12. Sectorwise Report On 30-06-2018 F

  • Uploaded by: Ammad Khan
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 12. Sectorwise Report On 30-06-2018 F as PDF for free.

More details

  • Words: 10,490
  • Pages: 93
Independent Quality Assurance for USAID’s Stabilization Activities in KP & FATA Summary of KP Reconstruction Program as of June 30, 2018 S.No

Description

Total No of Sub Projects

Ongoing

Substantially Completed

Completed

Not yet started

Dropped

122

6

0

113

3

0

SCHOOLS 1

Militancy Damaged Schools

a

FARA-I

5

1

-

4

-

-

b

FARA-II

75

2

-

72

1

-

c

PIL-09

35

3

-

30

2

-

d

PIL-17

7

-

-

7

-

-

2

Flood Damaged Schools

107

56

5

3

43

0

a

PIL-28

22

17

4

-

1

-

b

PIL-30

33

28

1

3

1

-

c

PIL-32

24

10

-

-

14

-

d

New PIL

28

1

-

-

27

-

229

62

5

116

46

0

Total Schools : BHUS 1

Fully Damaged BHUs

5

-

1

4

-

-

2

Partially Damaged BHUs

8

1

-

7

-

-

7

-

-

WATSAN 1

DWSS Buner

13

6

2

DWSS Swat

10

8

-

2

-

-

BRIDGES 1

Khwaza Khela Bridge, Swat

1

-

-

1

-

-

2

Mingora Bridge, Swat

1

-

-

1

-

-

1

-

-

1

-

-

HEAD WORKS 1

Amandara Head Works

2

Munda Head Works

1

-

-

1

-

-

1

1

-

-

-

-

GOVERNMENT COMPLEX 1

Teshil Level Government Complex Kabal Swat

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FATA Summary of KP Reconstruction Program as of February 28, 2017 S.No

Name of School

27 - 28 GPS-GMS Kuz Shawar 51

GGMS Manyar

84 - 85 GPS - GMS Peochar

District

PIL/FARA

Current Status

Progress (%age)

Swat

PIL-17

Completed (in AGES Tenure)

100%

Swat

PIL-17

Completed (in AGES Tenure)

100%

Swat

PIL-17

Completed (in HPK Tenure)

100%

94

GHS Bar Shawar

Swat

PIL-17

Completed (in HPK Tenure)

100%

98

GGPS Mangra Sakhra

Swat

PIL-17

Completed (in HPK Tenure)

100%

Assurance for USAID’s Stabilization Activities in KP & FATA KP Reconstruction Program as of February 28, 2017 Remarks

Independent Quality Assurance for USAID’s Stabilization Activities in KP & F Sector wise updates on KP Reconstruction Program as of February 28, 2017 S.No

Name of Facility

PIL/FARA

Status as of February 28, 2017

Progress (%age)

Completed Facilities 1

GGPS Barkaley Bishbanr(Swat)

GGPS Barkaley Bishbanr(Swat)

Already completed.

-

2

GGPS Seer Telegram (Swat)

GGPS Seer Telegram (Swat)

Already completed.

-

3

GHS Sangolai (Dir Lower)

GHS Sangolai (Dir Lower)

Already completed.

-

4

GGMS Shakardara (Swat)

GGMS Shakardara (Swat)

Already completed.

-

5

GGPS Toor Tooth (Swat)

GGPS Toor Tooth (Swat)

Already completed.

-

6

GGHS Ganori (Dir Upper)

GGHS Ganori (Dir Upper)

Already completed.

-

7

GGPS Ashray Malam Jaba (Swat)

GGPS Ashray Malam Jaba (Swat)

Already completed.

-

8

GGHS Tirath Qandil (Swat)

GGHS Tirath Qandil (Swat)

Already completed.

-

9

GGPS Qayum Abad Lalkoo (Swat)

GGPS Qayum Abad Lalkoo (Swat)

Already completed.

-

10 GHS Bar Shawar (Swat)

GHS Bar Shawar (Swat)

Already completed.

-

11 GGPS Ditpanai (Swat)

GGPS Ditpanai (Swat)

Already completed.

-

12 GHSS Zimdara (Dir Lower)

GHSS Zimdara (Dir Lower)

Already completed.

-

13 GHS Shekawlai Toormang (Dir Lower)

GHS Shekawlai Toormang (Dir Lower)

Already completed.

-

14 GPS Chiragali (Dir Upper)

GPS Chiragali (Dir Upper)

Already completed.

-

15 GGPS Bishbanr (Swat)

GGPS Bishbanr (Swat)

Already completed.

-

16 GGPS Ghari Chuprial (Swat)

GGPS Ghari Chuprial (Swat)

Already completed.

-

17 GGPS Spina Khpa (Swat)

GGPS Spina Khpa (Swat)

Already completed.

-

18 GPS Mirgam Bala (Dir Lower)

GPS Mirgam Bala (Dir Lower)

Already completed.

-

19 GGPS Balasur Chuprail (Swat)

GGPS Balasur Chuprail (Swat)

Already completed.

-

20 GGPS Painda Sakhra (Swat)

GGPS Painda Sakhra (Swat)

Already completed.

-

21 GPS Dapoor (Dir Lower)

GPS Dapoor (Dir Lower)

Already completed.

-

22 GGPS Saeed Abad (Swat) 23 GGPS Mangra Sakhra (Swat) 24 GGPS Manglawar (Swat)

GGPS Saeed Abad (Swat) GGPS Mangra Sakhra (Swat) GGPS Manglawar (Swat)

Already completed. Already completed. Already completed.

-

25 GGMS Bar Shawar (Swat) 26 GGPS Lalkoo Sakhra (Swat)

GGMS Bar Shawar (Swat) GGPS Lalkoo Sakhra (Swat)

Already completed. Already completed.

-

Substantially Completed Facilities 1

GGPS Kass Khass (Swat)

GGPS Kass Khass (Swat)

In progress

99.50%

2

GHS Gul Bandai (Buner)

GHS Gul Bandai (Buner)

In progress

99.00%

Under Construction Facilities

1

GGPS Chuprial (Swat)

GGPS Chuprial (Swat)

In progress

65.00%

2

GPS Maidan Bandai (Dir Lower)

GPS Maidan Bandai (Dir Lower)

In progress

21.83%

3

GHS Maidan Bandai (Dir Lower)

GHS Maidan Bandai (Dir Lower)

In progress

11.50%

4

GPS Inzar Maira (Buner)

GPS Inzar Maira (Buner)

In progress

0.15%

5

GMS Gul Bandai (Buner)

GMS Gul Bandai (Buner)

In progress

32.00%

6

GHSS Charbagh (Swat)

GHSS Charbagh (Swat)

Summary Nos. of fully completed facilities

Nos. of fully completed facilities

Nos. of substantially completed facilities

Nos. of substantially completed facilities

Nos. of under construction facilities

Nos. of under construction facilities

In progress

0.00%

ce for USAID’s Stabilization Activities in KP & FATA

P Reconstruction Program as of February 28, 2017 Remarks

Rectification work of sang list is in progress. work on site almost completed. Minor rectification in module T6, T-4, LB and developmental work is in progress.

Concreting in first floor columns completed. Steel fixing for truss beam of module T-5 completed and concrete pouring is awaited. Brick masonry in ground floor of module T-5 is in progress.Steel doors/ windows frame at ground floor of module T-5 has been fixed and rectification in the same is awaited. The contractor should be advised to enhance the manpower to accelerate the pace of work. Fixing of steel in ground floor roof beams/slab is in progress and at module M-4, neck columns concrete and brick masonry in foundation has been completed. Brick masonry in foundation has been completed and back filling is in progress. Excavation for retaining wall is also in progress. Layout for module T-8 has been carried out on 31st August, 2016. Excavation, levelling /dressing in foundation is completed and lean concrete in foundation is awaited. Removing of sliding materials from foundation of module T-8 is in progress. Provision of construction drawings for module T-8 still awaited. Work on site was commenced on January 02, 2017. RCC in GF columns & stair case upto first landing of module T-4 has been completed. Bfrick msonry in GF of module T-4 has been completed.The susper structure brick walls of module T-2 was dismantled as per instruction of supervisory consultants. Brick masonry in super structure of module T-2 also completed.

Dismantling of the existing damaged buildings completed. Layout for the new construction is awaited.

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FATA Sector wise Updates on KP Reconstruction Program as of October 14, 2016

S.No

Name of Facility

Status as of September 30, 2016

Progress (%age)

Status as of October 14, 2016

Progress (%age)

Flood Damaged Faciities 1

GPS No. 2 Maloch (Swat)

In progress

-

In progress

-

2

GPS Chinda Khora (Swat)

In progress

-

In progress

-

3

GGPS Kas (Swat)

4

GPS Pacha Kalay (Swat)

5

GPS Godha (Swat)

-

-

6

GGPS Godha(Swat)

-

-

7

GPS Biha(Swat)

In progress

-

In progress

-

8

GGMS Qayum Abad (Swat)

In progress

-

In progress

-

9

GGPS Serai Gut(Swat)

-

-

10 GPS Muraday (Swat)

-

-

11 GGPS Bara Bandai (Swat)

-

-

12 GPS Hisar Baba (Malakand)

In progress

In progress

13 GHS Inzargai (Malakand) 14 GPS Jalal Kot (Malakand)

-

-

In progress

In progress

In progress

-

-

-

In progress

-

15 GGPS Qambari (Shangla)

-

Stopped

-

16 GGPS Shalmano Kotkai (Shangla)

-

In progress

-

17 GHS Shang (Shangla)

-

-

18 GGPS Shalmano Chakesar (Shangla)

In progress

-

In progress

-

19 GMS Bilkanai (Shangla)

In progress

-

In progress

-

20 GGPS Begumar Lahore (Shangla)

In progress

-

In progress

-

21 GHS Amnavi (Shangla)

-

-

22 GMS Asigi Kalay (Dir Lower)

-

-

23 GHS Mian Brangola (Dir Lower)

-

-

24 GPS Zimdara(Dir Lower)

-

-

25 GHS Mirgam Bala (Dir Lower)

-

-

26 GGMS Kotkay (Dir Lower)

-

-

27 GGHSS Kumbar (Dir Lower)

-

-

28 GHS Sadbar Kalay (Dir Lower)

In progress

-

In progress

29 GPS Chinar Kot (Dir Lower)

-

-

30 GPS Raidgai (Dir Lower)

-

-

31 GPS No.1 Sherkhanai (Dir Lower)

-

-

32 GPS Sra Dherai (Dir Lower)

-

-

33 GPS Kass Barikot (Dir Upper)

-

-

34 GPS Tangi Sar (Dir Upper)

-

-

35 GPS Remin Kass (Dir Upper)

-

-

36 GPS Shomai (Dir Upper)

-

-

37 GPS Nihag (Dir Upper)

-

-

38 GPS Zakria (Dir Upper)

-

-

39 GPS Sundrai (Dir Upper)

-

-

40 GPS Sundal (Dir Upper)

-

-

41 GHS Jan Batti (Dir Upper)

-

-

Summary Total Nos. facilities

41

ssurance for USAID’s Stabilization Activities in KP & FATA

es on KP Reconstruction Program as of October 14, 2016

Remarks

Steel fixing and shuttering for plinth beam of M-3 module is in progress. Steel fixing for footings of M-3 & M-7 modules is in progress.

Concreting in neck columns, brick masonry in confinement walls has been completed and structure back filling is in progress.

Concreting in raft foundation of T-4 has been completed without any prior information on gazetted holidays. Steel cutting, bending & binding for T-7 module plinth beam is in progress. Lean concrete for T-3 module footings has been carriedout. Excavation for footings is in progress. Lean concrete for retaining structure has been carriedout and further work stopped due to unknown reasons. Lean concrete for M1 Module carried out. Steel fixing for plinth beam and back filling at M7 Module are in progress

Excavation for T-3 Module is in progress.

RRM for retaining walls are in progress. Lean concrete for T7 Module has been carried out. Steel cutting for T7 Module footing and excavation for T4 Module is in progress. Excavation for T-4 Module is in progress.

Work order has been issued and bearing capacity test is in progress.

Work order has been issued and bearing capacity test is in progress. Work order has been issued and bearing capacity test is in progress.

Pouring of plinth beams at both academic blocks i.e. M-4 & M-6 has been completed. Pouring of concrete in 08 out of 18 nos. super structure columns at module M-4 and 06 out 0f 24 nos. at module M-6 has been completed where as steel fixing for remaining columns at same modules was in progress. Deficient visits of senior field staff accept site inspector of supervisory consultant (M/S SHAZ) was observed which needs to be enhanced to ensure the execution of work as per construction drawings and specification.

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FAT Militancy Damaged Schools As of June 30,2018 Sub S.No FARA-I Schools 1 1 2 2 3 3 4 4 S.No

District

PIL/FARA

Current Status

Progress (%age)

GGMS Baboo GGMS Telegram GCMS Moranai GGMS Shakkar Dara

Swat Swat Dir Lower Swat

FARA-I FARA-I FARA-I FARA-I

Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in HPK Tenure)

100% 100% 100% 100%

Name of School

5

5

GPS Inzer Maira No.1

Buner

FARA-I

In Progress

32.00%

6 7 8 9 10 11 12 13 14 15 16 17

1 2 3 4 5 6 7 8 9 10 11 12

GPS Charbagh GMS Nawagai GPS Kota GGPS Araq GGPS Bar Qala Bishbanr GGCMS Kharrarrai Chum Matta GGPS Mian Mira Arkot GGPS Ningolai GGMS Ningolai GPS Ahingaro Dherai GGPS Kharrirai GGPS Shingrai

Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat

FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II

Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure)

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FAT Militancy Damaged Schools As of June 30,2018 S.No 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Sub S.No 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

Name of School

District

GPS Sher Palam GPS Koza Bandai No 2 GGPS-1 Charbagh GPS Gut GGPS Jehan Abad GPS Bara Bandai No 2 GGPS Mangar Kot GGPS Yakhtangai Aka Maroof Bam GGPS Zangay Charbagh GPS Hazara GGPS Sumbat Mandoor GGPS Telegram GGPS Khwar Oba Bar Thana GPS Shakaradara Pir Kalay GGPS Qala GGPS Qasim Nasapa Darmai GPS Bar Shawar GGPS Kishawra GGPS Shinkad GGPS Speny Oba Kishawara GMS Barkalay Saidu Sharif GPS Chum Bara Durashkhela GGPS Danai Shalpin GPS Tor Warsak No.1 GPS Jowar No.1 Daggar GPS. Gul Bandai GPS. Baikhanai GGPS Baikhanai GPS.Mairagai GGPS Awanai Chagurzai GPS. Kot Soray

Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Buner Buner Buner Buner Buner Buner Buner Buner

PIL/FARA

Current Status

FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II

Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure)

Progress (%age) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FAT Militancy Damaged Schools As of June 30,2018

49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75

Sub S.No 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

76

71

GGPS Chuprial

77

72

GPS Maidan Bandai

S.No

Name of School GGMS Topai GPS Maradu GPS Topai GPS Dara Sher Khanai GPS Atoo GPS Gumbatai Lal Qilla GPS Mulayano Banda GPS Takatak GGPS Kotkay Lal Qilla GPS Kotkay Lal Qilla GPS Machine Koorona GGPS Takatak GPS Ashrogai GGPS Barkalay Bishbanr GGPS Toor Toot Kishawara GGPS Asharay Malam Jaba GGPS Ditpanai GGPS Garhi Chuprial GGPS Qayumabad lalkoo GGPS Bishbanr GGPS Spina Khpa GGPS Paindai Sakhra GPS Mirgam Bala GPS Dapoor GGPS Lalkoo Sakhra GGPS Manglawar GGPS Kass Khass

District

PIL/FARA

Current Status

Buner Buner Buner Dir Lower Dir Lower Dir Lower Dir Lower Dir Lower Dir Lower Dir Lower Dir Lower Dir Lower Dir Lower Swat Swat Swat Swat Swat Swat Swat Swat Swat Dir Lower Dir Lower Swat Swat Swat

FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II FARA-II

Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure)

Progress (%age) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Swat

FARA-II

Completed

100.00%

Dir Lower

FARA-II

Completed

100.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FAT Militancy Damaged Schools As of June 30,2018 S.No

Sub S.No

78

73

79

74

District

PIL/FARA

Current Status

Progress (%age)

GPS Meramai

Dir Lower

FARA-II

In Progress

29.32%

GGPS Raidgai

Dir Lower

FARA-II

Work Stopped

56.90%

Name of School

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FAT Militancy Damaged Schools As of June 30,2018 Sub S.No 80 75 PIL-09 Schools 81 1 82 2 83 3 84 4 85 5 86 6 87 7 88 8 89 9 90 10 91 11 92 12 93 13 94 14 95 15 96 16 97 17 98 18 99 19 100 20 101 21 102 22 103 23 104 24 105 25 106 26 107 27 108 28 109 29 S.No

District

PIL/FARA

Current Status

GGPS Gumbatai

Dir Lower

FARA-II

Dropped

Progress (%age) 0.00%

GMS Charbagh GMS Alamganj GPS Shin GMS Aligrama GGPS Niligram Ronyal GGMS Sersenai GGMS Gulibagh GMS Shakardara GGPS Ghuzpatay Biha GGMS Bara Bandai No.2 GGCMS Qala GGPS Awesha Chuprail GGPS Malam, Kishawara GGMS Shinkad GGMS Kishawara GMS Kumbar Lal Qilla GGMS Khal Colony Khal GGHS Haya Serai Balambat GGPS Seer Telegram GGMS Araq GGHS Tirat Qandil GGPS Balasur Chuprail GGPS Saeedabad GHS Sangolai GHSS Zaimdara GHS Shekolai Tormang GPS Chiragali GGHS Ganori GGMS Bar Shawar

Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Swat Dir Lower Dir Lower Dir Lower Swat Swat Swat Swat Swat Dir Lower Dir Lower Dir Lower Dir Upper Dir Upper Swat

PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09 PIL-09

Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure)

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Name of School

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FAT Militancy Damaged Schools As of June 30,2018 S.No 110

Sub Name of School S.No 30 GHS Gul Bandai

District

PIL/FARA

Current Status

Buner

PIL-09

Completed (in HPK Tenure)

Progress (%age) 100%

111

31

GMS Gul Bandai

Buner

PIL-09

In Progress

70.00%

112

32

GGPS Tarokay

Swat

PIL-09

Not yet started

0.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FAT Militancy Damaged Schools As of June 30,2018 S.No

Sub S.No

113

33

GHSS Charbagh

114

34

GHS Maidan Bandai

115 35 PIL-17 Schools 116-117 1 - 2 118 3 119-120 4 - 5 121 6 122 7

District

PIL/FARA

Current Status

Progress (%age)

Swat

PIL-09

In Progress

38.74%

Dir Lower

PIL-09

In Progress

68.32%

GGPS Maloach

Swat

PIL-09

Dropped

0.00%

GPS-GMS Kuz Shawar GGMS Manyar GPS - GMS Peochar GHS Bar Shawar GGPS Mangra Sakhra

Swat Swat Swat Swat Swat

PIL-17 PIL-17 PIL-17 PIL-17 PIL-17

Completed (in AGES Tenure) Completed (in AGES Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure) Completed (in HPK Tenure)

100% 100% 100% 100% 100%

Name of School

rance for USAID’s Stabilization Activities in KP & FATA Militancy Damaged Schools Remarks

Module T-8: Concreting (RCC 1:2:4) in plinth beam, GF columns, GF beams & roof slab, staircase and FF columns has been completed. Brick masonry in ground floor completed. Module T-2: Not started yet. Module LB: Concreting (RCC 1:2:4) in footings, neck columns, plinth beam and GF columns has been completed. BB work in foundation completed. Formwork for GF slab is in progress. Dev. Works: RRM of back and leftt side retaining walls completed.

rance for USAID’s Stabilization Activities in KP & FATA Militancy Damaged Schools Remarks

rance for USAID’s Stabilization Activities in KP & FATA Militancy Damaged Schools Remarks

Snag list rectification completed and school declared as complete on May 15,2018 .FIR signed. Completed and handed over to Education Department on April 23, 2018.

rance for USAID’s Stabilization Activities in KP & FATA Militancy Damaged Schools Remarks Module M-3: Pouring of concrete in first floor columns has been completed. LB & Dev; works: Work not yet commenced. Module M-3: Pouring of concrete in mumty slab has been completed. Further work stopped since 23-05-2018. LB & Dev. Works: Pouring of concrete in slab of module LB has been completed. Further work stopped since 23-05-2018.

rance for USAID’s Stabilization Activities in KP & FATA Militancy Damaged Schools Remarks Dropped.

rance for USAID’s Stabilization Activities in KP & FATA Militancy Damaged Schools Remarks Module T-4: Concreting (RCC 1:2:4) work in module has been completed. Plastering and pointing work at GF & FF completed. Brick masonry and fixing of doors/ windows steel frames at GF & FF has been completed. Fixing of marbles tiles in GF and FF has been completed chemical polishing of the floor and skirting marble remaining. Fabrication and erection of steel truss, CGI & PGI sheets and doors/ windows/ grill 90% completed. Module T-2: Brick masonry and fixing of doors/ windows steel frames, concreting (RCC 1:2:4) in module has been completed. Fixing of marble tiles completed and grinding/ polishing of the same remaining. Pointing and plastering work completed and rectification of the same is awaited. Fabrication and erection of steel truss, CGI & PGI sheets and doors/ windows/ grill is 90% completed. Module LB: Concreting (RCC 1:2:4) in slab has been completed. GF brick work, Plastering/ pointing 70% completed. Fixing of marble tiles 80% completed. Fabrication of doors/ windows/ grill is 80% completed. Work on water tank remaining. Dev. Works: RCC work of septic tank and soakage pit has been completed.Further work remaining.

Not yet Tendered

rance for USAID’s Stabilization Activities in KP & FATA Militancy Damaged Schools Remarks Module M-3(H):Concrete pouring FF slab completed & brick masonry GF was in progress. Module M-6(H):Fixing of form work GF beams & slab was in progress. Module M-7: Brick masonry and fixing of door & window frames at GF & concrete pouring FF long columns are completed.No activity during the reporting period. Module LB(H): Steel fixing on base slab & wall of OHWT has been completed.No activity during the reporting period. Module U Shape: activity since 17-05-2018 due to unknown reason. Module M-3: floor slab concrete has been completed. Dev. Works: No activity observed since 21-04-2018. Dropped.

No First

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

1

GPS No. 2 Maloch

Swat

PIL-30

Work stopped

97.82%

2

GPS Chinda Khora

Swat

PIL-30

Work stopped

74.09%

3

GGPS Kass

Swat

PIL-30

In progress

51.66%

4

GPS Pacha Kalay

Swat

PIL-30

In progress

95.04%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

5

GPS Godha

Swat

PIL-30

Work stopped

94.04%

6

GGPS Godha

Swat

PIL-30

In progress

57.85%

7

GPS Biha

Swat

Revised PIL-28

Work stopped

54.57%

8

GGMS Qayum Abad

Swat

Revised PIL-28

In progress

98.10%

9

GGPS Serai Gut

Swat

Revised PIL-28

Work stopped

40.52%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

10

GPS Muraday

Swat

Revised PIL-28

Work stopped

32.30%

11

GGPS Bara Bandai

Swat

PIL-32

Work stopped

20.55%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

12

GPS Hisar Baba

Malakand

PIL-28

Work Stopped

63.92%

13

GHS Inzargai

Malakand

PIL-30

In progress

71.17%

14

GPS Jalal Kot

Malakand

PIL-30

Completed

100.00%

15

GGPS Qambari

Shangla

PIL-28

In progress

56.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

16

GGPS Shalmano Kotkai

Shangla

PIL-28

Work stopped

40.00%

17

GHS Shang

Shangla

PIL-30

In progress

30.97%

18

GGPS Shalmano Chakesar

Shangla

PIL-30

Work stopped

44.75%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

19

Name of School

GMS Bilkanai

District

PIL/FARA

Shangla

PIL-30

As of June 30, 2018 Progress Current Status (%age)

Work stopped

40.87%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

20

GGPS Begumar Lahore

Shangla

PIL-30

Work stopped

29.80%

21

GHS Amnavi

Shangla

PIL-30

Work stopped

17.65%

22

GHS Mian Brangola

Dir Lower

PIL-28

In progress

32.34%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

23

GPS Zimdara

Dir Lower

PIL-30

Work Stopped

35.91%

24

GHS Mirgam Bala

Dir Lower

PIL-30

Work Stopped

13.54%

25

GGMS Kotkay

Dir Lower

PIL-30

In progress

91.54%

26

GHS Sadbar Kalay

Dir Lower

PIL-30

Completed

100.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

27

GPS Raidgai

Dir Lower

PIL-30

Completed

100.00%

28

GPS No.1 Sherkhanai

Dir Lower

PIL-30

In progress

73.96%

29

GMS Asigi Kalay

Dir Lower

PIL-30

In progress

35.26%

30

GPS Kass Barikot

Dir Upper

PIL-30

Work stopped

51.22%

31

GPS Tangi Sar

Dir Upper

PIL-30

In progress

58.03%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

32

GPS Remin Kass

Dir Upper

PIL-30

Work stopped

52.81%

33

GHS Jan Batti

Dir Upper

Revised PIL-30

In progress

37.35%

34

GPS Shomai

Dir Upper

PIL-30

Not yet started

-

35

GPS Nihag

Dir Upper

PIL-30

In progress

85.62%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

36

GPS Zakria

Dir Upper

PIL-30

Work Stopped

56.14%

37

GPS Sundrai

Dir Upper

PIL-30

Work Stopped

29.05%

38

GPS Sundal

Dir Upper

PIL-30

In progress

63.62%

39

GPS Mansooka

Charsadda

PIL-30

In Progress

50.55%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

40

GGPS Samunat

Charsadda

PIL-28

In Progress

95.08%

41

GPS Shahidan

Charsadda

PIL-28

In progress

95.76%

42

GPS Shahab Khel Kaka Sahib

Nowshera

PIL-30

In Progress

95.49%

43

GPS Sherin Kotey

Nowshehra

PIL-28

In Progress

83.19%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

44

GPS Tor Dheri

Nowshehra

PIL-28

In progress

60.50%

45

GPS Kotar Pan No. 1

Nowshehra

PIL-30

In progress

79.07%

46

GGPS Pashtoon Ghari

Nowshehra

PIL-28

Work stopped

98.78%

47

GPS Bab e Jadeed

Nowshehra

PIL-28

Work stopped

86.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

48

GPS Kandi Taza Din

Nowshera

PIL-28

Work stopped

98.05%

49

GPS No. 1 Mishak

Nowshera

PIL-28

In Progress

54.30%

50

GGPS Marooba

Nowshehra

PIL-28

Work stopped

36.07%

51

GPS Zakhi Qabristan

Nowshehra

PIL-32

Work stopped

19.01%

52

GPS No 1 Jaroba

Nowshehra

PIL-32

In Progress

14.68%

53

GPS Khan Jan Kalay

Nowshehra

PIL-32

In Progress

38.40%

54

GPS No 1 Mohalla Mula Khan

Nowshehra

PIL-32

In Progress

21.24%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

55

GGPS Aman Kot

Nowshehra

PIL-32

In Progress

2.53%

56

GHS Pashtoon Ghari

Nowshehra

PIL-32

In Progress

2.19%

57

GPS Hawai

Nowshehra

PIL-32

In Progress

12.78%

58

GPS Toha

Nowshehra

PIL-32

In Progress

7.81%

59

GGPS Jhoke Gumla

DI Khan

PIL-28

Work stopped

54.46%

60

GPS Rora Nawa

DI Khan

PIL-28

Work stopped

82.89%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

Name of School

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

61

GPS Makkar

DI Khan

PIL-30

In Progress

88.85%

62

GPS No.1 Yarak

DI Khan

PIL-30

In Progress

58.45%

63

GPS Jhoke Umaray Wali

DI Khan

PIL-28

Work stopped

57.30%

64

GPS Bairoon Sharqi

DI Khan

PIL-28

Work stopped

48.59%

Independent Quality Assurance for USAID’s Stabilization Activities in KP & Flood Damaged Schools S.No

65

Name of School

GHSS Akbarpura

District

PIL/FARA

Nowshehra

PIL-32

As of June 30, 2018 Progress Current Status (%age)

In Progress

29.85%

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Contractor has stopped work at site since March 1,2018 Module M-3: Snag list rectification completed. Module LB & Dev; works: Snag list rectification completed. Water supply is remaining. Contractor has stopped work at site since Feb 24,2018 M-3 Module: Plaster and pointing of Mumty wall was in progress M-7 Module: Plaster and pointing of Mumty wall was in progress. LB & Dev; works: Steel fixing in beams & slab of LB was in progress.

T-7 Module : Steel joinery fixing was in progress. (No activity during the reporting period) LB & Dev; works: Excavation for septic tank and RRM in front side retaining wall was in progress. T-3 Module: Windows glazing, final coat of paint and electrical commissioning are remaining. LB & Dev; works: Water supply remaining.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Contractor has stopped work at site since May 16,2018 Module T-4: Snag list rectification was in progress. LB & Dev; works: Glazing,Vent pipes installations, External electrification and water supply are remaining. T-4 Module: Marble grinding in FF was in progress. No activity during the reporting period LB & Dev; works: Steel fixing in LB footings ,columns, RRM in back side retaining wall and Brick work in boundray wall was in progress Work has been stopped since 01 Feb 2018. T-4 Module: Plaster GF 60% completed & formwork has been removed from FF truss beam. T-7 Module: Concrete pouring FF truss beams completed & removal of formwork from FF truss beam has been completed. Dev: works: Work on LB not commenced yet. T-7 Module:Lawn pcc & final coat paint was in progress. Remaining Works: Final coat paint,Louvers, testing & commissioning. Site activities have been stopped since 20-01-2018 T-3 Module: Truss beam concrete carried out. LB & Dev; Works: LB work not yet started and work stopped on back side retaining wall.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Site activities have been stopped since 20-01-2018 Module T-3: Concreting of truss beams has been completed. LB & Dev; Works: L.B neck columns concrete, confinement wall BB work has been carried out.

Contractor has stopped work at site since January 18,2018 Module M-13(a): Concrete pouring in first floor beam & slab carried out unsupervised. Brick masonry at GF was in progress prior to stoppage of work. Dev; works: Retaining wall back side completed.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Module M-1: Internal plastering and fixning of marble in ground floor has been completed whereas external plastering is in progress. Module LB: Excavation for foundation of LB has been completed. Dev; Works: Plastering of boundary wall is in progress. Further work stopped since April 01, 2018. Module M-4: Grinding of marble is in progress. Module M-11: Fixing of marbles in stair is in progress. Module LB: Brick pointing is in progress. Dev; Works: Pouring of concrete in slab of septic tank and soakage pit has been completed. Completed. T-7 Module: Concreting (RCC 1:2:4), plastering work and pointing work has been completed. Fixing of doors/ windows steel frames and brick masonry at GF & FF completed. Erection and fabrication of steel truss completed. Fixing of CGI/ PGI sheet completed and rectification of the same is awaited. PCC under floor completed. Erection of steel doors/ windows/ grill is 80% completed. Fixing of marble tiles in floor / skirting at GF & FF has been completed and grinding/ polishing of the same remaining. Conduting for electrical wiring at FF is in progress. Module LB: Concreting (RCC 1:2:4) in plinth beam, GF columns, roof beams & slab, water tank bottom slab and walls has been completed and slab of water tank remaining. Brick masonry and fixing of steel doors/ ventilators frame completed. Fixing of marble tiles in floor / skirting at GF has been completed and grinding/ polishing of the same remaining. Plastering and pointing completed and rectifcation of the same needed. PCC under floor completed. Erection of steel doors/ windows/ grill 80% completed. Dev. works: Developmental work not commenced yet.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks T-3 Module: Foundation work, RCC (1:2:4) in GF columns, beams/ roof slab and FF columns has been completed. Brick masonry and fixing of doors/ windows steel frames at GF completed. Fixing of formwork for truss beam is temporarily stopped. Module LB: Work not commenced yet. Dev; works: Work on back side and right side retaining wall has been completed. Work on left side retaining wall 90% completed.

Site activities have been resumed on 26-06-2018 T-3 Module: PCC under floor carried out, formwork and steel fixing for truss beam is in progress. (Site activities not yet resumed) T-4 Module: PCC under floor carried out and GF BB work was in progress. T-6 Module: PCC under floor carried out. (Site activities not yet resumed) T-11 Module: Not yet started. LB: Not yet started. Dev; Works: RRM retaining wall is in progress. (Site activities not yet resumed) Site activities have been stopped since 01-03-2018 T-4 Module: Backfilling, compaction completed, FF plaster work and electric conduiting is in progress. LB: Formwork fixing for slab beam completed and steel not yet placed. Dev; Works: Boundary wall BB work was in progress.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Site activities have been stopped since 14-05-2018 T-7 Module: Plaster work is in progress. T-4 Module: GF preparation for plaster work is in progress. LB: Excavation for foundation is in progress. Dev; Works: RRM Retaining wall and BB work at various locations is in progress.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Site activities have been stopped since 17-05-2018 T-4 Module: PCC under floor carried out and BB work is in progress. LB: Excavation for foundation is in progress. Dev; Works: RRM Retaining wall and excavation at various locations is in progress.

Site activities have been stopped since 30-05-2018. Module T-3: FF columns steel fixing is in progress. T-6 Module: Concreting in plinth beam carried out. T-11 Module: Lay out carried out and excavation not yet started. LB & Dev; Works: Not yet started. Module M-4(a): Pouring of concrete in first floor columns and staircase up to first landing has been completed. Further work stopped since May 15, 2018. Module M-4(b): Pouring of concrete in ground floor columns has been completed. Further work stopped since May 15, 2018. Module M-6: Cutting of steel for plinth beam is in progress. Module M-11: Fixing of steel in mumty columns has been completed. Further work stopped since May 26, 2018. Module LB: Backfilling and PCC under plinth beam has been completed. Further work stopped since May 15, 2018. Dev; Works: Brick masonry in septic tank is in progress. Further work stopped since May 15, 2018.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Moudule T4: Fixing of doors/windows frames in ground floor is in progress. Module T7: Pouring of concrete in ground floor slab has been completed. LB & Dev; works: Pouring of concrete in neck columnshas been completed. Work stopped at site since June 02, 2018.

Module T4: Pouring of concrete in footing and neck columns has been been completed. Module T-6: Work not yet commenced. Module T11: Pouring of concrete in ground floor columns has been completed. Further work stopped Module LB: Work not yet commenced. Module LB & Dev; works: Work not yet commenced. Work at site stopped since March 30, 2018. Module M-3: Distempering of wall and ceiling in ground floor and first floor is 50% completed.Further work stopped since 16-05-2018 with commencement of Ramadan. Module LB: Marble grinding is in progress. Dev; Works: Side drain at left side of module LB has been completed, while leveling dressing of lawn is in progress.

Completed.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks

Completed.

Module M-4: PCC front steps have been poured. Further work stopped since May 08, 2018. LB & Dev; works: Fixing of marble in module LB is in progress. Fixing of steel in septic tank, soakage pit and OHWT top slab has been completed whereas plastering of boundary wall is in progress. Module M-3: Fixing of steel is in ground floor slab has been completed. Module M-7: Pouring of RCC beam for terrace railing has been completed. Further work stopped since June 01, 2018. LB & Dev; works: Work not yet commenced. Module T-3: Work has been stopped since 17-05-2018 with commencement of Ramadan and not yet resumed. LB & Dev; Works: Work has been stopped since 11-12-2017. Module T-3: Work has been stopped since 01-05-2018. LB & Dev; Works: Boundry wall brick masonry and coping is in progress.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Module T-3: Work has been stoped since 17-05-2018 with commencement of Ramadan and not yet resumed. LB & Dev; Works: Work has been stopped since 11-12-2017. Module T-7: First floor brick masonry 70% completed and steel cutting for truss beams is in progress. Module T-13: Steel work for 2nd floor columns is in progress. LB & Dev; works: No activity observed since 01-03-2018.

The work order has been issued but work not yet commenced. Module T-3: Marble grinding in ground floor is in progress. Module LB: Fixing of marble skirting and fixing of marble flooring has been completed.No further activity observed. Dev; Works: First coat of Weather shield on boundary wall is completed. Further work stopped since (13-06-2018).

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Module T-7: Erection of steel trusses has been completed. Further work stopped since 09-05-2018. Module LB: Excavation for footing is 85% completed. Further work stopped since last four months. Dev; Works: Construction of boundary wall at front of module T-7 is 30% completed. Further work stopped since 09-05-2018. Module T-4: Pouring of concrete in ground floor slab has been completed. Further work stopped since 11-05-2018. Module LB: Not yet commenced Dev; Works: Construction of retaining wall at left side of module T-4 is almost completed.No further activity observed. Module T-4: Plastering of columns at ground floor and first floor has been completed. Further work stopped since (13-06-2018). Module LB: Fixing of steel for bottom slab of water water tank is in progress. Dev; Works: Construction of retaining wall at rear side of module T-4 is already completed. No further activity observed. Module M-7: First floor slab completed, Mumty slab reinforcement completed.First floor parpaet wall reinforcment completed and formwork in progress. LB & Dev Works: Plaster work completed.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Module M-3: Completed LB & Dev Works: Completed

Module M-4: Completed LB & Dev Works: Completed

Module M-7: Rectification of punch list in progress (Sign Board, Plaque, Stabilizor etc remaining). LB & Dev Works: Rectification of punch list in progress

Module M-13: ,Door/windows panel glass beading fixing of main building completed. Sand filling and tuff tile fixing, in court yard completed. LB & Dev Works: LB overhead water tank top slab completed.Septic tank in progress

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Module M 7: Door/ window and window grill fixing completed.First floor parapet wall railling completed.Form work for mumty slab completed

Module M 13: Fixing of Doors/ Windows completed, Railling of parapet wall completed.Marble fixing of staircase in progress. LB & Dev Works: Plaster work completed. Marble fixing completed. OHWT manhole slab and bed chips completed. Boundary wall in progress.

Module M 13 : Deicision on the below items is yet to be decided whether these are to be executed at site or deleted from the scope of work. 1.Quantity of earthing pit is two while on site one is provided. 2. Electrical appliances.

Module M 7 : Distempering of main building and roof treatment remain to be done

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks

In order to declare the school as complete, decision on the below items is awaited from PMU (C&W):1. Quantity of earthing pit is 02, whereas at site 01 has been provided. 2. Electrical appliances. 3. Deletion of Soakage pit.

Module M 13: Second floor slab and parapet wall concrete completed.Second floor brick masonry in progress.

Module M 13: Fixing of formwork completed and steel fixing in progress for second floor slab. Module-7: Block A: Steel reinforcement for G/F columns completed Block B: G/F columns concrete completed Module-3 : Ground floor columns concrete completed

Module-7 : First floor slab formwork completed and steel reinfoecement for first floor slab/ beam in perogress Module-13 : Concrete of Ground floor columns completed. Ground floor brick masonry in progress.

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Module-3 : Lean concrete in foundation completed

Module-3 : Spreading of granular material in foundation bed in progress

Module-3 : Plinth beam concrete completed

Module-3 : Footing concrete completed. Neck columns reinforcement in progress.

Module M-7: First floor slab completed. LB & Dev Works: Brickwork of Boundary wall in progress

Module M-7: Grinding of marbles on GF and FF completed, Fixing of doors and windows completed on GF and FF LB & Dev Works: Plaster work of LB completed, Grinding Marble and sanitary works in progress, Septic tank, soakage pit and sewerage line in progress

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks

Module M-3: Electrification of first floor in progress.Marble grinding of first floor completed and ground floor in progress.Distempring of first floor and ground floor in progress LB & Dev Works: OHWTconstruction completed.Septic tank construction completed. Main gate installation completed

Module M-7(A & B): FF slab complated and columns for mumrty in progress. plastering in G/F and F/F in progress. LB & Dev Works: Work on LB not yet started.Brick work and plaster work of Boundary wall completed

Module M-7: First floor slab and mumty columns complated, brickwork of mumty in progress. LB & Dev Works: Brickwork and plaster work of Boundary wall completed, Fixing of formwork for roof slab in progress

Module M-7: First floor columns and Brickwork completed, Concrete of first floor done LB & Dev Works: Excavation for LB in progress, Brickwork on boundary wall completed, Coping of boundary wall completed

ty Assurance for USAID’s Stabilization Activities in KP & FATA Flood Damaged Schools Remarks Block A: Fixing of formwork for ground floor completed and steel reinforcement in progress Block B: Concrete for ground floor slab completed. Block C: Pouring of GFcolumns in progress. 68 No’s completed 12 No's remaining. Block D: Neck column completed. Retaining wall: concrete for plum concrete retaining in progress Waiting area: Neck columns concrete in progress OHWT: Footing completed columns in progress

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FATA Partially Damaged BHUs As of June 30,2018 S.No

Name of BHU

Completed Facilities 1 CD Parrai 2 CD Telegram 3 MCH Center Kithiari 4 BHU Bandai 5 BHU Shalpin 6 BHU Bishbanr 7 BHU Kotanai Ongoing Facilities

8

BHU Mashkomai

District

PIL/FARA

Current Status

Progress (%age)

Swat Swat Dir Lower Swat Swat Swat Swat

PIL-21 PIL-21 PIL-21 PIL-21 PIL-21 PIL-21 PIL-21

Completed Completed Completed Completed Completed Completed Completed

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Swat

PIL-21

Work stopped

84.15%

Remarks -

Site activities have been stopped since 22-02-2018. CAT V & VI Residence #1: Snag list rectification was in progress. CAT V & VI Residence #2: Snag list rectification was in progress. M.O Residence: Not yet started.

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FATA Fully Damaged BHUs S.No

Name of BHU

Completed Facilities 1 BHU Kishawra 2 BHU Chongai Shamozai 3 BHU Nazar Abad 4 BHU Mian Kalay Substantially Completed Facilities 5

BHU Topai

District

PIL/FARA

Swat Swat Swat Swat

PIL-26 PIL-26 PIL-26 PIL-26

Buner

PIL-26

As of June 30,2018 Progress Current Status (%age) Completed Completed Completed Completed

Work stopped

Remarks

100.00% 100.00% 100.00% 100.00%

-

96.00%

Boundry wall of Cat. V/VI, buildings remains to be constructed.Levelling and dressing of terraces still remaining.

Independent Quality Assurance for USAID’s Stabilization Activities i Drinking Water Supply Schemes (Swat) S.No

Name of Scheme

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

Completed Schemes 1

Installation of Transformers & Voltage Regulators

Swat

PIL-25

Completed

100.00%

2

DWSS Nawey Kaley

Swat

PIL-25

Completed

100.00%

Ongoing Schemes

3

DWSS Akram Muhallah

Swat

PIL-25

In progress

96.00%

4

DWSS Makan Bagh

Swat

PIL-25

Work stopped

93.00%

Independent Quality Assurance for USAID’s Stabilization Activities i Drinking Water Supply Schemes (Swat) S.No

Name of Scheme

District

PIL/FARA

Swat

PIL-19

As of June 30, 2018 Progress Current Status (%age)

DWSS Akhoon Baba a) -Akhoon Baba (Proper) b) -Shagai Zone-II

5 c) -Shaheen Abad

In progress

92.00%

Independent Quality Assurance for USAID’s Stabilization Activities i Drinking Water Supply Schemes (Swat) S.No

6

Name of Scheme

DWSS Gulkada Maira

District

PIL/FARA

Swat

PIL-25

As of June 30, 2018 Progress Current Status (%age)

Work stopped

90.00%

Independent Quality Assurance for USAID’s Stabilization Activities i Drinking Water Supply Schemes (Swat) S.No

7

Name of Scheme

DWSS Shagai Zone-1

District

PIL/FARA

Swat

PIL-25

As of June 30, 2018 Progress Current Status (%age)

In progress

86.00%

Independent Quality Assurance for USAID’s Stabilization Activities i Drinking Water Supply Schemes (Swat) S.No

8

Name of Scheme

DWSS Barama (Swat)

District

PIL/FARA

Buner

PIL-19

As of June 30, 2018 Progress Current Status (%age)

Work stopped

75.00%

Independent Quality Assurance for USAID’s Stabilization Activities i Drinking Water Supply Schemes (Swat) S.No

Name of Scheme

District

PIL/FARA

As of June 30, 2018 Progress Current Status (%age)

9

DWSS Shahidabad Fizagat

Swat

PIL-25

Work stopped

72.00%

10

Installation of 120 hand Pumps

Swat

PIL-25

Work stopped

63.00%

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Swat) Remarks

Completed Completed

Pump Houses: Work on pump houses completed. Surface tank: Construction of valve chambers remaining. Rising Main: Testing of rising main No.2 completed and rectification and testing of rising main No.1 is awaited. Distribution System: Work on the distribution system completed and rectification of the same is in progress. Electrification: Electrification has been completed. Rectification of service cable in tube well No. 1 and testing of (1 & 2) is awaited. Pumping Machinery: Installation of pumping machinery at tube well No. 1 & 2 has been completed and testing of the same is awaited.

Pump House: D &T of tube well, repair of pump and electrification has been completed. Distribution System: Rectification and testing of distribution system is awaited. Pumping Machinery: Installation and testing of pumping machinery has been completed.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Swat) Remarks Pump House: Work on pump house completed except fixing of glass in window and rectification of white washing Surface Tank: Completed. Rising Main: Laying and jointing of rising main of Akhoon Baba (proper) is 90% completed and further work has been stopped . Work on rising main of Shagai Zone-2 and Shaheen Abad is 95% completed and testing of the same remaining. Distribution System: Work on distribution system of Shagai Zone-2 is 90% completed and further work has been stopped since mid of January 2017. Work on distribution system of Akhoon Baba Proper has been 70% completed and further work stopped. Pumping machinery: Pumping machinery on new tube well of Shaheen Abad and existing tube well of Akhoon Baba proper have been installed and testing of the same is awaited. Electrification: External electrification of Shaheen Abad portion and Akhoon Baba proper has been completed. Internal electrification of Shaheen Abad portion is in progress.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Swat) Remarks Tube well: Completed. Pump House : Work on pump house completed, except fixing of glass in window and minor rectifications. Surface Tank: Completed. Distribution System: Distribution system completed and rectification & testing of the same is awaited. Rising Main: Work on fixing of 6" dia. GI pipe in rising main is completed. Rectification/Repair of defective weork and testing of the same is awaited. Pumping Machinery: Installation of pumping machinery completed and testing of the same not yet done. Electrification: External electrification completed. Internal electrification remains to be done.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Swat) Remarks Pump House: Completed. Rising Main: Fixing of 4" dia. GI pipe in rising main has been completed and testing is awaited. Distribution System: Work on distribution network is 85% completed and further work stopped. Pumping machinery: Installation of pumping machinery on new tube well of Shagai Zone-1 and existing tube well of Shagai has been completed. Electrification: External electrification completed. Internal electrification of new tube well and existing tube well of Shagai proper has been completed except rectification in manhole and connection of earting wires with main board.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Swat) Remarks Tube well: Completed. Pumping Machinery: Installation of pumping machinery completed and testing of the same remaining. Pump House: Completed Rising Main: Work on fixing of 6" dia. rising completed and testing of the same is awaited. Distribution System: Work on distribution system is 90% completed and further work has been stopped since mid of June 2017 and not yet resumed. Surface Tank: The executing agency (TMA Mingora) has proposed the utilization of existing surface tank instead of construction of a new one. Electrification: Internal electrification remaining. Work on external electrification not yet done as payment to PESCO is awaited.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Swat) Remarks Tube well: Tube well completed. Pump House: Plinth protection and white washing in pump house are remaining. surface tank: Surface tank completed except construction of valves chambers and fixing of sluice valves. Rising Main: Fixing of 6"dia. GI pipe in rising main is 90 % completed and further work stopped since March 2016 and not yet resumed. Distribution System: Work on fixing of GI pipes in distribution system is 80% completed. Pumping Machinery: Supply and installation of pumping machinery is awaited. Electrification work: Internal electrification is completed. External electrification not yet done as payment to PESCO is awaited.

Work on 79 Nos. Hand Pumps in Saidu Sharif and Mingora has been completed. Hand pump installed at Sethi Muhallah Amankot is non functional. One Hand pump at Akhoon Baba has been installed inside the boundary wall of the house and there is no other community access to utilize the hand pump.

Independent Quality Assurance for USAID’s Stabilization Activities in KP Drinking Water Supply Schemes (Buner) As of June 30 ,2018 S.No

Name of Scheme

Completed Schemes 1 DWSS Qibla Maira DWSS Chongay Kohy Dara (20 2 Nos. Hand Pumps) 3 DWSS Shalbandai 4 DWSS Bagra Maira 5 DWSS Aso Dara 6 DWSS Banda Karapa 7 DWSS Jang Dara Ongoing Schemes

8

DWSS Dewana Baba

District

PIL/FARA

Current Status

Progress (%age)

Buner

PIL-19

Completed

100.00%

Buner

PIL-19

Completed

100.00%

Buner Buner Buner Buner Buner

PIL-19 PIL-19 PIL-19 PIL-19 PIL-19

Completed Completed Completed Completed Completed

100.00% 100.00% 100.00% 100.00% 100.00%

Buner

PIL-19

Work stopped

98.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP Drinking Water Supply Schemes (Buner) As of June 30 ,2018 S.No

Name of Scheme

District

PIL/FARA

Current Status

Progress (%age)

9

DWSS Soor Kamar Maira

Buner

PIL-19

work stopped

90.00%

10

DWSS Sonigram

Buner

PIL-19

Work stopped

82.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP Drinking Water Supply Schemes (Buner) As of June 30 ,2018 S.No

11

Name of Scheme

DWSS Maskipur

District

PIL/FARA

Current Status

Progress (%age)

Buner

PIL-19

In progress

90.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP Drinking Water Supply Schemes (Buner) As of June 30 ,2018 S.No

12

Name of Scheme

DWSS Dagai

District

PIL/FARA

Current Status

Progress (%age)

Buner

PIL-19

work stopped

70.00%

Independent Quality Assurance for USAID’s Stabilization Activities in KP Drinking Water Supply Schemes (Buner) As of June 30 ,2018 S.No

13a

Name of Scheme

DWSS Jowar /Bazargay (A)-Jowar portion

Progress (%age)

District

PIL/FARA

Current Status

Buner

PIL-19

in progress

60.00%

Buner

PIL-19

Completed

100.00%

DWSS Jowar (Bazargay) (B)- Bazargay portion

13b

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Buner)

Remarks Completed Completed Completed Completed Completed Completed Completed Pump House: Completed. Surface Tank: Completed. Rising Main: Completed. Distribution System: Completed. Electrification: Installation of energy meter is remaining. Pumping machinery: Installation of pressure gauge remains to be done.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Buner)

Remarks Pump House: Construction of PCC pad and rectification of defects/repairs in pumphouse are not yet done. Pumping Machinery: Pumping machinery Installed and tested. Distribution System: Distribution system completed. Electrification: Internal electrification completed. External electrification completed except installation of energy meter. Surface Tank: Completed. Pump House: Completed. Rising Main: Work on rising main completed and testing not yet done. Distribution System: Work on distribution system completed. Rectification of identfied defects in pileline and testing of the same is awaited. Electrification: Internal electrification has been completed. Work on installation of electric poles for external electrification has been stopped. Pumping Machinery: Installation of Pumping machinery not yet done.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Buner)

Remarks Work on the scheme resumed in January 2018 after a period of about 03 years as it was retendered. Surface Tank: Construction of valve chambers cover not yet completed. Pump House: Completed. Rising Main: Work on rising main completed and testing not yet done. Distribution System: Work on distribution system completed and testing of the same remaining. Electrification: Internal electrification has been completed. External electrification completed except installation of energy meter. Pumping machinery: Installation of pumping machinery completed and testing of the same is awaited.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Buner)

Remarks Zone-1: Tube well: Completed. Pump house: completed. Distribution System: Fixing of 4" dia.GI pipe from tube well to node 35 has been completed. Further work stopped. Electrification: Internal and external electrification completed. Pumping Machinery: Installation of pumping machinery not yet done. Zone 2: Tube well: Completed. Distribution System: Distribution system was tested. Rrectification of identified defects not yet done. Pumping Machinery: Pumping machinery has been installed and tested. Electrification: Internal and external electrification completed. Zone 3: Distribution System: Work on distribution system 90% completed and further work is in progress. Pumping Machinery: Installation of pumping machinery not yet done.

ity Assurance for USAID’s Stabilization Activities in KP & FATA Drinking Water Supply Schemes (Buner)

Remarks The contract of the scheme was rescinded by PHED and retendered. Work order has been issued to the successful bidder. Pump House: Work on pump house completed and minor rectification/repairs are required. Surface tank: Work on surface tank was resumed on April 16, 2018 and again stopped due to unsatisfactory report of steel supplied to the site. Distribution System: Work on distribution system has been 50% completed and further work stopped. Electrification: Internal electrification completed. Work on external electrification completed except installation of energy meter and service cable. Pumping Machinery: Installation of pumping machinery not yet done.

The scheme has been tested successfully on May 14, 2018 during the joint visist of HPK, PaRRSA and PHED Buner team. Tube well: Completed. Pump House: Completed. Distribution System: Completed and tested. Electrification: Eelectrification completed. Pumping Machinery: Installation and testing of pumping machinery completed.

Independent Quality Assurance for USAID’s Stabil

Tehsil Level Government Complex

As of June 30, 201 S.No

Name of Scheme

District

PIL/FARA

Current Status

Package -1 1

Judicial Complex Building

In Progress

2

District Government Building

Not yet started due to PC 1 revision in process by PU C&W

3

Line Department Offices Building

Not yet started due to PC 1 revision in process by PU C&W

4

Jirga Hall

Not yet started due to PC 1 revision in process by PU C&W

Package -2

Swat

PIL-29

5

CAT-B Residences (10 Nos)

In Progress

6

Servant Quarter Building

Not yet started due to PC 1 revision in process by PU C&W

7

Boundary Wall

Not yet started due to PC 1 revision in process by PU C&W

Independent Quality Assurance for USAID’s Stabil 8

OHWT & Tube wells

In Progress

9

External Road & Dev. Works

Not yet started due to PC 1 revision in process by PU C&W

10

External Drainage system

Not yet started due to PC 1 revision in process by PU C&W

or USAID’s Stabilization Activities in KP & FATA

vernment Complex, Kabal Swat As of June 30, 2018 Progress (%age)

Remarks

Concrete pouring on GF columns has been completed (except staircase columns). FDT (Deep & Top) on structure backfill material in building has been conducted and results are found satisfactory. Needs to expedite the pace to complete the task.

Needs to expedite the pace to complete the task. Needs to expedite the pace to complete the task.

11.00%

Work on 10-Nos. residences are in progress.BB work in residence#1-5 GF up-to lintel level are completed. Formwork fixing on GF columns up to lintel level in residence#1-2 is in progress. Steel & formwork fixing on window & vent sill level & sides in residence#1 are in progress. FDT conducted on 2nd layer of gravel cushion bed in residence#6-10, results are found satisfactory. Stacking of gravel material for 3rd layer of gravel cushion bed is in progress.

Needs to expedite the pace to complete the task. Needs to expedite the pace to complete the task.

or USAID’s Stabilization Activities in KP & FATA No activity observed. Needs to expedite the pace to complete the task.

Needs to expedite the pace to complete the task.

Independent Quality Assurance for USAID’s Stabilization Activities in KP & FATA Burns & Trauma Centre At Hayatabad Medical Complex, Peshawar As of June 30, 2018 S.No

Name of School

District

PIL/FARA Current Status

Progress (%age)

Remarks Civil Works a. Paint work of boundary wall completed. b. Bore well completed, casing and strainer has been installed. c. Frame structure erection of Doctor’s car parking shed is completed. d. 1500 KVA transformer delivered at project site on April 23, 2018 and installed at substation. Testing & commissioning works are yet to be executed. e. Diesel generator delivered at project site on June 12, 2018 and placed at generator room.

1

Burn & Trauma Center, HMC, Peshawar

Peshawar

PIL-33

In progress

HVAC Works a. Fabrication & installation, of HVAC riser duct at various locations of building is nearly completed. Insulation/cladding work for exposed riser ducts in progress. b. Insulation & application of fire retardant paint for remaining HVAC ducts is in progress. c. Foundations for AHU’s and cooling towers at roof top and for chillers in plant room is completed. Foundations at AHU’s rooms at each floor are in progress. d. Passage of HVAC riser ducts through dismantled portions of roof & FF slabs for onward connection with AHU’s at roof top is almost completed. e. Fabrication, installation & insulation of remaining HVAC ducts due to changes suggested by HMC officials for O.T’s relocations and miscellaneous works at FF in progress. f. Fabrication/fitting of pipe hanger supports along with application of red oxide paint & placement of chilled/condenser water pipes at plant room & roof top is nearly completed. g. Fabrication & fitting of chill water pipes to independent AHU’s at roof top is in progress. h. Installation of volume control dampers at various locations in progress. i. Installation of drop necks for onward connection with diffusers is halted and subject to completion of false ceiling grid work. j. Cooling tower has been delivered at project site on May 1st, 2018 & assembling/fixing at roof top in progress. k. Fabrication/ installation of chill & condenser water pipes inside the plant room for onward connection with chillers in progress. 78.00% l. Remaining 19 out of 35 No’s AHU’s delivered at project site on June 13, 2018 where in placement at desired locations is in progress. Medical Gases a. Work order has been awarded to Total technologies by C&W department for commencement of installation/commissioning of Bio-Medical gases system. b. Shop drawings for Bio medical gases system have been approved by NESPAK and shared with HPK on April 9, 2018. c. Submittal for Bio medical gases equipment received on April 10, 2018. d. Layout, fabrication, fitting & associated works of medical gases piping system at GF, FF & SF in progress. e. Equipment delivery schedule for medical gases & solid waste management works received on May 23, 2018 however no information regarding LC’s has been shared by NESPAK.

Related Documents


More Documents from "Hashimoto Laboratory"