The Skyscraper Project: Group Plan & Contract Group Members: 1.
3. 4.
2. What are you building? 1.
2.
What Materials will you use? Material…
List all major measurements here: Actual Measurement
... Used for:
Ratio
Model Measurement
Group Member:
Teacher/Aide Approval:
What is this member doing for the 9/16 Checkpoint?
Meet/Fail
Meet/Fail
Meet/Fail
Meet/Fail
What is this member doing for the 9/23 Checkpoint?
Meet/Fail
Meet/Fail
Meet/Fail
Meet/Fail
What am I bringing during the 9/30-10/2 workdays?
Meet/Fail
Meet/Fail
Meet/Fail
Meet/Fail
Contact Information:
Have we thoroughly planned and prepared before building? Do we have all reasonable measurements needed to build? Will this project be challenging? How? How do we contact Mr. Little if we need his help? How are we stirring blood, being creative, and being innovative? *************************************** All necessary blueprints (minimum of all 4 sides and top view) must be stapled to this sheet. Groups working on multiple buildings may only complete one blueprint per side if their building has uniform sides. We, the Group Members, agree to the plans laid out in this Group Plan. We will waste no time to complete this project to the best of our abilities and will communicate and collaborate with one another. We understand and operate under Mr. Little’s “3 strike rule.” Signed:
1.
3.
2.
4.
Approval of Mr. Little: