PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

Nº DE VECES

DESCRIPCION

Nº PARTIDA

CANT.

DIMENCIONES (M) LARGO

01

CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44

01.02

CASETA DE ALMACEN Y GUARDIANIA

01.03

TRANSPORTE DE MATERIALES Y MAQUINARIA

01.04

CERCO PERIMETRICO ESTERAS

1.00 241.90

1.00 241.90

GLB m

3,150.00 3,150.00

3,150.00 3,150.00

m2 m2

725.60

m3

157.50

m3

738.53

m3

71.84

m3

13.81

m3

79.43

m3

1,576.00

m2

49.73

m3

0.74

m3

11.88

m2

29.01

m3

386.81

m2

Area en cad

1,238.00

0.20

247.60

Area en losa deportiva

1.00

Area en cad

1,912.00

0.25

478.00

Area en Plaza Area en losa depotiva

1.00 1.00

Area en cad Area en cad

1,238.00 1,912.00

0.05 0.05

61.90 95.60

Area en Plaza

1.30

Area en cad

1,238.00

0.15

241.41

Area en losa deportiva

1.30

Area en cad

1,912.00

0.20

497.12

Excav. Zanjas de perimetro de area verde 01 (CC-1)

1.00 1.00

46.93 41.78

0.40 0.40

0.65 0.65

12.20 10.86

1.00 1.00

57.74 46.42

0.40 0.40

0.65 0.65

15.01 12.07

1.00 1.00

26.42 26.42

0.40 0.40

0.65 0.65

6.87 6.87

Excav. Zanjas de perimetro de area verde 08 (CC-1)

1.00 1.00

16.04 14.54

0.40 0.40

0.65 0.65

4.17 3.78

Excav. Zanjas de perimetro de area verde 01 (CC-1)

1.00

46.93

0.25

0.20

2.35

Excav. Zanjas de perimetro de area verde 02 (CC-1)

1.00

41.78

0.25

0.20

2.09

Excav. Zanjas de perimetro de area verde 03 (CC-1)

1.00

57.74

0.25

0.20

2.89

Excav. Zanjas de perimetro de area verde 04 (CC-1)

1.00

46.42

0.25

0.20

2.32

Excav. Zanjas de perimetro de area verde 05 (CC-1)

1.00

26.42

0.25

0.20

1.32

Excav. Zanjas de perimetro de area verde 06 (CC-1)

1.00

26.42

0.25

0.20

1.32

Excav. Zanjas de perimetro de area verde 07 (CC-1)

1.00

16.04

0.25

0.20

0.80

Excav. Zanjas de perimetro de area verde 08 (CC-1)

1.00

14.54

0.25

0.20

0.73

Proveniente de la partida excav. De zanjas

61.10

1.30

79.43

Vereda perimetral de plaza

1.00

En piso de cemento pulido y bruñado color rojo en centro de plaza

1.00 1.00

RELLENO CON MATERIAL PROPIO

ELIMINACION DE MATERIAL DESMONTE

PLAZA MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS Excav. Zanjas de perimetro de area verde 02 (CC-1) Excav. Zanjas de perimetro de area verde 03 (CC-1) Excav. Zanjas de perimetro de area verde 04 (CC-1) Excav. Zanjas de perimetro de area verde 05 (CC-1) Excav. Zanjas de perimetro de area verde 06 (CC-1) Excav. Zanjas de perimetro de area verde 07 (CC-1)

RELLENO CON MATERIAL PROPIO

ELIMINACION DE MATERIAL EXCEDENTE

Esponjamiento (30%)

TERRAPLEN PARA VEREDAS E= 0.10 M

1.20

181.20

Area Area

25.00 232.00

25.00 232.00

1.00 1.00

Area Area

248.80 82.00

248.80 82.00

4.00 1.00

Area Area

25.50 275.00

102.00 275.00

2.00 1.00

Area 78.00

20.00 5.00

40.00 390.00

1.00 1.00

46.93 41.78

0.40 0.40

0.45 0.45

8.45 7.52

1.00 1.00

57.74 46.42

0.40 0.40

0.45 0.45

10.39 8.36

1.00 1.00

26.42 26.42

0.40 0.40

0.45 0.45

4.76 4.76

1.00 1.00

16.04 14.54

0.40 0.40

0.45 0.45

2.89 2.62

Plaza Lateral

6.00 3.00

5.85 1.50

0.25 0.25

0.08 0.08

0.66 0.08

Plaza Sur

6.00

5.85

0.30

10.53

Plaza Lateral

3.00

1.50

0.30

1.35

area verde 01 (CC-1)

1.00

46.93

0.15

0.70

4.93

area verde 02 (CC-1)

1.00 1.00

41.78 57.74

0.15 0.15

0.70 0.70

4.39 6.06

1.00 1.00

46.42 26.42

0.15 0.15

0.70 0.70

4.87 2.77

area verde 07 (CC-1)

1.00 1.00

26.42 16.04

0.15 0.15

0.70 0.70

2.77 1.68

area verde 08 (CC-1)

1.00

14.54

0.15

0.70

1.53

area verde 01 (CC-1)

2.00 2.00

46.93 41.78

0.70 0.70

65.70 58.49

2.00 2.00 2.00

57.74 46.42 26.42

0.70 0.70 0.70

80.84 64.99 36.99

Vereda perimetral en juegos recreativos Vereda perimetral interior en losa deportiva Centro de Plaza En centro de plaza De circulacion peatonal interior en plaza Vereda perimetral interior en plaza Pasaje peatonal

03.02

OBRAS DE CONCRETO SIMPLE

03.02.01

CIMIENTOS CORRIDOS fc=100 kg/cm2 + 30 % P.G. T.M. 6" Excav. Zanjas de perimetro de area verde 01 (CC-1) Excav. Zanjas de perimetro de area verde 02 (CC-1) Excav. Zanjas de perimetro de area verde 03 (CC-1) Excav. Zanjas de perimetro de area verde 04 (CC-1) Excav. Zanjas de perimetro de area verde 05 (CC-1) Excav. Zanjas de perimetro de area verde 06 (CC-1) Excav. Zanjas de perimetro de area verde 07 (CC-1) Excav. Zanjas de perimetro de area verde 08 (CC-1)

151.00

GRADAS : CONCRETO: F'C=140 KG/CM2. Plaza Sur GRADAS : ENCOFRADO Y DESENCOFRADO

03.03

OBRAS DE CONCRETO ARMADO

03.03.01

SARDINEL : CONCRETO FC=175 KG/CM2

area verde 03 (CC-1) area verde 04 (CC-1) area verde 05 (CC-1) area verde 06 (CC-1)

03.03.02

241.90

1.00

03.01.01

03.02.03

und m2

Area en Plaza

03.01

03.02.02

1.00 63.00

3,150.00 3,150.00

CORTE DE MATERIAL SUELTO

03.01.04

1.00 63.00

Area en cad Area en cad

02.03

03.01.03

9.00

7.00

1.00 1.00

TRAZO, NIVELES Y REPLANTEO

03.01.02

UND

TRABAJOS PRELIMINARES LIMPIEZA DEL TERRENO

03

1.00 1.00

Perimetro

02.02

02.05

TOTAL PARCIAL

1.00 1.00

02.01

02.04

ALTO

OBRAS PRELIMINARES

01.01

02

ANCHO

SARDINEL:ENCOFRADO Y DESENCOFRADO area verde 02 (CC-1) area verde 03 (CC-1) area verde 04 (CC-1) area verde 05 (CC-1)

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

Nº DE VECES

DESCRIPCION

Nº PARTIDA

CANT.

DIMENCIONES (M) LARGO

PISOS Y PAVIMENTOS

03.04.01

PISOS

03.04.01.01

VEREDA DE PIEDRA LAVADA E=0.10 M.

2.00 2.00

26.42 16.04

0.70 0.70

36.99 22.46

area verde 08 (CC-1)

2.00

14.54

0.70

20.36

Ver planilla de metrados de acero estructural

875.05

1.05

918.80

Vereda perimetral de plaza

1.00 2.00

1.20 21.00

23.00 1.00

Area Area

0.90 82.00

82.00

4.00 1.00

Area Area

25.50 275.00

102.00 275.00

Vereda perimetral en juegos recreativos

2.00 1.00

Area Area

20.00 232.00

40.00 232.00

Vereda perimetral interior en losa deportiva

1.00

Area

248.80

248.80

En piso de cemento pulido y bruñado color rojo en centro de plaza

1.00

Area

25.00

25.00

En piso de bancas de plaza Centro de plaza En centro de plaza De circulacion peatonal interior en plaza Vereda perimetral interior de plaza

MORTERO MEZCLA 1:4 E= 2 CM

1.00 1.00

78.00 72.00

5.00 1.50

390.00 108.00

1.00 1.00

35.00 22.00

1.40 1.40

49.00 30.80

1.00 1.00

78.00 72.00

5.00 1.50

390.00 108.00

Berma Calle 55

1.00 1.00

35.00 22.00

1.40 1.40

49.00 30.80

Vereda perimetral de plaza

1.00

151.00

En piso de cemento pulido y bruñado color rojo en centro de plaza

1.00 1.00

Perimetro Perimetro

4.00 1.00

Berma Calle 19 Berma Calle 30 Berma Calle 55 SUMINISTRO Y COLOCACION DE ADOQUINES DE CONCRETO Pasaje peatonal Berma Calle 19 Berma Calle 30 03.04.01.05

ENCOFRADO DE VEREDAS DE CONCRETO

0.25

37.75

17.00 24.00

0.25 0.25

4.25 6.00

Perimetro Perimetro

25.00 48.00

0.25 0.25

25.00 12.00

23.00 1.00

Perimetro Perimetro

1.80 99.00

0.25 0.25

10.35 24.75

Vereda perimetral en juegos recreativos

2.00 1.00

Perimetro Perimetro

30.00 92.00

0.25 0.25

15.00 23.00

Vereda perimetral en losa deportiva

1.00

Perimetro

33.00

0.25

8.25

area verde 01 (CC-1)

1.00 1.00 1.00

46.93 41.78 57.74

0.55 0.55 0.55

25.81 22.98 31.76

1.00 1.00

46.42 26.42

0.55 0.55

25.53 14.53

area verde 07 (CC-1)

1.00 1.00

26.42 16.04

0.55 0.55

14.53 8.82

area verde 08 (CC-1)

1.00

14.54

0.55

8.00

area verde 01 (CC-1)

1.00

46.93

0.10

4.69

area verde 02 (CC-1)

1.00 1.00

41.78 57.74

0.10 0.10

4.18 5.77

1.00 1.00

46.42 26.42

0.10 0.10

4.64 2.64

area verde 07 (CC-1)

1.00 1.00

26.42 16.04

0.10 0.10

2.64 1.60

area verde 08 (CC-1)

1.00

14.54

0.10

1.45 -

Martillo de veredas en esquina de veredas En centro de plaza Centro de Plaza En piso de bancas de plaza De circulacion peatonal interior en plaza Vereda perimetral interior en plaza

03.04.01.06

ENCHAPE CON PIEDRA LAJA EN SARDINELES area verde 02 (CC-1) area verde 03 (CC-1) area verde 04 (CC-1) area verde 05 (CC-1) area verde 06 (CC-1)

03.05

PINTURA

03.05.01

PINTURA LATEX EN JARDINERAS

area verde 03 (CC-1) area verde 04 (CC-1) area verde 05 (CC-1) area verde 06 (CC-1)

UND

918.80

kg

1,203.00

m2

25.00

m2

577.80

m2

577.80

m2

166.35

m2

151.96

m2

27.63

m2

151.96

m2

23.00

und

7.00

und

1.00

und

181.20 42.00

PISO DE CEMENTO PULIDO COLOR ROJO DE 4"

Pasaje peatonal

03.04.01.04

% DESPERDICIO

151.00 Area

Martillo de veredas en esquina de veredas

03.04.01.03

TOTAL PARCIAL

SARDINEL: ACERO DE REFUERZO FY=4200 KG/CM2

03.04

03.04.01.02

ALTO

area verde 07 (CC-1)

area verde 06 (CC-1)

03.03.03

ANCHO

03.05.02

PINTURA BARNIZ EN PIEDRA LAJA area verde 01 (CC-1)

1.00

46.93

0.55

25.81

area verde 02 (CC-1)

1.00 1.00

41.78 57.74

0.55 0.55

22.98 31.76

1.00 1.00

46.42 26.42

0.55 0.55

25.53 14.53

area verde 07 (CC-1)

1.00 1.00

26.42 16.04

0.55 0.55

14.53 8.82

area verde 08 (CC-1)

1.00

14.54

0.55

8.00 -

area verde 03 (CC-1) area verde 04 (CC-1) area verde 05 (CC-1) area verde 06 (CC-1)

03.06

EQUIPAMIENTO

03.06.01

BANCAS DE METAL Y MADERA

03.06.02

En plaza

23.00

23.00

En plaza

4.00 3.00

4.00 3.00

1.00

1.00

BOTADERO DE BASURA En losa deportiva

03.06.03

GLORIETA DE MADERA SEGUN DISEÑO TIPO 2

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

Nº DE VECES

DESCRIPCION

Nº PARTIDA

CANT.

DIMENCIONES (M) LARGO

ANCHO

ALTO

TOTAL

UND

PARCIAL

03.06.04

JUEGO MODULAR TIPO 1

1.00

1.00

1.00

und

03.06.05

JUEGO MODULAR TIPO 2

2.00

2.00

2.00

und

325.30

m2

14.00

und

325.30

m2

999.90

m2

160.32

m2

582.80

m

490.80

m

121.73

m3

03.07

AREAS VERDES

03.07.01

SUM. E INST. TIERRA DE CHACRA H=30 CM area verde 01

1.00

Area

61.31

61.31

area verde 02

1.00 1.00

Area Area

31.63 120.10

31.63 120.10

1.00 1.00

Area Area

65.17 9.29

65.17 9.29

area verde 07

1.00 1.00

Area Area

9.29 15.98

9.29 15.98

area verde 08

1.00

Area

12.53

12.53

area verde 01

4.00 2.00

4.00 2.00

area verde 04

5.00 3.00

5.00 3.00

area verde 01

1.00

Area

61.31

61.31

area verde 02

1.00 1.00

Area Area

31.63 120.10

31.63 120.10

1.00 1.00

Area Area

65.17 9.29

65.17 9.29

area verde 07

1.00 1.00

Area Area

9.29 15.98

9.29 15.98

area verde 08

1.00

Area

12.53

12.53

Vereda perimetral de plaza

1.00 2.00

151.00 Area

1.20 21.00

181.20 42.00

23.00 1.00

Area Area

0.90 82.00

20.70 82.00

4.00 1.00

Area Area

25.50 275.00

102.00 275.00

2.00 1.00

Area Area

20.00 232.00

40.00 232.00

1.00 1.00

Area Area

248.80 25.00

25.00

area verde 03 area verde 04 area verde 05 area verde 06

03.07.02

SUM. E INST. DE ARBOLES H=1.5 MTS area verde 02 area verde 03

03.07.03

SIEMBRA DE GRASS

area verde 03 area verde 04 area verde 05 area verde 06

03.08

OTROS

03.08.01

CURADO DE VEREDAS Martillo de veredas en esquina de veredas En piso de bancas de plaza Centro de plaza En centro de plaza De circulacion peatonal interior en plaza Vereda perimetral interior de plaza Vereda perimetral en juegos recreativos Vereda perimetral interior en losa deportiva En piso de cemento pulido y bruñado color rojo en centro de plaza

03.08.02

IMPERMEABILIZACION DE JARDINERAS CON BREA

1.00 1.00

1.00 1.00

43.79 31.35

0.60 0.60

26.27 18.81

1.00 1.00

1.00 1.00

52.93 43.37

0.60 0.60

31.76 26.02

1.00 1.00

1.00 1.00

22.60 22.60

0.60 0.60

13.56 13.56

1.00 1.00

1.00 1.00

25.24 25.32

0.60 0.60

15.14 15.19

En piso de cemento pulido y bruñado color rojo en centro de plaza

1.00

37.00 1.00

1.20 Perimetro

17.00

44.40 17.00

Martillo de veredas en esquina de veredas

1.00 1.00

2.00 4.00

Perimetro Perimetro

24.00 25.00

48.00 100.00

1.00 1.00

1.00 23.00

Perimetro Perimetro

48.00 1.80

48.00 41.40

1.00 1.00

1.00 2.00

Perimetro Perimetro

99.00 30.00

99.00 60.00

1.00 1.00

1.00 1.00

Perimetro Perimetro

92.00 33.00

92.00 33.00

En piso de cemento pulido y bruñado color rojo en centro de plaza

1.00

37.00 1.00

1.20 Perimetro

17.00

44.40 17.00

Martillo de veredas en esquina de veredas

1.00 1.00

2.00 4.00

Perimetro Perimetro

24.00 25.00

48.00 100.00

1.00 1.00

1.00 23.00

Perimetro Perimetro

48.00 1.80

48.00 41.40

1.00 1.00

1.00 2.00

Perimetro Perimetro

99.00 30.00

99.00 60.00

1.00 1.00

1.00 1.00

Perimetro Perimetro

92.00 33.00

33.00

area verde 01 area verde 02 area verde 03 area verde 04 area verde 05 area verde 06 area verde 07 area verde 08 03.08.03

JUNTAS DE CONSTRUCCION CON TEKNOPORT Vereda perimetral de plaza

En centro de plaza Centro de Plaza En piso de bancas de plaza De circulacion peatonal interior en plaza Vereda perimetral interior en plaza Vereda perimetral en juegos recreativos Vereda perimetral en losa deportiva 03.08.04

JUNTAS RELLENAS C/ASFALTICAS Vereda perimetral de plaza

En centro de plaza Centro de Plaza En piso de bancas de plaza De circulacion peatonal interior en plaza Vereda perimetral interior en plaza Vereda perimetral en juegos recreativos Vereda perimetral en losa deportiva

04

CERCO PERIMETRICO

04.01

MOVIMIENTO DE TIERRAS

04.01.01

EXCAVACION DE ZANJAS Placa (PL-1) Placa (PL-2) Placa (PL-2") Placa (PL-2"") Placa (PL-2"") Placa (PL-2"") Graderias

1.00 1.00

38.70 5.81

0.60 0.60

1.00 0.90

23.22 3.14

1.00 1.00

38.40 33.40

0.60 0.60

1.10 0.90

25.34 18.04

1.00 1.00 1.00

12.90 13.90 25.30

0.60 0.60 0.80

0.90 0.90 1.20

6.97 7.51 24.29

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

Nº DE VECES

DESCRIPCION

Nº PARTIDA

CANT.

DIMENCIONES (M) LARGO

25.30 3.65

0.50 0.50

0.70 1.20

8.86 4.38

Placa (PL-1)

1.00

38.70

0.35

0.20

2.71

Placa (PL-2)

1.00 1.00

5.81 38.40

0.35 0.35

0.20 0.20

0.41 2.69

1.00 1.00

33.40 12.90

0.35 0.35

0.20 0.20

2.34 0.90

1.00 1.00

13.90 25.30

0.35 0.80

0.20 0.60

0.97 12.14

Graderias laterales

1.00 2.00

25.30 3.65

0.50 0.45

0.60 0.20

7.59 0.66

Proveniente de la partida excav. De zanjas

91.32

1.30

118.72

Placa (PL-1)

1.00 1.00

38.70 5.81

0.60 0.60

0.65 0.65

15.09 2.27

1.00 1.00

38.40 33.40

0.60 0.60

0.65 0.65

14.98 13.03

1.00 1.00 1.00

12.90 13.90 25.30

0.60 0.60 0.80

0.65 0.65 0.40

5.03 5.42 8.10

1.00 2.00

25.30 3.65

0.50 0.50

0.70 0.70

8.86 2.56

1.00 1.00

38.70 5.81

0.20 0.20

0.65 0.65

5.03 0.76

1.00 1.00

38.40 33.40

0.20 0.20

0.65 0.65

4.99 4.34

Placa (PL-2"")

1.00 1.00

12.90 13.90

0.20 0.20

0.65 0.65

1.68 1.81

Placa (PL-1)

2.00

38.70

0.65

50.31

Placa (PL-2)

2.00 2.00

5.81 38.40

0.65 0.65

7.55 49.92

Placa (PL-2"")

2.00 2.00

33.40 12.90

0.65 0.65

43.42 16.77

Placa (PL-2"")

2.00

13.90

0.65

18.07

Ver planilla de metrados de acero estructural

1,140.27

1.05

1,197.28

C-1

73.00 6.00

0.25 0.25

3.10 3.10

8.49 1.16

RELLENO CON MATERIAL PROPIO SELECCIONADO

Placa (PL-2"") Placa (PL-2"") Placa (PL-2"") Graderias Graderias ELIMINACION DE MATERIAL EXCEDENTE

04.02

OBRAS DE CONCRETO SIMPLE

04.02.01

CIMIENTOS CORRIDOS Fc=100 kg/cm2 + 25 % P.M. Placa (PL-2) Placa (PL-2") Placa (PL-2"") Placa (PL-2"") Placa (PL-2"") Graderias Graderias Graderias laterales

04.03

OBRAS DE CONCRETO ARMADO

04.03.01

PLACAS : CONCRETO F'C=175 KG/CM2 Placa (PL-1) Placa (PL-2) Placa (PL-2") Placa (PL-2"") Placa (PL-2"")

04.03.02

Placa (PL-2"")

04.03.04

PLACAS : ACERO DE REFUERZO FY=4200 Kg/CM2

04.03.06 04.03.07

C-1

1.00

73.00

0.80

3.10

181.04

C-2

1.00

6.00

1.00

3.10

18.60

1.05

1,319.20

COLUMNAS : ACERO DE REFUERZO FY=4200 Kg/CM2 Ver planilla de metrados de acero estructural

1,256.38

Graderias

1.00 1.00

25.30 25.30

0.15 0.15

6.00 3.80

22.77 14.42

Laterales

12.00 2.00

0.75 Area

0.25 12.50

0.20 0.15

0.45 3.75

Graderias

1.00

25.30

2.50

63.25

Muro de graderias Escalera de concreto en graderias

2.00 12.00

25.30 1.00

3.80 0.25

192.28 3.00

Laterales

4.00

GRADERIAS: ENCOFRADO Y DESENCOFRADO CARAVISTA

04.04

CARPINTERIA METALICA

04.04.01

CERCO METALICO S/DETALLE

m2

1,197.28

kg

9.65

m3

199.64

m2

1,319.20

kg

41.39

m3

308.53

m2

3,408.93

kg

288.00

m2

191.86

m2

150.04

m2

264.30

m2

52.25

Placa (PL-2)

1.00 1.00

5.81 38.40

1.10 1.10

6.39 42.24

Placa (PL-2"")

1.00 1.00

33.40 12.90

1.40 1.65

46.76 21.29

Placa (PL-2"")

1.00

13.90

1.65

22.94

53.00 6.00

0.80 1.00

3.10 3.10

131.44 18.60

Graderias

1.00

25.30

6.00

151.80

Muro en graderias

1.00 4.00

25.30 Area

3.00

75.90 36.60

2.80

PINTURA LATEX EN COLUMNAS

PINTURA LATEX EN GRADERIAS

9.15

186.04

est

1.35

Laterales

m3

m2

38.70

CC-2

18.60

2.00

1.00

1.00 1.00

m3

60.48

Placa (PL-1)

CC-1

75.32

60.48

21.60

Placa (PL-2"")

m3

288.00 2.00

1.00

Placa (PL-2")

118.72

2.00

COBERTURA DE FIBRAFORTE TRANSPARENTE FºGº DE 3" Y 2" S/DETALLE

PINTURA LATEX EN PLACAS

m3

3,408.93

3.20

PINTURA

30.41

1.05

45.00 2.00

04.05.01

UND

50.00

Panel

04.05

04.05.03

12.50

3,246.60 % DESPERDICIO

PUERTA METALICA DE INGRESO

04.04.03

04.05.02

Area

GRADERIAS: ACERO DE REFUERZO FY=4200 Kg/cm2 Ver planilla de metrados de acero estructural

04.04.02

% DESPERDICIO

GRADERIAS: CONCRETO F´C=175 KG/CM2 Muro de graderias

04.03.09

0.15 0.25

COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA

Escalera de concreto en graderias 04.03.08

% DESPERDICIO

COLUMNAS : CONCRETO F'C=175 KG/CM2 C-2

04.03.05

Esponjamiento (30%)

PLACAS : ENCOFRADO Y DESENCOFRADO CARAVISTA

Placa (PL-2")

04.03.03

TOTAL PARCIAL

1.00 2.00

Placa (PL-2")

04.01.03

ALTO

Graderias laterales

Graderias 04.01.02

ANCHO

PLANILLA DE METRADOS Presupuestos Lugar Nº PARTIDA

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

Nº DE VECES

DESCRIPCION

CANT.

DIMENCIONES (M) LARGO

04.05.04

ANCHO

ALTO

TOTAL

288.00

PINTURA ANTICORROSIVA + ESMALTE EN CARPINTERIA METALICA Panel

45.00

3.20

2.00

UND

PARCIAL

288.00

m2

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

Nº DE VECES

DESCRIPCION

Nº PARTIDA

CANT.

DIMENCIONES (M) LARGO

04.06

OTROS

04.06.01

JUNTA DE DILATACION CON TECKNOPORT 1"

05

MOVIMIENTO DE TIERRAS

05.01.01

PERFILADO Y COMPACTACION DE SUBRASANTE

OTROS

05.02.01

ARCO DE FULBITO Y PARANTES DE VOLEY INC. NET

06

Juntas de CC

8.00

Area de la cancha de fulbito

1.00

32.00

20.00

640.00

Area de la cancha de fulbito

1.00

32.00

20.00

640.00

MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS

1.10

2.11

Eje C-C

3.00 1.00

0.80 1.40

0.80 0.45

1.10 0.80

2.11 0.50

1.00 1.00

2.40 3.60

0.45 0.45

0.80 0.80

0.86 1.30

CC-1, eje 5

1.00 1.00

3.00 1.40

0.45 0.45

0.80 0.80

1.08 0.50

CC-4, eje 3

1.00

1.45

0.45

0.80

0.52

1.25 1.25 1.25

3.00 3.00 1.00

0.80 0.80 1.40

0.80 0.80 0.45

0.60 0.60 0.10

1.44 1.44 0.08

1.25 1.25

1.00 1.00

2.40 3.60

0.45 0.45

0.10 0.10

0.14 0.20

CC-1, eje 5

1.25 1.25

1.00 1.00

3.00 1.40

0.45 0.45

0.10 0.10

0.17 0.08

CC-4, eje 3

1.25

1.00

1.45

0.45

0.10

0.08

RELLENO CON MATERIAL PROPIO Eje A-A Eje C-C CC-2, eje 1 CC-2, eje C CC-1, eje A CC-1, eje B

ELIMINACION DE MATERIAL EXCEDENTE

5.37

Proveniente de partidas excav. De zanjas

OBRAS DE CONCRETO SIMPLE

06.02.01

CIMIENTOS CORRIDOS : Fc=100 kg/cm2 + 30 % P.G. T.M. 6"

1.00

6.00

2.70

CC-2, eje 1

1.00 1.00

1.40 2.40

0.45 0.45

0.70 0.70

0.44 0.76

1.00 1.00

3.60 3.00

0.45 0.45

0.70 0.70

1.13 0.95

CC-4, eje 3

1.00 1.00

1.40 1.45

0.45 0.45

0.70 0.70

0.44 0.46

Area ss.hh.

1.00

6.00

2.70

CC-2, eje 1

1.00 1.00

1.40 2.40

0.15 0.15

0.40 0.40

0.08 0.14

1.00 1.00

3.60 3.00

0.15 0.15

0.40 0.40

0.22 0.18

1.00 1.00

1.40 1.45

0.15 0.25

0.40 0.40

0.08 0.15

CC-2, eje C CC-1, eje B CC-1, eje 5

CC-1, eje B CC-1, eje 5 CC-4, eje 3 SOBRECIMIENTO : ENCOFRADO Y DESENCOFRADO CC-2, eje 1

1.00

2.00

1.40

0.40

1.12

CC-2, eje C

1.00 1.00

2.00 2.00

2.40 3.60

0.40 0.40

1.92 2.88

CC-1, eje 5

1.00 1.00

2.00 2.00

3.00 1.40

0.40 0.40

2.40 1.12

CC-4, eje 3

1.00

2.00

1.45

0.40

1.16

Eje A-A -zapata 1

3.00

0.80

0.80

0.50

0.96

Eje C-C-zapata 1

3.00

0.80

0.80

0.50

0.96

3.00 3.00

0.80 0.80

0.80 0.80

CC-1, eje A CC-1, eje B

06.03

OBRAS DE CONCRETO ARMADO

06.03.01

ZAPATAS : CONCRETO F'C= 210 KG/CM2

ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATAS Eje A-A -zapata 1 Eje C-C-zapata 1

4.00 4.00

Ver planilla de metrados de acero estructural

34.36

% DESPERDICIO

C-1 eje A-A

3.00 3.00

0.25 0.25

1.05

36.08

3.05 3.05

0.34 0.34

COLUMNAS : CONCRETO F'C=175 KG/CM2

0.15 0.15

COLUMNAS : ENCOFRADO Y DESENCOFRADO C-1 eje A-A

1.00

3.00

0.40

3.05

3.66

C-1 eje C-C

1.00

3.00

0.40

3.05

3.66

1.05

388.54

0.20 0.20

0.41 0.16

COLUMNAS : ACERO DE REFUERZO FY=4200 Kg/CM2

370.04

Ver planilla de metrados de acero estructural 06.03.07

640.00

m2

2.00

und

640.00

m2

8.99

m3

3.63

m3

6.71

m3

16.20

m2

4.17

m3

16.20

m2

0.85

m3

10.60

m2

1.92

m3

15.36

m2

36.08

kg

0.69

m3

7.32

m2

388.54

kg

0.72

m3

7.68 7.68

ACERO PARA ZAPATAS GRADO 60

C-1 eje C-C

06.03.06

m2

16.20

SOBRECIMIENTO: CONCRETO 1:8 + 25% P.M. (P.S.) CC-2, eje C

06.03.05

640.00

16.20

FALSO PISO E= 3"

CC-1, eje A

06.03.04

ml

6.71

Area ss.hh.

CC-1, eje A

06.03.03

Esponjamiento 25%

NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO

06.02

06.03.02

640.00

0.80

CC-1, eje B

06.02.04

640.00

0.80

CC-2, eje C

06.02.03

2.00

3.00

CC-1, eje A

06.02.02

2.00

Eje A-A CC-2, eje 1

06.01.04

20.00

SERVICIOS HIGIENICOS

06.01.01

06.01.03

UND

20.00

SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. DEMARCACION

06.01

06.01.02

2.50

TOTAL PARCIAL

BASE GRANULAR E=0.15M

05.02

05.02.02

ALTO

LOSA DEPORTIVA DE GRASS SINTETICO

05.01

05.01.02

ANCHO

% DESPERDICIO

VIGAS : CONCRETO F'C=210 KG/CM2 VP-1, ejes 1,3,5 VS-1, eje A, entre 1-3, 3-5

3.00 2.00

1.00 1.00

2.70 2.60

0.25 0.15

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

Nº DE VECES

DESCRIPCION

Nº PARTIDA

CANT.

DIMENCIONES (M) LARGO

06.03.08

06.03.09

06.03.11 06.03.12

2.00

1.00

2.60

0.15

VP-1, ejes 1,3,5 VS-1, eje A, entre 1-3, 3-5

3.00 2.00

1.00 1.00

2.70 2.60

0.45 0.35

3.65 1.82

VS-1, eje B, entre 1-3, 1-5

2.00

1.00

2.60

0.35

1.82

163.08

LOSA ALIGERADA : CONCRETO F'C=210 KG/CM2 (P.S.) Eje A-C entre ejes 1 al 5

1.00

1.00

6.00

2.70

Area ss.hh.

1.00

1.00

6.00

2.70

MURO DE SOGA LADRILLO

82.93 1.00

REVESTIMIENTOS

06.05.01

TARRAJEO MUROS INTERIORES Y EXTERIORES

8.33

134.95

entre 1-3, 3-5

2.70 2.60

2.45 2.45

13.23 12.74

eje B, entre 1-3, 3-5

2.00

2.60

2.45

12.74

eje 3

1.00

2.70

2.45

6.62

2.00 2.00

2.00 2.00

2.70 2.60

2.45 2.45

26.46 25.48

2.00 1.00

2.00 2.00

2.60 2.70

2.45 2.45

25.48 13.23

En zona de ducha varones

1.00

4.80

1.80

8.64

En zona de ducha damas

1.00

4.80

1.80

8.64

Area cieloraso ss.hh.

1.00

6.00

En zona de ducha varones

1.00

4.80

1.80

8.64

En zona de ducha damas

1.00

4.80

1.80

8.64

Area de piso en ss.hh.

1.00

6.00

2.70

16.20

En baño varones

1.00 1.00

1.40 1.40

1.75 1.75

2.45 2.45

entre 1-3, 3-5 eje 3

2.70

TARRAJEO RAYADO

TARRAJEO DE CIELO RASO

06.06

ZOCALOS

06.06.01

ZOCALO DE LOSETA CERAMICA DE 30 x 30 CM

06.07

PISOS Y PAVIMENTOS

06.07.01

PISO DE LOSETA CERAMICA DE 30 x 30 CM

06.08

CARPINTERIA METALICA

06.08.01

DIVISIONES METALICAS En baño damas

2.70

En baño varones

2.00

1.00

2.00

En baño damas

2.00

1.00

2.00

En baño varones

2.00 2.00

1.00 1.00

2.00 2.00

VENTANA METALICA SS.HH. En baño damas

VIDRIOS, CRISTALES Y SIMILARES

06.09.01

VIDRIO SEMI DOBLE PROVISION Y COLOCACION EN VENTANAS DE FIERRO

2.00 2.00

En baño varones En baño damas

06.10

CERRAJERIA

06.10.01

CERRADURAS TIPO PARCHE

06.10.02

BISAGRA METALICA

06.11

PINTURA

06.11.01

PINTURA LATEX EN INTERIORES Y EXTERIORES

0.40 0.40

0.40 0.40

entre 1-3, 3-5 eje B, entre 1-3, 3-5 eje 3

2.00 6.00

2.00 2.00

2.00 2.00

2.70 2.60

2.45 2.45

26.46 25.48

2.00 1.00

2.00 2.00

2.60 2.70

2.45 2.45

25.48 13.23

1.00

6.00

2.70

2.70

16.20

PINTURA LATEX EN CIELO RASO Area de piso en ss.hh.

171.23

kg

1.46

m3

16.20

m2

87.08

kg

135.00

und

38.71

m2

6.62

m2

90.65

m2

17.28

m2

16.20

m2

17.28

m2

16.20

m2

4.90

m2

4.00

est

4.00

est

0.64

m2

2.00 6.00

pza und

90.65

m2

16.20

m2

10.00

m2

2.01

m3

2.01

m3

0.32 0.32

2.00 6.00

eje 1, 5

m2

16.20

PUERTA METALICA SS.HH.

06.09

PINTURA ANTICORR. Y ESMALTE EN PTAS/VENTANAS En baño varones

2.00

1.00

2.50

1.00

5.00

En baño damas

2.00

1.00

2.50

1.00

5.00

Excav. P/Tub. Desague 4"

1.00

12.20

0.30

0.30

1.10

Excav. P/Tub. Desague 2"

1.00

10.10

0.30

0.30

0.91

Excav. P/Tub. Desague 4"

1.00 1.00

12.20 10.10

0.30 0.30

0.30 0.30

1.10 0.91

INSTALACIONES SANITARIAS

07.01

SERVICIOS HIGIENICOS

07.01.01

EXCAVACION DE ZANJAS

07.01.02

87.08

2.00 2.00

eje B, entre 1-3, 3-5

07

1.05

6.00

eje 1, 5

06.11.03

% DESPERDICIO

7.29

16.20

MURO DE CABEZA LADRILLO

06.05

06.11.02

1.46

1.00

ejes 1,5

06.08.03

factor 0.09

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO

ALBAÑILERIA

06.08.02

171.23

LOSA ALIGERADA : ACERO F´Y = 4200 KG/CM2

06.04.01

06.05.03

1.05

LOSA ALIGERADA : ENCOFRADO Y DESENCOFRADO NORMAL

06.04

06.05.02

% DESPERDICIO

UND

0.16

VIGAS : ACERO DE REFUERZO FY=4200 Kg/CM2

Eje A-C entre ejes 1 al 5

06.04.02

0.20

TOTAL PARCIAL

VS-1, eje B, entre 1-3, 1-5

Ver planilla de metrados de acero estructural 06.03.13

ALTO

VIGAS: ENCOFRADO Y DESENCOFRADO

Ver planilla de metrados de acero estructural 06.03.10

ANCHO

RELLENO CON MATERIAL PROPIO Excav. P/Tub. Desague 2"

2.00 3.00 5.00

2.00 3.00 5.00

2.00 3.00 5.00

pza pza und

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

7.00 2.00

7.00 2.00

7.00 2.00

pto pto

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

2.00

2.00

2.00

pto

07.01.03

INODORO TANQUE BAJO BLANCO INC/ACCES.

07.01.04

LAVATORIO DE PARED DE COLOR 1 LLAVE

07.01.05

INSTALACION DE APARATOS SANITARIOS

07.01.06

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

07.01.07 07.01.08

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

Nº DE VECES

DESCRIPCION

Nº PARTIDA

CANT.

DIMENCIONES (M) LARGO

m m

10.00 2.00

10.00 2.00

10.00 2.00

m pza

2.00 1.00

2.00 1.00

2.00 1.00

pza pza

11.00 24.40

11.00 24.40

11.00 24.40

pto m

CONEXION EXTERIOR A RED DE AGUA

2.00 1.00

2.00 1.00

2.00 1.00

und GLB

CONEXION EXTERIOR A RED DE DESAGUE

1.00

1.00

1.00

GLB

41.19

m3

39.86

m3

5.00 85.00

und m

39.00

m3

9.00

m3

27.00

m3

3.00

m3

2.43

m3

07.01.11

RED COLECTORA PVC 6"

07.01.12

SUMIDEROS DE 2"

07.01.13

REGISTROS DE BRONCE DE 4"

07.01.14

CAJA DE REGISTRO DE DESAGUE 12" X 24"

07.01.15

SALIDA DE AGUA FRIA Ø 1/2"

07.01.16

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

07.01.17

LLAVE DE PASO DE 1/2"

07.01.18

07.02.02

PLAZA EXCAVACION DE ZANJAS

GRIFO DE RIEGO

07.02.04

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

PLAZA

08.01.01

EXCAVACION DE ZANJAS

08.01.03

1.00

22.70

0.50

0.60

6.81

A colector publico desague Excav. De zanjas para inst. sanitarias de agua

1.00 1.00

2.50 165.00

0.50 0.40

1.10 0.50

1.38 33.00

Excav. De zanjas para inst. sanitarias

1.00

22.70

0.50

0.50

5.68

A colector publico

1.00 1.00

2.50 165.00

0.50 0.40

0.95 0.50

1.19 33.00

5.00 85.00

5.00 85.00

INSTALACIONES ELECTRICAS

08.01

08.01.02

Excav. De zanjas para inst. sanitarias desague

RELLENO CON MATERIAL PROPIO

07.02.03

08

UND

14.00 12.30

RED DE DESAGUE PVC-SAL 4"

07.02.01

TOTAL PARCIAL

14.00 12.30

TUBERIA DE DESAGUE PVC-SAL 2"

07.01.10

07.02

ALTO

14.00 12.30

07.01.09

07.01.19

ANCHO

Excav. Zanjas para instalaciones electricas

1.00

100.00

0.60

0.65

39.00

Relleno de zanjas para instalaciones electricas

1.00

100.00

0.60

0.15

9.00

Relleno de zanjas para instalaciones electricas

1.00

100.00

0.60

0.20

12.00

Relleno de zanjas material sernido para instalaciones electricas

1.00 3.00

100.00

0.60

0.25

15.00 3.00

RELLENO CON ARENA FINA RELLENO CON MATERIAL PROPIO

08.01.04

ELIMINACION DE MATERIAL DESMONTE

08.01.05

CONCRETO P/POSTE Postes para farolas ornamentales (cimientos)

8.00

Area

0.19

1.00

1.52

Postes para farolas ornamentales (bases)

8.00 8.00

Area

0.19

0.60

0.91 8.00

8.00

und

0.19

8.00 8.00

8.00 8.00

und und

22.00 21.00

22.00 21.00

22.00 21.00

100.00 8.00

100.00 8.00

100.00 8.00

m und

100.00 12.00 400.00

100.00 12.00 400.00

100.00 12.00 400.00

m und und

8.00 4.00

8.00 4.00

8.00 4.00

und rll

10.00 5.00

10.00 5.00

10.00 5.00

08.01.06

POSTE METALICA DE 5.00 MTS

08.01.07

FAROLA ESFERICA E-44

08.01.08

CORTACIRCUITO BIPOLAR

08.01.09

CONDUCTOR NLT 2X4MM2.

08.01.10

CONDUCTOR DE 2 X 1 X 10 MM2 NYY

08.01.11

CONDUCTOR DE 2 X 1 X 6 MM2 NYY

08.01.12

EMPALME SUBTERRANEO P/C 6 Y 10 MM2

08.01.13

CINTA SEÑALIZADORA

08.01.14

CONECTOR DE COBRE

08.01.15

LADRILLO

08.01.16

DUCTO DE CONCRETO DOS VIAS

08.01.17

CINTA AISLANTE

08.01.18

TUBO DE FIERRO GALVANIZADO 5.00 MTS. X 2"

08.01.19

CINTA BAN-DIT 1/2"

08.01.20

PRESILLA 1/2"

08.01.21

POZO-CONEXION A TIERRA

5.00 1.00

5.00 1.00

5.00 1.00

und und

TABLERO DE DISTRIBUCION P/4 CIRCUITOS

1.00

1.00

1.00

jgo

31.98

m3

7.38

m3

22.14

m3

2.46 3.84

m3 m3

3.84 4.00

4.00

und

4.00 60.00

4.00 60.00

4.00 60.00

und m

82.00 4.00 82.00

82.00 4.00 82.00

82.00 4.00 82.00

m und m

8.00 328.00

8.00 328.00

8.00 328.00

und und

4.00 4.00

4.00 4.00

4.00 4.00

und rll

5.00 5.00

5.00 5.00

5.00 5.00

m und

1.00 1.00

1.00 1.00

1.00 1.00

und jgo

8.00 4.00

8.00 4.00

8.00 4.00

und und

08.01.22

08.02

LOSA DEPORTIVA

08.02.01

EXCAVACION DE ZANJAS

08.02.02 08.02.03

8.00 8.00

Excav. Zanjas para instalaciones electricas

1.00

82.00

0.60

0.65

31.98

Relleno de zanjas para instalaciones electricas

1.00

82.00

0.60

0.15

7.38

Relleno de zanjas para instalaciones electricas

1.00 1.00

82.00 82.00

0.60 0.60

0.20 0.25

9.84 12.30

RELLENO CON ARENA FINA RELLENO CON MATERIAL PROPIO Relleno de zanjas material sernido para instalaciones electricas

08.02.04

ELIMINACION DE MATERIAL DESMONTE

08.02.05

CONCRETO P/POSTE

08.02.06

POSTE DE C.A.C 11/200

08.02.07

CORTACIRCUITO BIPOLAR

08.02.08

CONDUCTOR NLT 2X4MM2.

08.02.09

CONDUCTOR DE 2 X 1 X 6 MM2 NYY

08.02.10

EMPALME SUBTERRANEO P/C 6 Y 10 MM2

08.02.11

CINTA SEÑALIZADORA

08.02.12

CONECTOR DE COBRE

08.02.13

LADRILLO

08.02.14

DUCTO DE CONCRETO DOS VIAS

08.02.15

CINTA AISLANTE

08.02.16

CINTA BAN-DIT 1/2"

08.02.17

PRESILLA 1/2"

08.02.18

POZO-CONEXION A TIERRA

08.02.19

TABLERO DE DISTRIBUCION P/4 CIRCUITOS

2.46 Postes de c.a.c 11/200

08.02.20

REFLECTORES DE 400 WATTS VAPOR DE SODIO

08.02.21

CRUCETA METALICA DE FºGº DE 2"X2"X1/4" X 0.80

4.00 4.00

2.46 0.80

0.80

1.20 0.96

m m

m m

8.03

SERVICIOS HIGIENICOS

08.03.01

SALIDA PARA CENTROS DE LUZ

4.00

4.00

4.00

pto

08.03.02

ACOMETIDA SUBTERRANEA - MONOFASICA

1.00

1.00

1.00

GLB

08.03.03

CONDUCTOR ELECTRICO 2 x 2.5 MM2 TW

23.00

23.00

23.00

m

PLANILLA DE METRADOS - ACERO ESTRUCTURAL

PROYECTO

Item

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA”

:

DESCRIP.

Diam.

Detalle

Longitud

# Veces

# elemen. Estruc.

Peso (Kg)

Total (Kg)

SS.HH. 06.03.03

34.36

ACERO PARA ZAPATAS GRADO 60 ZAPATAS

34.36

1

ACERO LONGITUDINAL SENTIDO X-X

#

4

0.72

0.72

4

6

17.18

2

ACERO LONGITUDINAL SENTIDO Y-Y

#

4

0.72

0.72

4

6

17.18

06.03.06

370.04

COLUMNAS : ACERO DE REFUERZO FY=4200 Kg/CM2

C-1 1

370.04 ACERO LONGITUDINAL

#

4

#

3

3.90

3.90

4

6

93.08

0.86

25

6

72.16

0.60

8

6

28.64

3.40

4

6

81.14

0.86

23

6

66.38

0.24

2

ESTRIBO 1

0.09

0.10

0.09

0.24

3

4

EMPALME EN ZAPATA Y TECHO

ACERO LONGITUDINAL

#

4

#

4

#

3

0.60

3.40

0.24

5

ESTRIBO 1

0.09

0.10 0.24

0.09

PLANILLA DE METRADOS - ACERO ESTRUCTURAL

PROYECTO

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA”

:

Item

DESCRIP.

6

EMPALME EN ZAPATA Y TECHO

06.03.09

Diam. #

Detalle

4

0.60

Longitud

# Veces

# elemen. Estruc.

Peso (Kg)

0.60

8

6

28.64

163.08

VIGAS : ACERO DE REFUERZO FY=4200 Kg/CM2 VIGA

1

ACERO LONGITUDINAL SUPERIOR

#

4

#

3

Total (Kg)

163.08

2.65

2.65

4

4

42.16

1.10

16

4

39.38

2.65

4

4

42.16

1.10

16

4

39.38

0.25

2

ESTRIBOS

0.20

0.10

0.20

0.25

1

ACERO LONGITUDINAL SUPERIOR

#

4

#

3

2.65

0.25

2

ESTRIBOS

0.20

0.10

0.20

0.25

06.03.12

82.93

LOSA ALIGERADA : ACERO F´Y = 4200 KG/CM2 ss.hh.

1

ACERO LONGITUDINAL INFERIOR

#

4

2

ACERO LONGITUDINAL INFERIOR

#

4

0.20

6.00

1.50

82.93 0.20

6.40

7

1

44.55

1.50

7

1

10.44

PLANILLA DE METRADOS - ACERO ESTRUCTURAL

PROYECTO

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA”

:

Item

DESCRIP.

3

TRASLAPES MOMENTO NEGATIVO

#

4

4

ACERO DE TEMPERATURA

#

2

03.03.03

Diam.

Detalle

0.85

0.85

2.70

Longitud

# Veces

# elemen. Estruc.

Peso (Kg)

1.70

7

1

11.83

2.70

24

1

16.11

875.05

SARDINEL: ACERO DE REFUERZO FY=4200 KG/CM2 SARDINELES

1

ACERO LONGITUDINAL SENTIDO X-X

#

3

2

ACERO LONGITUDINAL SENTIDO Y-Y

#

2

04.03.03

0.30

875.05

1.00

1.30

920

1

668.99

276.29

276.29

3

1

206.06

1140.27

PLACAS : ACERO DE REFUERZO FY=4200 Kg/CM2 PLACAS

1

ACERO LONGITUDINAL SENTIDO X-X

#

4

0.15

Total (Kg)

1.15

1140.27 1.30

154.8

1

200.12

PLANILLA DE METRADOS - ACERO ESTRUCTURAL

PROYECTO

Item

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA”

:

DESCRIP.

Diam.

2

ACERO LONGITUDINAL SENTIDO Y-Y

#

3

3

ACERO LONGITUDINAL SENTIDO X-X

#

4

4

ACERO LONGITUDINAL SENTIDO Y-Y

#

3

5

ACERO LONGITUDINAL SENTIDO X-X

#

4

6

ACERO LONGITUDINAL SENTIDO Y-Y

#

3

7

ACERO LONGITUDINAL SENTIDO X-X

#

4

8

ACERO LONGITUDINAL SENTIDO Y-Y

#

3

04.03.06

Detalle

38.70

0.15

1.15

44.21

0.15

1.15

33.40

0.15

1.15

26.80

Longitud

# Veces

# elemen. Estruc.

Peso (Kg)

38.70

5

1

108.24

1.30

176.84

1

228.61

44.21

5

1

123.65

1.30

133.6

1

172.71

33.40

5

1

93.41

1.30

107.2

1

138.58

26.80

5

1

74.95

1256.38

COLUMNAS : ACERO DE REFUERZO FY=4200 Kg/CM2 C - 1 Y C-2

1

ACERO LONGITUDINAL

#

3

0.15

Total (Kg)

3.60

1256.38 3.75

4

73

612.50

PLANILLA DE METRADOS - ACERO ESTRUCTURAL

PROYECTO

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA”

:

Item

DESCRIP.

Diam.

2

ESTRIBO 1

#

Detalle

Longitud

# Veces

# elemen. Estruc.

Peso (Kg)

1.00

25

73

453.70

3.75

4

6

89.50

1.20

25

6

100.68

Total (Kg)

0.25

2

0.15

0.20

0.15

0.25

3

ACERO LONGITUDINAL

#

4

#

3

0.15

3.60

0.25

4

ESTRIBO 1

0.25

0.20

0.25

0.25

04.03.09

3246.60

GRADERIAS: ACERO DE REFUERZO FY=4200 Kg/cm2 GRADERIAS

1

ACERO LONGITUDINAL VERTICALES MURO DE CONTENCION

#

4

2

ACERO LONGITUDINAL HORIZONTAL MURO DE CONTENCION

#

4

1

ACERO LONGITUDINAL SENTIDO X-X

#

3

2

ACERO LONGITUDINAL SENTIDO Y-Y

#

4

1

ACERO EN MURO LATERAL HORIZONTAL

#

3

1

ACERO EN MURO LATERAL HORIZONTAL

#

3

2

ACERO EN MURO LATERAL VERTICAL

#

3

2

ACERO EN MURO LATERAL VERTICAL

#

4

0.60

4.10

25.30

25.30

0.60

9.45

2.12

3.20

0.35

3.27

3246.60 4.70

126

2

1177.78

25.30

17

2

855.39

25.30

19

1

268.88

10.05

84

1

839.48

2.12

7

2

16.60

3.20

6

2

21.48

3.62

10

2

40.50

4.44

3

2

26.49

PLANILLA DE METRADOS - ACERO ESTRUCTURAL

PROYECTO

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA”

:

Item

DESCRIP.

2

ACERO EN MURO LATERAL VERTICAL

Diam. #

4

Detalle 0.35

4.09

Longitud

# Veces

# elemen. Estruc.

Peso (Kg)

4.44

3

2

26.49

Total (Kg)

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

DESCRIPCION

Nº PARTIDA

01

Nº DE VECES

CANT.

DIMENCIONES (M) LARGO

ALTO

TOTAL

UND

PARCIAL

OBRAS PRELIMINARES

01.01

CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44

1.00

01.02

CASETA DE ALMACEN Y GUARDIANIA

1.00

01.03

TRANSPORTE DE MATERIALES Y MAQUINARIA

01.04

CERCO PERIMETRICO ESTERAS

1.00 1.00

Perimetro

02

ANCHO

7.00

1.00

1.00

9.00

63.00

63.00

und m2

241.90

1.00 241.90

1.00 241.90

GLB m

TRABAJOS PRELIMINARES

02.01

LIMPIEZA DEL TERRENO

1.00

Area en cad

3,150.00

3,150.00

3,150.00

m2

02.02

TRAZO, NIVELES Y REPLANTEO

1.00

Area en cad

3,150.00

3,150.00

02.03

CORTE DE MATERIAL SUELTO

3,150.00 725.60

m2 m3

02.04

RELLENO CON MATERIAL PROPIO

02.05

ELIMINACION DE MATERIAL DESMONTE

157.50 738.53

m3 m3

03

PLAZA

03.01

MOVIMIENTO DE TIERRAS

03.01.01

EXCAVACION DE ZANJAS

75.15

m3

03.01.02

RELLENO CON MATERIAL PROPIO

03.01.03

ELIMINACION DE MATERIAL EXCEDENTE

17.07 79.51

m3 m3

1,576.00

m2

03.01.04

TERRAPLEN PARA VEREDAS E= 0.10 M

03.02

OBRAS DE CONCRETO SIMPLE

03.02.01

CIMIENTOS CORRIDOS fc=100 kg/cm2 + 30 % P.G. T.M. 6"

47.84

m3

03.02.02

GRADAS : CONCRETO: F'C=140 KG/CM2.

03.02.03

GRADAS : ENCOFRADO Y DESENCOFRADO

0.74 11.88

m3 m2

03.03

OBRAS DE CONCRETO ARMADO

03.03.01

SARDINEL : CONCRETO FC=175 KG/CM2

03.03.02

SARDINEL:ENCOFRADO Y DESENCOFRADO

19.25 256.74

m3 m2

03.03.03

SARDINEL: ACERO DE REFUERZO FY=4200 KG/CM2

918.80

kg

03.04

PISOS Y PAVIMENTOS

03.04.01

PISOS

03.04.01.01

VEREDA DE PIEDRA LAVADA E=0.10 M.

03.04.01.02

PISO DE CEMENTO PULIDO COLOR ROJO DE 4"

1,203.00 25.00 577.80 577.80 166.35

m2 m2 m2 m2 m2

145.91

m2

03.04.01.03

MORTERO MEZCLA 1:4 E= 2 CM

03.04.01.04

SUMINISTRO Y COLOCACION DE ADOQUINES DE CONCRETO

03.04.01.05

ENCOFRADO DE VEREDAS DE CONCRETO

03.04.01.06

ENCHAPE CON PIEDRA LAJA EN SARDINELES

03.05

PINTURA

03.05.01

PINTURA LATEX EN JARDINERAS

03.05.02

PINTURA BARNIZ EN PIEDRA LAJA

03.06

EQUIPAMIENTO

03.06.01

BANCAS DE METAL Y MADERA

03.06.02

BOTADERO DE BASURA

18.79

m2

145.91

m2 und und und

03.06.03

GLORIETA DE MADERA SEGUN DISEÑO TIPO 2

1.00

1.00

23.00 7.00 1.00

03.06.04

JUEGO MODULAR TIPO 1

03.06.05

JUEGO MODULAR TIPO 2

1.00 2.00

1.00 2.00

1.00 2.00

und und

335.10 14.00 335.10

m2 und m2

999.90 96.15 582.80 490.80

m2 m2 m m

121.73 30.41 118.72

m3 m3 m3

75.32

m3

18.60 93.02 1,197.28 7.32 150.04 1,319.20 40.39 295.13 3,408.93

m3 m2 kg m3 m2 kg m3 m2 kg

288.00 2.00 60.48

m2 est m2

191.86

m2

03.07

AREAS VERDES

03.07.01

SUM. E INST. TIERRA DE CHACRA H=30 CM

03.07.02

SUM. E INST. DE ARBOLES H=1.5 MTS

03.07.03

SIEMBRA DE GRASS

03.08

OTROS

03.08.01

CURADO DE VEREDAS

03.08.02

IMPERMEABILIZACION DE JARDINERAS CON BREA

03.08.03

JUNTAS DE CONSTRUCCION CON TEKNOPORT

03.08.04

04

JUNTAS RELLENAS C/ASFALTICAS

CERCO PERIMETRICO

04.01

MOVIMIENTO DE TIERRAS

04.01.01

EXCAVACION DE ZANJAS

04.01.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

04.01.03

ELIMINACION DE MATERIAL EXCEDENTE

04.02

OBRAS DE CONCRETO SIMPLE

04.02.01

CIMIENTOS CORRIDOS Fc=100 kg/cm2 + 25 % P.M.

04.03

OBRAS DE CONCRETO ARMADO

04.03.01

PLACAS : CONCRETO F'C=175 KG/CM2

04.03.02

PLACAS : ENCOFRADO Y DESENCOFRADO CARAVISTA

04.03.03

PLACAS : ACERO DE REFUERZO FY=4200 Kg/CM2

04.03.04

COLUMNAS : CONCRETO F'C=175 KG/CM2

04.03.05

COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA

04.03.06

COLUMNAS : ACERO DE REFUERZO FY=4200 Kg/CM2

04.03.07

GRADERIAS: CONCRETO F´C=175 KG/CM2

04.03.08

GRADERIAS: ENCOFRADO Y DESENCOFRADO CARAVISTA

04.03.09

GRADERIAS: ACERO DE REFUERZO FY=4200 Kg/cm2

04.04

CARPINTERIA METALICA

04.04.01

CERCO METALICO S/DETALLE

04.04.02

PUERTA METALICA DE INGRESO

04.04.03

COBERTURA DE FIBRAFORTE TRANSPARENTE FºGº DE 3" Y 2" S/DETALLE

04.05

PINTURA

04.05.01

PINTURA LATEX EN PLACAS

2.00 1.00

21.60

2.80

2.00 60.48

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

DESCRIPCION

Nº PARTIDA

Nº DE VECES

CANT.

DIMENCIONES (M) LARGO

ANCHO

ALTO

TOTAL

UND

PARCIAL

04.05.02

PINTURA LATEX EN COLUMNAS

150.04

m2

04.05.03

PINTURA LATEX EN GRADERIAS

04.05.04

PINTURA ANTICORROSIVA + ESMALTE EN CARPINTERIA METALICA

264.30 288.00

m2 m2

04.06

OTROS 20.00

ml

04.06.01

05

JUNTA DE DILATACION CON TECKNOPORT 1"

LOSA DEPORTIVA

05.01

MOVIMIENTO DE TIERRAS

05.01.01

PERFILADO Y COMPACTACION DE SUBRASANTE

620.00

m2

05.01.02

BASE GRANULAR E=0.15M

05.01.03

EXCAVACION DE ZANJAS

620.00 6.38

m2 m3

05.01.04

ELIMINACION DE MATERIAL EXCEDENTE

7.97

m2

05.02

OBRAS DE CONCRETO SIMPLE

05.02.01

SARDINEL SUMERGIDO EN LOSA DE CONCRETO F´C=140 KG/CM2

05.02.02

LOSA DE CONCRETO SIMPLE F´C=140 KG/CM2

05.02.03

ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO

05.03

PINTURA

05.03.01

PINTURA ESMALTE EN LOSA DEPORTIVA

05.04

OTROS

6.38

m3

620.00 30.50

m2 m2

16.60

m2

05.04.01

CURADO DE LOSA DEPORTIVA

620.00

m2

05.04.02

JUNTA DE CONSTRUCCION CON TEKNOPORT

05.04.03

JUNTAS ASFALTICAS

317.00 317.00

m2 m

2.00

und

8.99 3.63 6.71 16.20

m3 m3 m3 m2

4.17 16.20 0.85 10.60

m3 m2 m3 m2

1.92 15.36

m3 m2

36.08 0.69 7.32 388.54 0.72

kg m3 m2 kg m3

7.29 171.23 1.46 16.20 87.08 135.00

m2 kg m3 m2 kg und

38.71 6.62

m2 m2

90.65 17.28 16.20

m2 m2 m2

17.28

m2

16.20

m2

4.90 4.00 4.00

m2 est est

0.64

m2

2.00 6.00

pza und

90.65 16.20 10.00

m2 m2 m2

2.01

m3

05.04.04

06

ARCO DE FULBITO INC TABLERO DE BASQUET

SERVICIOS HIGIENICOS

06.01

MOVIMIENTO DE TIERRAS

06.01.01

EXCAVACION DE ZANJAS

06.01.02

RELLENO CON MATERIAL PROPIO

06.01.03

ELIMINACION DE MATERIAL EXCEDENTE

06.01.04

NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO

06.02

OBRAS DE CONCRETO SIMPLE

06.02.01

CIMIENTOS CORRIDOS : Fc=100 kg/cm2 + 30 % P.G. T.M. 6"

06.02.02

FALSO PISO E= 3"

06.02.03

SOBRECIMIENTO: CONCRETO 1:8 + 25% P.M. (P.S.)

06.02.04

SOBRECIMIENTO : ENCOFRADO Y DESENCOFRADO

06.03

OBRAS DE CONCRETO ARMADO

06.03.01

ZAPATAS : CONCRETO F'C= 210 KG/CM2

06.03.02

ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATAS

06.03.03

ACERO PARA ZAPATAS GRADO 60

06.03.04

COLUMNAS : CONCRETO F'C=175 KG/CM2

06.03.05

COLUMNAS : ENCOFRADO Y DESENCOFRADO

06.03.06

COLUMNAS : ACERO DE REFUERZO FY=4200 Kg/CM2

06.03.07

VIGAS : CONCRETO F'C=210 KG/CM2

06.03.08

VIGAS: ENCOFRADO Y DESENCOFRADO

06.03.09

VIGAS : ACERO DE REFUERZO FY=4200 Kg/CM2

06.03.10

LOSA ALIGERADA : CONCRETO F'C=210 KG/CM2 (P.S.)

06.03.11

LOSA ALIGERADA : ENCOFRADO Y DESENCOFRADO NORMAL

06.03.12

LOSA ALIGERADA : ACERO F´Y = 4200 KG/CM2

06.03.13

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO

06.04

ALBAÑILERIA

06.04.01 06.04.02

MURO DE SOGA LADRILLO MURO DE CABEZA LADRILLO

06.05

REVESTIMIENTOS

06.05.01

TARRAJEO MUROS INTERIORES Y EXTERIORES

06.05.02

TARRAJEO RAYADO

06.05.03

TARRAJEO DE CIELO RASO

06.06

ZOCALOS

06.06.01

ZOCALO DE LOSETA CERAMICA DE 30 x 30 CM

06.07

PISOS Y PAVIMENTOS

06.07.01

PISO DE LOSETA CERAMICA DE 30 x 30 CM

06.08

CARPINTERIA METALICA

06.08.01

DIVISIONES METALICAS

06.08.02

PUERTA METALICA SS.HH.

06.08.03

VENTANA METALICA SS.HH.

06.09

VIDRIOS, CRISTALES Y SIMILARES

06.09.01

VIDRIO SEMI DOBLE PROVISION Y COLOCACION EN VENTANAS DE FIERRO

06.10

CERRAJERIA

06.10.01

CERRADURAS TIPO PARCHE

06.10.02

BISAGRA METALICA

06.11

PINTURA

06.11.01

PINTURA LATEX EN INTERIORES Y EXTERIORES

06.11.02

PINTURA LATEX EN CIELO RASO

06.11.03

07

factor

PINTURA ANTICORR. Y ESMALTE EN PTAS/VENTANAS

2.00 6.00

2.00 6.00

INSTALACIONES SANITARIAS

07.01

SERVICIOS HIGIENICOS

07.01.01

EXCAVACION DE ZANJAS

PLANILLA DE METRADOS Presupuestos Lugar

“CONSTRUCCION DE PARQUE Y AREA DEPORTIVA EN LA ASOCIACION DE VIVIENDA LAS VIÑAS I, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA” JUNTA VECINAL LAS VIÑAS, DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA – TACNA – TACNA

DESCRIPCION

Nº PARTIDA

Nº DE VECES

CANT.

DIMENCIONES (M) LARGO

ANCHO

ALTO

TOTAL

UND

PARCIAL

2.01

m3

LAVATORIO DE PARED DE COLOR 1 LLAVE

2.00 3.00

2.00 3.00

2.00 3.00

pza pza

INSTALACION DE APARATOS SANITARIOS

5.00

5.00

5.00

und

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

7.00 2.00

7.00 2.00

7.00 2.00

pto pto

TUBERIA DE DESAGUE PVC-SAL 2"

2.00 14.00

2.00 14.00

2.00 14.00

pto m

07.01.10

RED DE DESAGUE PVC-SAL 4"

12.30

12.30

12.30

m

07.01.11

RED COLECTORA PVC 6"

07.01.12

SUMIDEROS DE 2"

10.00 2.00

10.00 2.00

10.00 2.00

m pza

07.01.13

REGISTROS DE BRONCE DE 4"

07.01.14

CAJA DE REGISTRO DE DESAGUE 12" X 24"

2.00 1.00

2.00 1.00

2.00 1.00

pza pza

07.01.15

SALIDA DE AGUA FRIA Ø 1/2"

11.00

11.00

11.00

pto

07.01.16

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

07.01.17

LLAVE DE PASO DE 1/2"

24.40 2.00

24.40 2.00

24.40 2.00

m und

07.01.18

CONEXION EXTERIOR A RED DE AGUA

07.01.19

CONEXION EXTERIOR A RED DE DESAGUE

1.00 1.00

1.00 1.00

1.00 1.00

GLB GLB

41.19 39.86

m3 m3

5.00 85.00

und m

39.00 9.00 27.00

m3 m3 m3

8.00 8.00 8.00

3.00 2.43 8.00 8.00 8.00

m3 m3 und und und

22.00 21.00 100.00 8.00 100.00

22.00 21.00 100.00 8.00 100.00

22.00 21.00 100.00 8.00 100.00

m m m und m

12.00 400.00 8.00 4.00 10.00 5.00 5.00 1.00

12.00 400.00 8.00 4.00 10.00 5.00 5.00 1.00

12.00 400.00 8.00 4.00 10.00 5.00 5.00 1.00

und und und rll m m und und

1.00

1.00

1.00

jgo

4.00 4.00 60.00 82.00 4.00 82.00 8.00 328.00 4.00 4.00 5.00 5.00 1.00 1.00 8.00 4.00

31.98 7.38 22.14 2.46 3.84 4.00 4.00 60.00 82.00 4.00 82.00 8.00 328.00 4.00 4.00 5.00 5.00 1.00 1.00 8.00 4.00

m3 m3 m3 m3 m3 und und m m und m und und und rll m und und jgo und und

4.00 1.00

4.00 1.00

4.00 1.00

pto GLB

23.00

23.00

23.00

07.01.02

RELLENO CON MATERIAL PROPIO

07.01.03

INODORO TANQUE BAJO BLANCO INC/ACCES.

07.01.04 07.01.05 07.01.06 07.01.07

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

07.01.08

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

07.01.09

07.02

PLAZA

07.02.01

EXCAVACION DE ZANJAS

07.02.02

RELLENO CON MATERIAL PROPIO

07.02.03

GRIFO DE RIEGO

07.02.04

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

08

PLAZA

08.01.01

EXCAVACION DE ZANJAS

08.01.02

RELLENO CON ARENA FINA

08.01.03

RELLENO CON MATERIAL PROPIO

08.01.04

ELIMINACION DE MATERIAL DESMONTE

08.01.05

CONCRETO P/POSTE

08.01.06

POSTE METALICA DE 5.00 MTS

08.01.07

FAROLA ESFERICA E-44

08.01.08

CORTACIRCUITO BIPOLAR

08.01.09

CONDUCTOR NLT 2X4MM2.

08.01.10

CONDUCTOR DE 2 X 1 X 10 MM2 NYY

08.01.11

CONDUCTOR DE 2 X 1 X 6 MM2 NYY

08.01.12

EMPALME SUBTERRANEO P/C 6 Y 10 MM2

08.01.13

CINTA SEÑALIZADORA

08.01.14

CONECTOR DE COBRE

08.01.15

LADRILLO

08.01.16

DUCTO DE CONCRETO DOS VIAS

08.01.17

CINTA AISLANTE

08.01.18

TUBO DE FIERRO GALVANIZADO 5.00 MTS. X 2"

08.01.19

CINTA BAN-DIT 1/2"

08.01.20

PRESILLA 1/2"

08.01.21

POZO-CONEXION A TIERRA TABLERO DE DISTRIBUCION P/4 CIRCUITOS

08.02

LOSA DEPORTIVA

08.02.01

EXCAVACION DE ZANJAS

08.02.02

RELLENO CON ARENA FINA

08.02.03

RELLENO CON MATERIAL PROPIO

08.02.04

ELIMINACION DE MATERIAL DESMONTE

08.02.05

CONCRETO P/POSTE

08.02.06

POSTE DE C.A.C 11/200

08.02.07

CORTACIRCUITO BIPOLAR

08.02.08

CONDUCTOR NLT 2X4MM2.

08.02.09

CONDUCTOR DE 2 X 1 X 6 MM2 NYY

08.02.10

EMPALME SUBTERRANEO P/C 6 Y 10 MM2

08.02.11

CINTA SEÑALIZADORA

08.02.12

CONECTOR DE COBRE

08.02.13

LADRILLO

08.02.14

DUCTO DE CONCRETO DOS VIAS

08.02.15

CINTA AISLANTE

08.02.16

CINTA BAN-DIT 1/2"

08.02.17

PRESILLA 1/2"

08.02.18

POZO-CONEXION A TIERRA

08.02.19

5.00 85.00

INSTALACIONES ELECTRICAS

08.01

08.01.22

5.00 85.00

TABLERO DE DISTRIBUCION P/4 CIRCUITOS

08.02.20

REFLECTORES DE 400 WATTS VAPOR DE SODIO

08.02.21

CRUCETA METALICA DE FºGº DE 2"X2"X1/4" X 0.80

8.03

SERVICIOS HIGIENICOS

08.03.01

SALIDA PARA CENTROS DE LUZ

08.03.02

ACOMETIDA SUBTERRANEA - MONOFASICA

08.03.03

CONDUCTOR ELECTRICO 2 x 2.5 MM2 TW

3.00 8.00 8.00 8.00

3.00

0.19

2.46 4.00 4.00 60.00 82.00 4.00 82.00 8.00 328.00 4.00 4.00 5.00 5.00 1.00 1.00 8.00 4.00

2.46 0.96

m