Página

S10

1

Presupuesto Presupuesto Cliente Lugar

Item Metrado

01 01.01 01.01.01 01.01.02 01.01.03 01.01.04 01.02 01.02.01

0501011

"MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE EDUCACION PRIMARIA EN LA INSTITUCION EDUCATIVA N° 16745 TUTINO, DISTRITO DE EL CENEPA - PROVINCIA DE CONDORCANQUI - AMAZONAS" Costo al GERENCIA SUBCC.NN. REGIONAL CONDORCANQUI AMAZONAS Descripción - NIEVA Und. Precio S/. CONDORCANQUI

214,271.54

OBRAS PROVICIONES Y SEGURIDAD EN OBRA OBRAS PROVISIONALES CASETA PARA ALMACEN,OFICINA Y GUARDIANIA

09/07/201 8 Parcial S/.

197,302.31 m2

45.00

105.29

4,738.05 1,053.52

CARTEL DE IDENTIFICACION DE OBRA 3.60X2.40M

GLB

1.00

1,053.52

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

est

1.00

3,000.00

3,000.00

FLETES

GLB

1.00

180,039.22

180,039.22

GLB

1.00

2,000.00

SEGURIDAD Y SALUD EN OBRA ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD EN OBRA

8,478.37 2,000.00

01.02.02

EQUIPOS DE PROTECCION PERSONAL

und

40.00

135.00

5,400.00

01.02.03

SEÑALIZACION PARA SEGURIDAD EN OBRA

GLB

1.00

1,078.37

1,078.37

m2

67.72

13.15

PICADO DE PISOS EXISTENTES

m2

173.74

10.52

1,827.74

DESMONTAJE DE COBERTURA DE CALAMINA

m2

499.92

6.57

3,284.47

DESMONTAJE DE CORREAS DE MADERA

m

70.00

9.27

648.90

DESMONTAJE DE PUERTAS Y VENTANAS

und

18.00

12.71

228.78

DESMONTAJE DE TIJERALES DE MADERA

und

15.00

19.15

287.25

ELIMINACION DE MATERIAL EXCEDENTE (50 M )

m3

120.73

10.96

1,323.20

01.03 01.03.01 01.03.02 01.03.03 01.03.04 01.03.05 01.03.06 01.03.07 02 02.01 02.01.01 02.01.02 02.02 02.02.01 02.02.02 02.02.03 02.02.04 02.02.05 02.02.06 02.02.07 02.02.08 02.02.09 02.02.10 02.03 02.03.01 02.03.01.01 02.03.02 02.03.02.01 02.03.03 02.03.03.01 02.03.03.02 02.03.04 02.03.04.01 02.03.04.02 02.03.04.03 02.03.04.04 02.03.05 02.03.05.01 02.03.05.02

DESMONTAJE Y DEMOLICIONES DEMOLICION DE VEREDAS

ESTRUCTURAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL

8,490.86 890.52

1,246,745.64 m2

2,333.65

2.63

12,134.98 6,137.50

m2

2,333.65

2.57

5,997.48

m3

223.01

37.57

148,779.13 8,378.49

EXCAVACION MANUAL PARA ZAPATAS

m3

270.55

37.57

10,164.56

EXCAVACION MANUAL PARA VIGAS DE CONEXION

m3

17.00

37.57

638.69

EXCAVACION MANUAL PARA CANALETA DESAGUE PLUVIAL

m3

35.35

26.82

948.09

EXCAVACION MANUAL PARA VEREDAS

m3

652.82

26.82

17,508.63

RELLENO CON AFIRMADO COMPACTADO PARA PISOS Y VEREDAS

m3

362.23

195.07

70,660.21

RELLENO CON AFIRMADO Y/O MAT. GRANULAR PARA ESTRUCTURAS

m3

84.18

195.07

16,420.99

RELLENO CON MATERIAL PROPIO

m3

111.34

21.28

2,369.32

NIVELACION INTERIOR Y APISONADO

m2

2,186.53

3.01

6,581.46

ELIMINACION DE MATERIAL EXCEDENTE (50 M )

m3

1,378.53

10.96

15,108.69

TRAZO Y REPLANTEO MOVIMIENTO DE TIERRAS EXCAVACION MANUAL PARA CIMIENTO CORRIDO

OBRAS DE CONCRETO SIMPLE

132,461.34

CIMIENTO CORRIDO CONCRETO 1:10 + 30% P. G. PARA CIMIENTOS CORRIDOS

m3

123.93

323.32

40,069.05 40,069.05

SOLADO SOLADO DE 4" MEZCLA 1:12 CEMENTO - HORMIGON

m2

196.07

47.22

9,258.43 9,258.43

SOBRECIMIENTO CONCRETO EN S/CIMIENTOS F'C=140 KG/CM2. 1:8, C:H + 25% P.M.

m3

17.32

486.31

16,179.63 8,422.89

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

m2

231.96

33.44

7,756.74

PISOS Y PAVIMENTOS CONCRETO F'C=140 KG/CM2.EN FALSO PISO, E=10CM

m3

41.64

445.47

54,299.58 18,549.37

VEREDA RIGIDA DE CONCRETO F'C=175 KG/CM2 E=10CM PASTA 1:12, INCLUYE UÑA

m2

488.96

48.75

23,836.80

ENCOFRADO Y DESENCOFRADO DE VEREDAS JUNTAS DE DILATACION EN PISOS Y VEREDAS CON TECNOPORT Y SELLADO CON MEZCLA ASFALTICAS E=1"

m2 m

69.11 1,290.80

28.38 7.71

1,961.34 9,952.07

CANALETAS CONCRETO F'C=175 KG/CM2 P' CANALETA DESAGUE PLUVIAL

m3

16.83

504.31

12,077.59 8,487.54

ENCOF. Y DESENCOF. DE CANALETA P' DESAGUE PLUVIAL

m2

107.68

33.34

3,590.05

Item Metrado 02.03.06 02.03.06.01 02.03.06.02 02.04 02.04.01 02.04.01.01 02.04.01.02 02.04.02 02.04.02.01 02.04.02.02 02.04.02.03 02.04.03 02.04.03.01 02.04.03.02 02.04.03.03 02.04.04 02.04.04.01 02.04.04.02 02.04.04.03 02.04.05 02.04.05.01 02.04.05.02 02.04.05.03 02.04.06 02.04.06.01 02.04.06.01.01 02.04.06.01.02 02.04.06.01.03 02.04.06.01.04 02.04.06.01.05 02.04.06.02 02.04.06.02.01 02.04.06.02.02 02.04.06.02.03 02.04.07 02.04.07.01 02.04.07.02 02.04.07.03 02.04.08 02.04.08.01 02.04.08.02 02.04.08.03 02.04.09 02.04.09.01 02.04.09.02 02.04.09.03 02.04.10

Descripción DADOS DADOS DE CONCRETO F'C=140 KG/CM2.PARA PROTECCION DE TUB. ENCOFRADO Y DESENCOFRADO DE DADOS DE PROTECCION

Und.

Precio S/.

Parcial S/. 577.06

m3

0.60

464.22

278.53

m2

9.00

33.17

298.53

OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO EN ZAPATAS F'C= 210 KG/CM2

874,612.48 m3

99.48

569.16

73,237.54 56,620.04

kg

2,584.37

6.43

16,617.50

m3

96.35

589.25

ACERO Fy=4200 Kg/cm2 EN VIGAS DE CIMENTACION

kg

7,080.95

6.43

45,530.51

ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION

m2

608.32

38.58

23,468.99

m3

16.59

579.64

ACERO Fy=4200 Kg/cm2 EN SOBRECIMIESTOS

kg

1,925.01

6.43

12,377.81

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS ARMADOS

m2

181.16

33.58

6,083.35

m3

86.18

644.00

203,629.78 55,499.92

ACERO Fy=4200 Kg/cm2 EN COLUMNAS

kg

15,806.35

6.43

101,634.83

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

1,233.29

37.70

46,495.03

m3

96.59

620.85

163,424.18 59,967.90

ACERO Fy' = 4200 Kg/Cm2 EN VIGAS

kg

12,003.65

6.43

77,183.47

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

693.58

37.88

26,272.81

ACERO Fy =4200 Kg/cm2 EN ZAPATAS VIGAS EN CIMENTACION CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2

SOBRECIMIENTO ARMADO CONCRETO EN SOBRECIMIENTOS F'C=210 kg/cm2

COLUMNAS CONCRETO EN COLUMNAS F'C=210 KG/CM2

VIGAS CONCRETO EN VIGAS F'C=210 KG/CM2

LOSAS LOSAS ALIGERADAS CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2

125,773.74 56,774.24

28,077.39 9,616.23

249,061.16 82.80

ACERO Fy' = 4200 Kg/Cm2 EN LOSA ALIGERADA

kg

7,431.89

6.43

47,787.05

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

m2

946.32

40.74

38,553.08

LADRILLO HUECO MAQUINADO 15X30X30 CM PARA LOSA ALIGERADO

und

3,026.00

2.95

8,926.70

und

1,340.00

8.47

11,349.80

PLANCHA DE TEKNOPORT DE 1.20X0.15*0.30 M PARA TECHO ALIGERADO A DOS AGUAS

674.44

162,460.26 55,843.63

m3

86,600.90

LOSAS MACISAS CONCRETO F'C=175 KG/CM2 PARA LOSA

m3

130.72

493.12

64,460.65

ACERO Fy' = 4200 Kg/Cm2 EN LOSA

kg

3,003.67

6.43

19,313.60

ENCOFRADO Y DESENCOFRADO DE LOSA

m2

99.60

28.38

2,826.65

GARGOLAS CONCRETO EN GARGOLAS F'C=175 KG/CM2

m3

0.19

590.69

ACERO Fy=4200 Kg/cm2 EN GARGOLAS

kg

6.30

6.43

40.51

ENCOFRADO Y DESENCOFRADO EN GARGOLAS

m2

4.09

37.70

154.19

ESCALERA CONCRETO F'C=210 KG/CM2. PARA ESCALERAS

m3

10.14

618.81

15,959.21 6,274.73

ACERO Fy=4200 Kg/cm2 EN ESCALERAS

kg

1,144.13

6.43

7,356.76

ENCOFRADO Y DESENCOFRADO EN ESCALERAS

m2

45.41

51.26

2,327.72

m3

0.35

643.88

707.27 225.36

ACERO Fy' = 4200 Kg/Cm2 EN PANTALLA DE INGRESO

kg

17.78

6.43

114.33

ENCOFRADO Y DESENCOFRADO EN PANTALLA

m2

4.81

76.42

367.58

PANTALLAS CONCRETO EN PANTALLA FC=210 KG/CM2

MUROS, PISOS Y PAVIMENTOS

306.93 112.23

14,435.28

02.04.10.01 02.04.10.02 01

ACERO Fy' = 4200 Kg/Cm2 EN MUROS DE SOGA

kg

398.75

6.43

2,563.96

ACERO Fy' = 4200 Kg/Cm2 EN PISOS Y PAVIMENTOS

kg

1,846.24

6.43

11,871.32

ARQUITECTURA

995,472.69

Item Metrado 01.01 01.01.01 01.01.02 01.02 01.02.01 01.02.02 01.02.03 01.02.04 01.02.05 01.02.06 01.02.07 01.02.08 01.02.09 01.02.10 01.02.11 01.03 01.03.01 01.03.02 01.04 01.04.01

01.04.02 01.05

Descripción MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KING-KONG TIPO IV, DE SOGA MURO DE LADRILLO KING-KONG TIPO IV, DE CABEZA REVOQUES Y ENLUCIDOS TARRAJEO PRIMARIO CON CEMENTO-ARENA=1:4, E=1.5 CM

Und.

Precio S/.

Parcial S/. 74,061.15

m2

481.09

73.37

35,297.57

m2

358.06

108.26

38,763.58

m2

105.78

20.33

134,679.68 2,150.51

TARRAJEO EN INTERIORES CON CEMENTO - ARENA = 1:4, E=1.5CM

m2

927.61

26.87

24,924.88

TARRAJEO EN EXTERIORES CON CEMENTO-ARENA = 1:4, E= 1.5CM

m2

1,008.27

29.13

29,370.91

TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA

m2

1,032.12

37.34

38,539.36

TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA

m2

561.91

40.71

22,875.36

TARRAJEO1:3 EN CANALETAS DESAGUE PLUVIAL

m2

138.95

30.97

4,303.28

TARRAJEO DE GARGOLAS

m2

1.36

37.35

50.80

TARRAJEO DE DADOS DE PROTECCION

m2

7.20

34.26

246.67

VESTIDURAS DE DERRAMES (ANCHO = 15 CM)

m

207.26

12.61

2,613.55

BRUÑAS EN MUROS

m

1,461.34

4.50

6,576.03

JUNTA DE CONSTRUCCION CON TEKNOPORT

m

345.70

8.76

3,028.33

m2

418.07

44.24

96,152.16 18,495.42

m2

770.71

100.76

m2

806.20

46.23

m2

68.50

73.32

CIELORRASOS CIELORRASOS CON MEZCLA DE CEMENTO-ARENA = 1:4 CIELO RASO CON MADERA MACHIEMBRADA PISOS Y PAVIMENTOS PISO DE 2" CONCRETO F'C = 140 KG/CM2 + PULIDO, COLOREADO Y BRUÑADO

PISO DE CERAMICO ANTIDESLIZANTE 30cm X 30cm

77,656.74 42,293.05 37,270.63

5,022.42 15,780.38

ZOCALOS Y CONTRAZOCALOS

01.05.01

CONTRAZOCALO DE CEMENTO PULIDO, H= 0.20M, INTERIORES

m

300.83

12.97

3,901.77

01.05.02

CONTRAZOCALO DE CEMENTO PULIDO, H= 0.30M. EXTERIORES

m

271.45

16.10

4,370.35

01.05.03

ZOCALO DE CERAMICO 20x30 COLOR BLANCO

m2

105.78

70.98

01.06 01.06.01

COBERTURA CON TEJA GRANADA

m2

01.06.02

CUMBRERA CON TEJA GRANADA

m

01.07

7,508.26 72,742.07

COBERTURA 1,101.17

61.64

113.85

42.74

67,876.12 4,865.95 44,275.80

ESTRUCTURAS DE MADERA

01.07.01

TIJERAL DE MADERA DE 2 1/2" x 6" - L= 09.80 M

und

11.00

979.82

10,778.02

01.07.02

CORREAS DE MADERA 2"x3"

m

1,800.70

17.59

31,674.31

01.07.03

ARRIOSTRAMIENTO ENTRE TIJERALES CON MADERA DE 2 1/2"x 4"

m

60.28

30.25

01.08

1,823.47 20,023.69

CARPINTERIA DE MADERA

01.08.01

PUERTA DE MADERA

m2

11.90

565.90

6,734.21

01.08.02

VENTANAS BAJAS CON MARCO DE MADERA

m2

30.00

139.97

4,199.10

01.08.03

VENTANA DE MADERA CON MALLA MOSQUITERO

m2

31.20

129.73

4,047.58

01.08.04

FRISO DE MADERA DE 1x12"

m

75.90

66.44

01.09 01.09.01 01.10

TABIQUERIA DE MADERA MACHIHEMBRADA

5,042.80 1,099.44

TABIQUES m2

10.80

101.80

1,099.44 307,672.3 4 22,470.95

CARPINTERIA METALICA

01.10.01

PUERTA METALICA

m2

49.72

451.95

01.10.02

PUERTA DE PLANCHA METALICA

m2

17.28

265.16

4,581.96

01.10.03

VENTANA METALICA

m2

201.58

194.83

39,273.83

01.10.04

CANALETA GALVANIZADA DE 6" P' DESAGUE PLUVIAL

m

172.20

44.14

7,600.91

01.10.05

REJILLA METALICA PARA DRENAJE PLUVIAL

m

235.75

94.42

22,259.52

01.10.06

BARANDA DE TUBO GALVANIZADO DE 2"

m

11.00

92.14

1,013.54

01.10.07

MALLA GALVANIZADA # 12 C/TUBERIA DE 2" (INC. COLOCACION)

m2

1,194.52

168.68

201,491.63

01.10.08

PUERTA METALICA DE INGRESO PRINCIPAL Y SECUNDARIA

m2

10.40

350.00

3,640.00

01.10.09

GUIAS DE METAL PARA RUEDA DE PUERTA

m

4.60

120.00

552.00

01.10.10

ARCOS METALICOS Y TABLERO DE BASQUET

und

2.00

1,500.00

3,000.00

Item Metrado 01.10.11

Descripción

Und.

Precio S/.

Parcial S/.

SOPORTES METÁLICOS P/NET DE VOLEYBOL

und

1.00

250.00

250.00

ASTA METALICA PARA BANDERA

und

2.00

769.00

1,538.00

91.00

19.49

3,924.06 1,773.59

23.00

90.63

2,084.49

1.00

65.98

65.98

p2

2,906.23

6.66

19,355.49

m2

1,117.63

13.48

89,091.41 15,065.65

01.10.12 01.11

CERRAJERIA

01.11.01

BISAGRA DE FIERRO PARA PUERTAS

und

01.11.02

CERRADURA PARA PUERTA EXTERIOR

und

01.11.03

CERRADURA PARA PUERTA INTERIOR

01.12 19,355.49 01.12.01 01.13 01.13.01 01.13.02 01.13.03 01.13.04 01.13.05 01.13.06 01.13.07 01.13.08 01.13.09 01.14 01.14.01 01.14.02 01.14.03 01 01.01 01.01.01 01.01.02 01.02 14,437.75 01.02.01 01.02.02 01.02.03 01.02.04 01.02.05 01.03 6,103.86 01.03.01 01.03.02 01.03.03 01.03.04 01.03.05 01.03.06 01.04 4,944.41 01.04.01 01.04.02 01.04.03 01.04.04

und

VIDRIOS, CRISTALES Y SIMILARES VIDRIOS SEMIDOBLES PINTURA PINTURA LATEX EN INTERIORES PINTURA AL OLEOMATE EN EXTERIORES

m2

884.80

11.98

10,599.90

PINTURA LATEX EN CIELORRASO

m2

1,188.77

12.08

14,360.34

PINTURA LATEX EN VIGAS Y COLUMNAS

m2

1,924.00

12.63

24,300.12

PINTURA ESMALTE EN CONTRAZOCALOS

m2

154.38

13.23

2,042.45

PINTURA EN PUERTAS Y VENTANAS C/BARNIZ

m2

135.00

18.99

2,563.65

PINTURA EN TABIQUERIA DE MADERA C/BARNIZ

m2

21.60

13.41

289.66

m2

2,389.04

7.11

16,986.07

347.00

8.31

2,883.57 11,906.55 9,886.55

PINTURA ANTICORROSIVA Y ESMALTE SINTETICO EN ESTRUCT. METALICAS PINTURA EN LOSA DEPORTIVA C/ESMALTE SINTETICO VARIOS AREAS VERDES

m m2

1,262.65

7.83

TACHO METALICO PARA BASURA INCL/ INSTALACION

und

6.00

170.00

1,020.00

BANCA DE MADERA

und

4.00

250.00

1,000.00

INSTALACIONES SANITARIAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL

63,087.23 m

324.70

1.49

814.99 483.80

m

324.70

1.02

331.19

EXCAVACION MANUAL EN TERRENO NORMAL

m3

135.79

37.57

5,101.63

NIVELACION INTERIOR Y APISONADO

m2

98.05

3.01

295.13

RELLENO CON MATERIAL PROPIO

m3

90.58

21.28

1,927.54

RELLENO CON MATERIAL PRESTAMO FILTRANTE DE 1" - 2"

m3

32.40

195.07

6,320.27

ELIMINACION DE MATERIAL EXCEDENTE (50 M )

m3

72.37

10.96

793.18

INODORO TANQUE BAJO BLANCO

und

11.00

311.69

3,428.59

LAVATORIO DE PARED BLANCO 1 LLAVE

und

10.00

116.12

1,161.20

LAVATORIO METALICO PARA MESA, 2 LLAVES P/EMPOTRAR

und

1.00

381.69

381.69

TRAZO Y REPLANTEO MOVIMIENTO DE TIERRAS

APARATOS Y ACCESORIOS SANITARIOS

PAPELERA DE LOSA DE 15X15

und

11.00

47.56

523.16

DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS

und

1.00

119.96

119.96

URINARIO CORRIDO CON MAYOLICA

und

1.00

489.26

489.26

SALIDA DE AGUA FRIA PVC SAP 1/2"

pto

24.00

89.86

2,156.64

TUBERIA PVC SAP CLASE 10, DE 1/2"

m

64.34

7.24

465.82

TUBERIA PVC SAP CLASE 10, DE 3/4"

m

123.83

7.69

952.25

CODO 90° PVC-SAP 3/4"

und

3.00

13.61

40.83

INSTALACION DE REDES DE AGUA

01.04.05

01.04.06 01.04.07 01.04.08 01.04.09

TEE PVC SAP 3/4" REDUCCION PVC SAP DE 3/4" A 1/2"

und

VALVULA COMPUERTA DE BRONCE DE 1/2"

und

CAJA DE REGISTRO DE 12" X 16" DE CONCRETO

und

PRUEBA HIDRAULICA DE HERMETICIDAD Y DESINFECCCION DE TUBERIA 01.05 8,990.77

und

INSTALACION DE REDES DE DESAGUE

GLB

1.00

13.73

2.00

14.61

13.73 29.22

6.00

89.91

539.46

2.00

139.85

279.70

1.00

466.76

466.76

Item Metrado

Descripción

Und.

7.00

47.14

329.98

12.00

79.14

949.68

11.00

124.69

1,371.59

2.00

88.02

176.04

2.00

16.66

33.32

56.36

11.09

625.03

172.86

17.39

3,006.04

2.00

27.84

55.68

21.00

37.34

784.14

17.00

29.84

507.28

5.00

185.01

925.05

2.00

4,751.33

9,502.66

5.00

659.18

3,295.90

120.00

11.09

1,330.80

m

139.65

1.49

350.52 208.08

m

139.65

1.02

142.44

EXCAVACION MANUAL EN TERRENO NORMAL

m3

57.50

37.57

2,160.28

RELLENO CON MATERIAL PROPIO

m3

50.91

21.28

1,083.36

SALIDA PARA CENTROS DE LUZ EN TECHO

pto

114.00

31.76

3,620.64

SALIDA PARA TOMACORRIENTES

pto

76.00

30.66

2,330.16

SUMIDERO DE 2"

und

01.05.02

REGISTRO DE BRONCE DE 4"

und

01.05.03

SALIDA DE DESAGUE EN PVC DE 2"

pto

01.05.04

SALIDA DE DESAGUE EN PVC 4"

pto

01.05.05

SALIDAS PARA VENTILACION DE PVC DE 2"

pto

01.05.06

SOMBRERO PARA VENTILACION DE P.V.C. DE 2"

und

01.05.07

TUBERIA PVC SAL 2"

m

01.05.08

TUBERIA PVC SAL 4"

m

01.05.09

YEE PVC SAL 2"x2"

und

01.05.10

YEE PVC SAL 4"x4"

und

01.05.11

YEE PVC SAL 4"x2"

und

01.05.12

CAJA DE REGISTRO DE DESAGUE 12" X 24"

pza

01.06.01

SUMINISTRO E INSTALACION DE BIODIGESTOR DE 3,000 LT

und

CAJA DE DE LODOS Y DISTRIBUCION (1.00x1.00x0.60m)

und

01.06.03

TUBERIA PVC SAL PERFORADA DE 2"

m

01.01 01.01.01 01.01.02 01.02 3,243.64 01.02.01 01.02.02 01.03 5,950.80 01.03.01 01.03.02 01.04 11,445.72 01.04.01

INSTALACIONES ELECTRICAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO MOVIMIENTO DE TIERRAS

SALIDA PARA ALUMBRADO Y TOMACORRIENTES

CANALIZACIONES, CONDUCTOS O TUBERIAS TUBERIA DE 35 mm PVC SAP

m

01.04.02

TUBERIA DE 25 mm PVC SAP

m

01.04.03

TUBERIA DE 20 mm PVC SAP

m

01.05 14,024.09 01.05.01

m

01.05.02

CONDUCTOR ELECTRICO 2-1x2.5 mm2 TW

m

01.05.03

CONDUCTOR ELECTRICO 2 x 4 mm2 TW + 2.5 mm2 TW

m

CONDUCTOR 1x16 mm2

m

01.06 01.06.01 01.06.02 01.06.03 01.06.04 01.06.05 01.06.06 01.06.07 01.06.08

520.86

5.59

2,911.61

123.40

11.15

1,375.91

818.08

8.75

7,158.20

530.76

13.56

7,197.11

536.35

4.85

2,601.30

365.61

7.54

2,756.70

117.05

12.55

1,468.98

CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS CONDUCTOR ELECTRICO 2-1x10 mm2 THW + 1x4 mm2 THW

01.05.04

226.94

INSTALACION DE REDES DE DESAGUE

01.06.02

01 94,587.75

Parcial S/. 32.42

01.05.01

01.06 14,129.36

Precio S/. 7.00

TABLEROS TABLERO DE DISTRIBUCION, TD 01.

und

2.00

534.90

5,039.10 1,069.80

TABLERO DE DISTRIBUCION, TD 02.

und

1.00

534.90

534.90

TABLERO DE DISTRIBUCION, TD 03.

und

1.00

534.90

534.90

TABLERO DE DISTRIBUCION, TD 04.

und

1.00

804.90

804.90

TABLERO DE DISTRIBUCION, TD 05.

und

1.00

534.90

534.90

TABLERO DE DISTRIBUCION, TD 06.

und

1.00

534.90

534.90

TABLERO DE DISTRIBUCION, TD 07.

und

1.00

489.90

489.90

TABLERO DE DISTRIBUCION, TD 08.

und

1.00

534.90

534.90

01.07 7,292.88 01.07.01 01.08 17,304.50 01.08.01

SISTEMA DE PUESTA A TIERRA SUM. E INST. DE POZO PUESTA A TIERRA

und

607.74

7,292.88

74.00

85.56

6,331.44

42.00

70.56

2,963.52

15.00

31.98

479.70

23.00

34.48

793.04

ARTEFACTOS, INTERRUPTORES, TOMACORRIENTES Y EQUIPOS SUM. E INST. ARTEF. TIPO P/ADOSAR, CON DOS LAMP. FLUORESC. DE 40 W

pto

01.08.02

SUM. E INST. ARTEF. TIPO P/ADOSAR, FLUORESC. CIRCULAR DE 32 W

01.08.03

INTERRUPTOR BIPOLAR SIMPLE

und

INTERRUPTOR BIPOLAR DOBLE

und

01.08.04

12.00

pto

Item Metrado

Descripción

Und.

01.08.05

INTERRUPTOR BIPOLAR TRIPLE

01.08.06

TOMACORRIENTE DOBLE

und

01.08.07

SUMIN. E INST. DE PARARRAYO

und

01.08.08

CAJA DE CONCRETO ARMADO F'C=175 KG/CM2 DE 1.00x1.00x1.00 m

und

01.09

und

SUMIN. DE EQUIPO FOTOVOLTAICO

GLB

01.09.02

MONTAJE E INSTALACION DE EQUIPO FOTOVOLTAICO

GLB

01.09.03

SISTEMA DE RESPALDO

GLB

01.10.01 01 165,875.50 01.01 01.01.01 01.01.01.01 01.01.01.02 01.01.01.03 01.01.01.04

PRUEBAS PRUEBAS ELECTRICAS

GLB

MESA PARA ESTUDIANTE SILLA PARA ESTUDIANTE ESCRITORIO PARA DOCENTE SILLA PARA DOCENTE

und und und und

PIZARRA ACRILICA

und

ESCRITORIO PARA DOCENTE

und

SILLA PARA DOCENTE

und

MESA DE REUNIONES SILLAS PLEGABLES

und und

01.02.01.05

ESTANTE DE MADERA

und

01.02.01.06

CAMILLA DE ATENCION EN TOPICO

und

01.02.01.07

PIZARRA ACRILICA

und

COMPUTADORA CON MONITOR DE 18.5"

und

01.02.02.02

IMPRESORA MULTIFUNCIONAL

und

01.02.02.03

TELEVISOR DE 32" FULL HD

und

01.02.02.04

BOTIQUIN DE PRIMEROS AUXILIOS

und

01.03.01.01 01.03.01.02 01.03.01.03 01.03.01.04 01.03.01.05 01.03.02 01.03.02.01 01.04 69,900.00 01.04.01 01.04.01.01

1,270.26

1.00

15,027.00

23,162.00 15,027.00

1.00

4,635.00

4,635.00

1.00

3,500.00

3,500.00

7.00

250.00

1,750.00 1,750.00

85.00

27,125.00 8,925.00

210.00

45.00

9,450.00

7.00

300.00

2,100.00

7.00

150.00

1,050.00

7.00

550.00

3,850.00

7.00

250.00

1,750.00

2.00

300.00

4,150.00 600.00

2.00

150.00

300.00

1.00

600.00

600.00

16.00

55.00

880.00

2.00

550.00

1,100.00

1.00

420.00

420.00

1.00

250.00

250.00

1.00

2,100.00

1.00

650.00

650.00

1.00

900.00

900.00

1.00

410.00

410.00

105.00

EQUIPAMIENTO

01.02.02.01

01.03.01

2,066.91

423.42

MOBILIARIO

01.02.01.02

01.03

2,066.91

3.00

AMBIENTES ADMINISTRATIVOS (DIRECCION, SALA DE PROF. Y TOPICO)

01.02.01.01

01.02.02

1.00

27,125.00

01.01.01.06

01.02.01.04

3,287.19

MOBILIARIO

und

01.02.01.03

41.61

AULAS PEDAGOGICAS

ESTANTE DE MADERA

01.02.01

112.44

79.00

EQUIPAMIENTO Y MOBILIARIO

01.01.01.05

01.02 8,210.00

Parcial S/.

37.48

SISTEMA FOTOVOLTAICO

01.09.01

01.10

Precio S/. 3.00

4,060.00 2,100.00

BIBLIOTECA MOBILIARIO ESCRITORIO PARA DOCENTE

10,890.00 und

1.00

300.00

8,790.00 300.00

SILLA PARA DOCENTE

und

1.00

150.00

150.00

MESA PARA BIBLIOTECA

und

6.00

500.00

3,000.00

SILLAS PLEGABLES

und

48.00

55.00

2,640.00

LIBRERO DE MADERA

und

6.00

450.00

2,700.00

und

1.00

2,100.00

EQUIPAMIENTO COMPUTADORA CON MONITOR DE 18.5"

2,100.00 2,100.00

SALA DE INNOVACION PEDAGOGICA MOBILIARIO 01.04.01.04

4,800.00 ESCRITORIO

PARA

01.04.01.02

und

SILLA

01.04.01.03

und

MESA

DOCENTE

PARA

DOCENTE

DE

COMPUTO

und

SILLAS

PLEGABLES und 01.04.02 01.04.02.01 01.05

1.00

300.00

300.00

1.00

150.00

150.00

30.00

90.00

2,700.00

EQUIPAMIENTO COMPUTADORA CON MONITOR DE 18.5"

SALA DE USOS MULTIPLES

und

30.00

55.00

31.00

2,100.00

1,650.00

65,100.00 65,100.00

7,175.00

Item Metrado 01.05.01 01.05.01.01 01.05.01.02 01.05.02 01.05.02.01 01.05.02.02 01.06 01.06.01 01.06.01.01 01.06.01.02 01.06.02 01.06.02.01 01.06.02.02 01.07 01.07.01 01 01.01 01.01.01

Descripción

4,425.00 1.00

300.00

300.00

SILLAS PLEGABLES

und

75.00

55.00

4,125.00

EQUIPAMIENTO EQUIPO DE SONIDO

und

1.00

750.00

und

1.00

2,000.00

PROYECTOR MULTIMEDIA

CAFETIN Y COCINA MOBILIARIO MESA CIRCULAR PARA CAFETIN

2,750.00 750.00 2,000.00

7,985.00 und

15.00

250.00

7,050.00 3,750.00

und

60.00

55.00

3,300.00

EQUIPAMIENTO COCINA

und

1.00

800.00

935.00 800.00

BALON DE GAS

und

1.00

135.00

135.00

GLB

1.00

7,838.50

SILLAS PLEGABLES

FLETE MOBILIARIO Y EQUPAMIENTO FLETE - MOBILIARIO Y EQUIPOS

MITIGACION AMBIENTAL

GESTION DE RESIDUOS

LETRINA SANITARIA PLAN DE CONTINGENCIA RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SEGURIDAD Y SALUD DURANTE EL TRABAJO

7,838.50 7,838.50

5,486.16

PLAN DE MANEJO AMBIENTAL

01.01.03

01.03

Parcial S/.

und

CHARLA DE SENSIBILIZACION

01.02.01

Precio S/.

MOBILIARIO MESA DE TRABAJO

01.01.02

01.02

Und.

GLB und und

GLB

1.00

950.00

6.00

166.00

996.00

2.00

750.00

1,500.00

1.00

610.00

610.00 610.00

1.00

335.16

1,430.16 335.16

500.00

2.19

PLAN DE CIERRE

01.03.01

DESMONTAJE DE INSTALACIONES PROVICIONALES

GLB

01.03.02

LIMPIEZA FINAL DE OBRA

m2

3,446.00 950.00

1,095.00

COSTO DIRECTO

2,795,116.51

Related Documents

Presupuesto 1
August 2019 5
Presupuesto(1)
May 2020 4
Presupuesto 1
May 2020 2
Presupuesto
May 2020 39
Presupuesto
June 2020 28
Presupuesto
May 2020 24

More Documents from ""

Dispensa.doc
November 2019 7
June 2020 8
789 (1).doc
April 2020 5
Balotario Construccion.docx
November 2019 26