RAVEN’S AIT COMMUNITY CENTRE RAVEN’S AIT IS A VOLUNTEER BASED ENVIRONMENTAL COMMUNITY PROJECT, DIRECTED TOWARDS PIVOTAL DEVELOPMENTS RELATING TO SUSTAINABLE ENERGY, CARBON NEUTRALITY, YOUTH EDUCATION AND ENVIRONMENTAL AWARENESS PROGRAMMES IT IS THE INTENTION THAT THE ISLAND BECOMES A SHOWCASE FOR THE UK AND OTHER INTERNATIONAL COMMUNITIES, ACTING AS A ‘BACKYARD’ TO LOCAL SCHOOLS, UNIVERSITIES, SOCIETIES AND INDIVIDUALS THE ISLAND HAS A LONG AND SIGNIFICANT HISTORY, DATING BACK IN PART TO THE 12TH CENTURY. IN ORDER TO PRESERVE THIS, A SYMPATHETIC INFRASTRUCTURE IS BEING IMPLEMENTED TO ENSURE A LONG AND SUSTAINABLE FUTURE IN ESSENCE, THE OBJECTIVE IS TO FASHION A SENSITIVE REFURBISHMENT OF THE EXISTING BUILDINGS. REGENERATING THE ISLANDS LANDSCAPE, UTILISING A GOOD MIX OF TRADITIONAL TECHNIQUES AND MODERN TECHNOLOGIES TO PROVIDE A SUSTAINABLE PLACE FOR THE COMMUNITY AND A STRONG PRECEDENT FOR OTHER COMMUNITIES TO TAKE DIRECT ACTION WITHIN THEIR OWN ENVIRONMENT
will sandy - landscape architecture - contact:
[email protected]
RAVEN’S AIT LOCATION & CONTEXT - IN 1217 THE ‘TREATY OF LAMBETH’ WAS SIGNED HERE LEADING TO THE RATIFICATION OF THE MAGNA CARTA 1215 - RAVEN’S AIT IS LOCATED WITHIN THE THAMES LANDSCAPE STRATEGY - HAMPTON TO KEW
KINGSTON TOWN CENTRE
KINGSTON TO WATERLOO IN 20 MIN
KINGSTON UNIVERSITY KNIGHTS PARK CAMPUS HAMPTON COURT PALACE KINGSTON UNIVERSITY PENRHYN ROAD CAMPUS
RAVEN’S AIT COMMUNITY CENTRE will sandy - landscape architecture - contact:
[email protected]
SURBITON TO WATERLOO IN 20 MIN
SPACE 1 OPEN SPACE EVENT SPACE TEMPORARY STAGE
SPACE 2 VEGETABLE GARDEN CAFE TERRACE SPACE FOR YOUTH WORKSHOPS ECO-PLAYROUND WILDLIFE AREA OUTDOOR EDUCATION STAFF ACCOMODATION
SPACE 3 IMPROVED RECEPTION IMPROVED ACCESS CAFE SHOP OPEN CLASSROOM W/C
SPACE 4 CONFERENCE SPACE ACCESS TO STUDIOS BOAT SHEDS W/C
SPACE 5 ENVIRONMENTAL SPACE - PROJECT TESTING RENEWABLE ENERGY SHOWCASE STUDIO TERRACE BOAT HIRE COMMUNITY BOAT CLUB
BOAT
HIRE
VI R
TO
SI G N RI
O
O
M
CONNECTION
STAGE
PERMANENT MOORINGS
S
N
will sandy - landscape architecture - contact:
[email protected]
RAVEN’S AIT ISLAND KINGSTON-UPON-THAMES SCALE 1:500 @ A2 MAY 2009
RAVEN’S AIT FUTURE VISION
GREEN WALL INSTALLED
LANDING STAIRS & ENTRANCE
ENHANCED ENTRANCE STEPS
IMPROVED ACCESS
will sandy - landscape architecture - contact:
[email protected]
REFURBISHED RECEPTION AREA
NEW SIGNAGE
RAVEN’S AIT FUTURE VISION
NORTH SIDE - ENVIRONMENTAL PLAYGROUND
GREEN WALL INSTALLED
VERTICAL AXIS WIND TURBINES
HOME PARK / HAMPTON COURT
WATERWHEEL
BOAT HIRE AVAILABLE
will sandy - landscape architecture - contact:
[email protected]
RAVEN’S AIT FUTURE VISION
NORTH SIDE - COMMUNITY BOAT CLUB SLIPWAY VERTICAL AXIS WIND TURBINES GREEN WALLS INSTALLED HOME PARK / HAMPTON COURT NEW PERMANENT MOORINGS
COMMUNITY BOAT CLUB SLIPWAY
will sandy - landscape architecture - contact:
[email protected]
RAVEN’S AIT HEDGE PLANTING - WINTER 2009
(DATE TO BE CONFIRMED)
WHIP PLANTING ACTIVITY DAY
TOOLS PROVIDED - SPADE - RABBIT GUARD (FOR THE GEESE) - CANE - MULCH
ALL ARE WELCOME CREATIVITY
PLEASE BRING YOUR OWN GLOVES
TECHNIQUE (SIMPLIFIED)
ACTIVITY
- DIG HOLE FOR WHIP LARGE ENOUGH FOR THE ROOTS TO SPREAD OUT EVENLY - ABOUT 1/3 BIGGER THAN ROOT SIZE - BACKFILL WITH SOIL - SET CANE IN NEXT TO WHIP - WRAP GUARD AROUND THE CANE & WHIP - MULCH HEDGEROW
SKILL-SHARING EDUCATION
PLANTING PATTERN
45
CM
50CM
- HAWTHORN / CRATAEGUS MONOGYNA - HAZEL / CORLYUS AVELLANA - ASH / FRAXINUS EXCELSIOR - FIELD MAPLE / ACER CAMPESTRE - GOAT WILLOW / SALIX CAPREA
INITIAL LOCATIONS - TO BE CONFIRMED
STAGE
HEDGE MIX - SPECIES
LAID HEDGE LOCATIONS
FLANKING OUTDOOR WORKSHOP SPACE will sandy - landscape architecture - contact:
[email protected]
FLANKING EXISTING VEGETABLE GARDEN
EACH CHILD INVOLVED TO BE GIVEN THEIR OWN WHIP TO TAKE HOME, LOOK AFTER - TO WATCH THE PROGRESS OF THE HEDGE AT HOME
RAVEN’S AIT HEDGE LAYING - WINTER 2010
(DATE TO BE CONFIRMED)
HEDGE LAYING ACTIVITY DAY
TOOLS PROVIDED - LOOPERS (ESP. SUITABLE FOR NOVICE USE) - BILLHOOKS - AXES - SLASHERS - PRUNING SHEERS
ALL ARE WELCOME CREATIVITY
PLEASE BRING YOUR OWN GLOVES
ACTIVITY TECHNIQUE (SIMPLIFIED) - ALLOW HEDGE TO GROW TO 2.5M / 5M TALL - MAIN UPRIGHT STEMS ‘PLEACHERS’ - ARE CUT NEARLY ALL THE WAY THROUGH & PUSHED OVER 35 DEGREES - STAKES OF HAZEL OR ASH ARE DRIVEN INTO THE HEDGE LINE EVERY 40CM AND THE ‘PLEACHERS ARE WOVEN THROUGH THEM - BINDERS OR ’HEATHERS’ OF COPPICED HAZEL, SWEET CHESTNUT OR WILLOW ARE THEN TWISTED AROUND THE TOP OF THE STAKES TO SECURE THE ‘PLEACHERS’
SKILL-SHARING EDUCATION
COLLABORATION - TEAM UP WITH THE SURREY HEDGELAYING GROUP FOR CONSULTANCY - TEAM UP WITH THE RICHMOND BTCV WHO CURRENTLY RUN ‘ONE DAY’ ACCREDITED COURSES IN HEDGE LAYING
LAID HEDGE LOCATIONS DEFRA - DEPARTMENT FOR ENVIRONMENT,
INITIAL LOCATIONS - TO BE CONFIRMED
QUOTE: “MAINTENANCE OF HEDGEROWS IS NOW PART OF GOOD FARMING PRACTICE AND THE SKILLS OF THE HEDGE LAYER ARE IN GREAT DEMAND”
STAGE
FOOD & RURAL AFFAIRS
FLANKING OUTDOOR WORKSHOP SPACE will sandy - landscape architecture - contact:
[email protected]
FLANKING EXISTING VEGETABLE GARDEN
RAVEN’S AIT HEDGE LAYING - WINTER 2011
(DATE TO BE CONFIRMED)
HEDGE LAYING ACTIVITY DAY
TOOLS PROVIDED - LOOPERS (ESP. SUITABLE FOR NOVICE USE) - BILLHOOKS - AXES - SLASHERS - PRUNING SHEERS
ALL ARE WELCOME CREATIVITY
PLEASE BRING YOUR OWN GLOVES
ACTIVITY
TECHNIQUE (SIMPLIFIED) - WHERE NECESARY: - ‘PLEACHERS’ TO BE CUT BACK - ‘PLEACHERS’ TO BE WOVEN - ‘PLEACHERS’ TO BE LAID - HEDGE TRIMMED IN WIDTH - EXCESS MATERIAL TO BE CHIPPED AND USED TO MULCH THE BASE OF THE HEDGE
SKILL-SHARING EDUCATION
COLLABORATION - TEAM UP WITH THE SURREY HEDGELAYING GROUP FOR CONSULTANCY - TEAM UP WITH THE RICHMOND BTCV WHO CURRENTLY RUN ‘ONE DAY’ ACCREDITED COURSES IN HEDGE LAYING
DEFRA - DEPARTMENT FOR ENVIRONMENT, FOOD & RURAL AFFAIRS
LAID HEDGE LOCATIONS
INITIAL LOCATIONS - TO BE CONFIRMED
STAGE
QUOTE: “MAINTENANCE OF HEDGEROWS IS NOW PART OF GOOD FARMING PRACTICE AND THE SKILLS OF THE HEDGE LAYER ARE IN GREAT DEMAND”
FLANKING OUTDOOR WORKSHOP SPACE will sandy - landscape architecture - contact:
[email protected]
FLANKING EXISTING VEGETABLE GARDEN
RAVEN’S AIT PLANT ROOM DECONSTRUCTION - AUTUMN 2009
(DATE TO BE CONFIRMED)
BRICK RECLAMATION ACTIVITY DAY
ALL ARE WELCOME
TOOLS PROVIDED - HAMMER / CHISEL - POWER TOOLS - CROW BAR - LADDERS - SCAFFOLDING PLEASE BRING YOUR OWN PERSONAL PROTECTIVE EQUIPMENT
TECHNIQUE (SIMPLIFIED) - LAST ON / FIRST OFF I.E REMOVE THE LAST PIECE THAT WAS BUILT OFF FIRST - EXAMPLE THE TIMBER DOOR - ERECT SCAFFOLDING - DECONSTRUCT TOP DOWNWARDS - CLEAN BRICKS - EXCESS MORTAR ETC. - STACK BRICKS FOR RE-USE EXISTING PLANTROOM
DECONSTRUCTION
DECONSTRUCTION
RECLAIMED BRICKS
MATERIALS SHOULD NOT BE MOVED MORE THAN 3 TIMES.
NEW BRICK PAVED AREA
DISASSEMBLY/ DECONSTRUCTION
2
CLEANING & TRIMMING OF MATERIALS
3
STACKING - READY FOR RE-USE
9m
BENEFITS - REDUCES THE OVERALL COSTS OF BUILDING MATERIALS - PROVIDES LOWER COST BUILDING MATERIALS TO THE COMMUNITY - EXTENDS THE LIFE OF LANDFILLS - PROTECT THE NATURAL ENVIONMENT BY REDUCING THE NEED FOR THE EXTRACTION OF NEW RESOURCES
STAGE
1
LOCATION OF EXISTING PLANT ROOM NOTE: ADDITIONAL BRICKS TO BE RECLAIMED FROM RETAINING WALLS
will sandy - landscape architecture - contact:
[email protected]
RAVEN’S AIT PATHWAY BRICK LAYING - SPRING 2010
(DATE TO BE CONFIRMED)
BRICK RECLAMATION ACTIVITY DAY
TOOLS PROVIDED - MALLET - STIFF BRUSH - WHEELBARROW - SAW - HAMMER
ALL ARE WELCOME
PLEASE BRING YOUR OWN PERSONAL PROTECTIVE EQUIPMENT
RE-USE
TECHNIQUE (SIMPLIFIED) - REMOVE TOP LAYER OF SOIL FOR REQUIRED AREA - FILL WITH 2 INCHES OF HARDCORE FROM PLANTROOM DECONSTRUCTION - COMPACT, ADD MORE HARDCORE TO 3.5 INCHES BELOW SURFACE - ADD TIMBER GUARD RAILS ALONG EDGE OF PAVING AREA - SCREED OVER HARDCORE WITH SAND - REMOVE SCREED ALONG EDGE OF PATH & PLACE BRICKS ON EDGE - POUND FLUSH WITH MALLET - THEN PLACE BRICKS FLAT BETWEEN EDGING IN DESIRED PATTERN - SHOVEL A THIN LAYER OF STONE DUST - WORK INTO JOINTS WITH STIFF BRUSH - WET PAVED AREA AND REPEAT WITH STONE DUST - REPEAT STONE DUST AFTER ONE WEEK
RECLAIMED
BENEFITS
STAGE
NEW BRICK PAVED AREA
9m - REDUCES THE OVERALL COSTS OF BUILDING MATERIALS - PROVIDES LOWER COST BUILDING MATERIALS TO THE COMMUNITY - EXTENDS THE LIFE OF LANDFILLS - PROTECT THE NATURAL ENVIONMENT BY REDUCING THE NEED FOR THE EXTRACTION OF NEW RESOURCES
RE-USED
LOCATION OF EXISTING PLANT ROOM NOTE: ADDITIONAL BRICKS TO BE RECLAIMED FROM RETAINING WALLS
will sandy - landscape architecture - contact:
[email protected]
RAVEN’S AIT RENEWABLE ENERGY SYSTEMS - AUTUMN 2009
(DATE TO BE CONFIRMED)
RENEWABLE ENERGY SYSTEMS ACTIVITY WEEKEND
THE WEEKEND - RENEWABLE ENERGY WORKSHOPS - BICYCLE POWERED MUSIC - ADVICE - Q & A WORKSHOP - ENERGY COMPETITION - TEA & CAKE
ALL ARE WELCOME
RENEWABLE ENERGY - SOLAR POWER - WIND POWER - WATER POWER - BICYCLE POWER
COLLABORATION - TEAM UP WITH THAMES RENEWABLES FOR CONSULTANCY - TEAM UP WITH THE ‘MAGNIFICENT REVOLUTION’ - BICYCLE POWERED MUSIC TEAM - KINGSTON UNIVERSITY - FACULTY OF ART & DESIGN / ENVIRONMENT DEPT.
OBJECTIVE THE AIM IS TO DEVELOP INTUITIVE AND ACCESSIBLE WAYS OF ENGAGING AUDIENCES AND CREATE AN EDUCATION SPACE WHERE THE PUBLIC CAN LEARN ABOUT ENERGY CONSUMPTION AND ALTERNATIVE WAYS OF GENERATING POWER - ILLUSTRATING SIMPLE SOLUTIONS THAT PEOPLE CAN INTRODUCE INTO THEIR HOME
CONSTRUCTING A WIND TURBINE USING FOUND & RE-USED OBJECTS, EXAMPLES: - PVC PIPE CUT FOR THE BLADES - A 260 VDC 5 MOTOR FROM A TREAD MILL OUR SIMILAR - TAIL A USED PAINT ROLLER TRAY OR SIMILAR LIGHTWEIGHT MATERIAL
SHOWCASING SMALL SOLAR PANEL SYSTEMS AND THE POSSIBLE ENERGY THEY PRODUCE. BEST LOCATIONS FOR THEM TO BE PLACED
CONTINUING THE SUCCESS OF THE PREVIOUS ‘MAGNIFICENT REVOLUTION’ WEEKEND - THEY RETURN TO PROVIDE THE MUSIC FOR ANOTHER FUN PACKED WEEKEND INCLUDING LIVE MUSIC AND THE OPPORTUNITY TO POWER THE MUSIC YOURSELF
HOW TO BUILD YOUR OWN SOLAR POWERED SYSTEMS
THIS SHOULD GENERATE 7 AMPS FROM A 30MPH WIND - ENOUGH TO GET YOU STARTED
QUOTE “IT TAKES 50 BICYCLES TO CREATE ENOUGH ENERGY TO POWER A STANDARD KETTLE” ADAM - MAGNIFCENT REVOLUTION
THE WEEKEND WILL ALSO SHOWCASE OTHER RENEWABLE ENERGYS SYSTEMS THERE WILL ALSO BE EVENTS FOR THE CHILDREN INCLUDING BOAT MAKING - THEN BOAT RACES DOWN THE THAMES will sandy - landscape architecture - contact:
[email protected]
T I M E / G R E E N S T A T U S
2029
20 YEARS SINCE THE BEGINNING OF RAVEN’S AIT COMMUNITY CENTRE - CELEBRATIONS THROUGHOUT THE YEAR INCLUDING A RIVER FESTIVAL
2027 2025 2022 2020
CELEBRATION OF THE K+20 AREA ACTION PLAN HELD AT RAVEN’S AIT COMMUNITY CENTRE
2018
CONFERENCE REGARDING THE PEAK OF GLOBAL OIL PRODUCTION TO BE HELD IN THE LIGHT OF THE PREDICTIONS MADE FOR 2020
2016 2014 2013
2012
SOLAR POWER BECOMES COST COMPETETIVE WITH FOSSIL FUELS - EXHIBITION AT RAVEN’S AIT ENVIRONMENTAL CONFERENCE HELD OVER THE OLYMIPC WEEK - REGARDING THE LEGACY OF THE GAMES AT RAVEN’S AIT
2011 2010
RAVEN’S AIT ISLAND IS INTEGRATED INTO THE THAMES LANDSCAPE STRATEGY
2009
THE ISLAND BECOMES OCCUPIED BY ENVIRONMENTAL ‘SQUATTERS’ GENERATING THE DEBATE ABOUT THE FUTURE OF RAVEN’S AIT
1968
THE COUNCIL FAILED TO DECLARE RAVEN’S AIT ISLAND UNDER THE COMMONS REGISTRATION ACT OF 1968 AS ‘COMMON LAND’
1858
RAVEN’S AIT BECAME THE HEADQUARTERS OF KINGSTON ROWING CLUB (PRESUMABLY NOT EXCLUSIVE USE)
1217
‘TREATY OF LAMBETH’ (TREATY OF KINGSTON) DOCUMENTS THAT LED TO THE RATIFICATION OF THE MAGNA CARTA WERE SIGNED AT RAVEN’S AIT
RAVEN’S AIT IS GIVEN OFFICIAL STATUS AS A ENVIRONMENTAL COMMUNITY CENTRE BY KINGSTON COUNCIL
ISLAND ACTIVITY A FUTURE FORECAST AN ISLAND WITH A FANTASTIC HISTORY, WITH THE OPPORTUNITY FOR AN EVEN GREATER FUTURE will sandy - landscape architecture - contact:
[email protected]