALUE!

66

#VALUE!

4140

60

8

5740

60

8

2100

100

10

2100

100

11

#VALUE!

6

5800

6

#VALUE!

11

#VALUE!

8

#VALUE!

22

#VALUE!

8

#VALUE!

8

#VALUE!

8

1240

60

#VALUE!

4140

60

6

60

4200

60

5

7

3

#VALUE!

10

4200

6

#VALUE!

3

#VALUE!

#VALUE!

22

#VALUE!

#VALUE!

7

#VALUE!

6

#VALUE!

3

#VALUE!

6

#VALUE!

3

#VALUE!

11 12

14

1140

60

#VALUE!

8

4140

60

6

60

1300

60

9

13

Rebar Schedule

#VALUE!

60

4

6

60

3

#VALUE!

100

2

36

100

1

#VALUE!

4200

20 1

6

1200

19

SAN MAI

60

18

1140

60

17

60

SOÁ TOÅNG SOÁ SH Þ DAØI 1 HÌNH DAÙNG & KÍCH THÖÔÙC THANH / CHIEÀU DAØI CK THEÙP (MM) THANH (MM) CK (M)

60

TEÂN CK

11/30/2009

8

1200

4200

Page 24/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 25/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 26/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 27/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 28/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 29/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 30/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 31/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 32/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 33/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 34/49

CIDECO

11/30/2009

TOÅNG KHOÁI LÖÔÏNG (KG)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Rebar Schedule

Page 35/49

CIDECO

11/30/2009

BAÛNG TOÅNG HÔÏP COÁT THEÙP COÂNG TRÌNH:

26 NGUYEÃN AN NINH, P. BEÁN THAØNH, Q.1, TP.HCM

HAÏNG MUÏC:

MOÙNG, COÄT, DAÀM, SAØN

ÑÖÔØNG KÍNH (MM)

TOÅNG CHIEÀU DAØI (M)

TOÅNG KHOÁI LÖÔÏNG (KG)

6

#VALUE!

#VALUE!

8

#VALUE!

#VALUE!

10

#VALUE!

#VALUE!

12

-

-

14

#VALUE!

#VALUE!

16

#VALUE!

#VALUE!

18 20

#VALUE!

#VALUE!

22

-

-

25

-

-

28

-

-

32

-

-

48

-

-

TOTAL

Summary List of Re-bar

#VALUE!

#VALUE!

Page 36/49

MOÙNG ÑÔN KH

M-2

sck

3

am

bm

ac

bc

hm

hc

hdeep

npile

m

m

m

m

m

m

m

pl/m2

0.25

0.35

0.7

3.1

1.1

1.1

1.8

ϕa

na

3

nb

mm 3

10

15

3

12

31

M-3

3

1.85

1.9

0.25

0.35

1.1

1.1

1.8

9

10

9

9

12

9

M-4

1

1.8

4.2

0.25

0.25

1.1

1.1

1.8

21

10

9

21

10

9

ϕb mm 10 20 10 20 10 10

NEÀN KH

sck

a

b

d

npile

m

m

m

pl/m

2

ϕa

@

ϕb

@

mm

mm

mm

mm

COÄT & BOÅ TRUÏ KH

sck

b

h

H

Hn

m

m

m

m

ϕ1

n1

mm

n2

ϕ2

ϕd

@

mm

mm

mm

nd

C1-H

4

0.25

0.25

2.55

0

8

16

6

150

2

C2-H

6

0.35

0.25

2.55

0

8

20

6

150

2

CT-H

3

0.2

0.2

2.55

0

4

14

6

150

2

C1-Tr

4

0.25

0.25

3.8

0

6

16

6

150

2

C2-Tr

6

0.3

0.35

3.8

0

8

20

6

150

2

CT-Tr

3

0.2

0.2

3.8

0

4

14

6

150

2

C1-L

4

0.25

0.25

3

0

6

16

6

150

2

C2-L

6

0.3

0.25

3

0

6

20

6

150

2

CT-L

3

0.2

0.2

3

0

4

14

6

150

2

C1-L1

4

0.25

0.2

3

0

6

16

6

150

2

C2-L1

6

0.25

0.25

3

0

6

20

6

150

2

CT-L1

3

0.2

0.2

3

0

4

14

6

150

2

C1-L2

4

0.25

0.2

3

0

6

16

6

150

2

C2-L2

6

0.25

0.25

3

0

6

20

6

150

2

CT-L2

3

0.2

0.2

3

0

4

14

6

150

2

C1-L3

4

0.2

0.2

3

0

4

14

6

150

2

C2-L3

6

0.25

0.2

3

0

6

16

6

150

2

CT-L3

3

0.2

0.2

3

0

4

14

6

150

2

C1-L4

4

0.2

0.2

3

0

4

14

6

150

2

C2-L4

6

0.25

0.2

3

0

6

16

6

150

2

CT-L4

3

0.2

0.2

3

0

4

14

6

150

2

C1-L5

4

0.2

0.2

3

0

4

14

6

150

2

C2-L5

6

0.2

0.2

3

0

4

14

6

150

2

CT-L5

3

0.2

0.2

3

0

4

14

6

150

2

C1-L6

4

0.2

0.2

3

0

4

14

6

150

2

C2-L6

6

0.2

0.2

3

0

4

14

6

150

2

CT-L6

3

0.2

0.2

3

0

4

14

6

150

2

C1-L7

4

0.2

0.2

3

0

4

14

6

150

2

C2-L7

6

0.2

0.2

3

0

4

14

6

150

2

CT-L7

3

0.2

0.2

3

0

4

14

6

150

2

C2-M

1

0.2

0.2

1.4

0

4

14

6

150

2

CT-M

3

0.2

0.2

1.4

0

4

14

6

150

2

DAÀM & ÑAØ KH

DS-1

DS-2

sck

1

1

b

h

Ln

m

m

m

ϕt

nt

ϕd

nd

mm

0.2

0.35

5.7

0.2

0.35

5.85

0.15

0.35

4.2

0.2

0.35

5.8

0.2

0.35

5.7

0.2

0.35

5.85

0.2

0.35

4.2

0.2

0.35

5.8

2

2

16

16

mm 2

2

0.2

0.35

4.2

2

16

2

16

DS-4

1

0.2

0.35

5.7

2

16

2

16

0.2

0.35

5.85

0.15

0.35

4.2

0.2

0.35

5.8

0.2

0.35

5.7

0.2

0.35

5.85

0.2

0.35

4.2

0.2

0.35

5.8

2

16

2

16

DS-6

8

0.15

0.35

4.2

2

14

2

14

DS-7

7

0.15

0.35

4.2

2

14

2

14

DS-8

56

0.15

0.35

4.2

2

14

2

14

DS-9

7

0.2

0.35

1.2

2

16

2

16

0.2

0.35

5.7

0.2

0.35

5.85

0.15

0.35

4.2

0.2

0.35

5.8

0.2

0.35

1.2

0.2

0.35

5.7

0.2

0.35

5.85

0.2

0.35

4.2

0.2

0.35

5.8

DS-10

7

1

2

16

2

ϕgp

ngp

mm

16

1

1

10

16

DS-3

DS-5

ϕgt

ngt

16

mm 2

20

2

16

2

20

2

16

2

20

2

16

2

20

2

16

2

20

2

20

2

20

2

20

16 1

16

DS-11

1

0.1

0.3

4.2

1

14

1

14

DS-12

2

0.15

0.3

4.2

2

16

2

16

DS-13

3

0.15

0.3

4.2

2

14

2

14

DS-14

2

0.15

0.3

1.2

2

14

2

14

0.15

0.3

5.7

2

14

0.15

0.3

5.85

2

14

0.15

0.3

4.2

2

14

0.15

0.3

5.8

DT-1

11

0.1

0.25

2.9

1

14

1

14

DT-2

1

0.2

0.25

2

2

14

2

14

DT-3 DT-2a ÑG-1

10

0.1

0.25

2

1

14

1

14

1

0.2

0.25

1.95

2

14

2

14

0.2

0.25

2.25

0.4

1

4.2

10

20

3

20

0.7

1

4.2

2

16

1

ÑG-2

3

0.4

1

4.2

12

20

2

20

ÑG-3

2

0.4

1

5.7

10

16

2

16

ÑG-4

1

0.4

1

5.8

12

16

2

16

ÑG-5

1

0.4

1

6.92

14

20

2

20

ÑG-6

1

0.7

1

4.2

4

16

2

16

0.4

1

4.2

10

16

2

16

ÑK-1

1

0.2

0.3

5.85

2

14

2

14

ÑK-2

1

0.2

0.3

5.8

2

14

2

14

ÑK-3

1

0.2

0.3

5.85

2

14

2

14

0.2

0.3

4.2

ÑK-4

1

0.2

0.3

4.2

2

14

2

14

ÑK-5

1

0.2

0.3

4.2

2

14

2

14

nnhip

ϕnhip

ϕd

mm

mm

1

16

1

16

nd

6

2

6

2

1

16

2

16

1

16

6

2

1

16

6

2

1

20

1

16

6

2

1

16

1

20

2

14

6

2

2

14

6

2

2

14

6

2

6

2

6

2

6

2

6

2

6

2

6

2

6

2

6

2

1

16

2

16

1

16

2

16

2

16

2

14

2

14

6

2

6

2

3

20

8

2

3

12

8

2

2

12

8

2

2

12

8

2

2

12

8

2

2

12

8

2

2

12

8

2

2

12

8

2

6

2

6

2

6

2

6

2

6

2

SAØN KH

SAN TRET

SAN LUNG

SAN LAU DIEN HINH

SAN MAI

sck

1

1

7

1

L1

L2

d

m

m

m

Ns

ϕ1n

@

ϕ1g

@

ϕ2n

mm

mm

mm

mm

mm

2.9

4.2

0.15

1

8

100

10

4.2

5.85

0.15

1

10

100

8

1.3

4.2

0.15

1

10

100

8

4.2

5.8

0.15

1

10

100

8

3.9

4.2

0.08

3

6

120

8

150

6

1.65

4.2

0.08

3

6

120

8

200

6

1.3

4.2

0.08

1

6

120

3.9

4.2

0.08

3

3

120

8

150

6

1.65

4.2

0.08

3

6

120

8

200

6

1.3

4.2

0.08

1

6

120

6

1.2

4.2

0.08

1

6

120

6

4.2

5.8

0.1

3

8

150

1.3

4.2

0.1

1

8

200

8

1.2

4.2

0.1

1

8

200

8

6

10

100

8

@

ϕ2g

@

mm

mm

mm

100 100 100 100 120

8

150

120

8

200

120

8

150

120

8

200

8

200

120

120 120 200 200 200

OÂ VAÊNG KH

sck

b

L

d

ϕc

@

ϕp

@

m

m

m

mm

mm

mm

mm

TÖÔØNG KH

sck

H

L

d

ϕH

@

ϕL

@

m

m

m

mm

mm

mm

mm

n

Related Documents

26 Nguyen An Ninh
June 2020 3
An Ninh Mang
November 2019 13
An Ninh Mang
October 2019 12
Ninh
November 2019 15
An-cau-nguyen-yeu
May 2020 20
Nguyen
June 2020 22