Strictly confidential, for DIR REN use only
RUPTL PT PLN (PERSERO) 2018-2027
Jakarta, 22 Maret 2018 PT PLN (PERSERO)
Outline 1
Demand Forecast Tahun 2018-2027
2
Rasio Elektrifikasi per Provinsi 2018-2027
3
Pengembangan Infrastruktur Ketenagalistrikan per Regional : • Regional Sumatera • Regional Jawa, Bali dan Nusa Tenggara • Regional Kalimantan •
Regional Sulawesi
•
Regional Maluku dan Papua
4
Strategi Pengembangan Energi Baru Terbarukan
5
Fuel Mix
6
Program Listrik Perdesaan DIRREN
www.pln.co.id
| 3
Demand Forecast Tahun 2018-2027
DIRREN
www.pln.co.id
| 4
Perbandingan Proyeksi Kebutuhan Listrik Perbandingan Proyeksi Kebutuhan Tenaga Listrik (TWh) 900
Rata-Rata Pertumbuhan 10,1%
800
9,2%
700
TWh
600
8,3%
500 400
6,86%
300 200 100 RUKN 2008-2027 Draft RUKN 2015-2034 RUPTL 2017-2026 RUPTL 2018-2027
2015 260
2016 285
2017 312
2018 342
2019 376
2020 413
2021 454
2022 499
2023 549
2024 605
2025 667
2026 736
2027 813
239 201
262 218
287 235
315 254
347 276
382 302
420 329
462 357
508 386
559 417
616 450
654 483
693
201
214
224
239
256
276
297
317
337
359
382
407
434
DIRREN
www.pln.co.id
| 6
Prakiraan Kebutuhan Listrik 2018-2027 35 92
TWh TWh
11,2%
26 64
26 TWh TWhTWh TWh
35 78
TWhTWh
TWh
433 TWh
10,1% 8,5% KALIMANTAN
9,1%
SUMATERA
480
54
326 TWh
174 TWh
301
10,8% 11,7% 8,6%
8,6%
INDONESIA TIMUR
SULAWESI
TWh
234
239
TWh
TWh
10,5% 8,7% PAPUA
177 TWh
12,1% 9,4% MALUKU 9,9% 8,4% NUSA TENGGARA
2017 2026 2018 2027 6,86% 8,3% INDONESIA
Catatan: Biru : RUPTL 2017-2026 7,2% 6,1% Merah : RUPTL 2018-2027 (Skenario Tinggi Bappenas) JAWA - BALI DIRREN
www.pln.co.id
| 7
Rasio Elektrifikasi per Provinsi 2018-2027
DIRREN
www.pln.co.id
| 10
Target Rasio Elektrifikasi per Provinsi sesuai Draft RUKN 2015-2034 2020
2021
2022
2023
2024
2025
99.87 99.68 99.12 99.75 98.19 99.60 99.20 98.58 99.75 99.28 99.95 100.00 99.96 99.26 99.42 99.61 99.84 99.07 97.28 99.64 99.31 99.83 98.34 98.41 98.26 99.76 97.15 97.33 96.03 99.37 99.55 93.82 98.73
100.00 100.00 100.00 100.00 99.93 100.00 100.00 100.00 99.93 100.00 99.99 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 99.93 100.00 99.93 100.00 99.93 99.93 99.93 99.93 99.93 99.93 99.93 99.93
100.00 100.00 100.00 100.00 99.95 100.00 100.00 100.00 99.95 100.00 99.99 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 99.95 100.00 99.95 100.00 99.95 99.95 99.95 99.95 99.95 99.95 99.95 99.95
100.00 100.00 100.00 100.00 99.96 100.00 100.00 100.00 99.96 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 99.96 100.00 99.96 100.00 99.96 99.96 99.96 99.96 99.96 99.96 99.96 99.96
100.00 100.00 100.00 100.00 99.98 100.00 100.00 100.00 99.98 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 99.98 100.00 99.98 100.00 99.98 99.98 99.98 99.98 99.98 99.98 99.98 99.98
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
98.13
99.70
100.00
100.00 100.00 100.00 100.00
93.34
96.16
98.82
99.98
99.98
99.99
95.15
97.35
99.35
99.99
99.99
99.99
No.
PROVINSI
2015
2016
2017
2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Aceh Sumatera Utara Sumatera Barat Riau Kepulauan Riau Bengkulu Jambi Sumatera Selatan Kepulauan Bangka Belitung Lampung Banten DKI Jakarta Jawa Barat Jawa Tengah D. I. Yogyakarta Jawa Timur Bali Kalimantan Barat Kalimantan Tengah Kalimantan Selatan Kalimantan Timur & Kalimantan Utara Sulawesi Utara Gorontalo Sulawesi Tengah Sulawesi Barat Sulawesi Selatan Sulawesi Tenggara Nusa Tenggara Barat Nusa Tenggara Timur Maluku Maluku Utara Papua Papua Barat
94.25 93.15 83.82 87.59 78.60 86.67 84.30 80.59 97.00 84.79 94.78 99.66 88.87 90.59 85.64 86.74 88.13 83.50 72.75 86.91 90.92 88.42 79.11 79.90 78.65 88.01 72.36 73.45 65.60 85.64 92.70 52.36 81.81
95.94 95.02 87.24 90.38 82.88 89.62 87.64 84.55 98.21 88.05 96.38 99.72 91.45 92.89 88.76 89.67 90.84 86.98 78.02 89.82 93.16 91.07 83.32 83.96 82.94 90.73 77.68 78.59 72.05 88.75 94.63 61.02 85.56
97.41 96.68 90.45 92.97 86.95 92.36 90.78 88.30 99.22 91.10 97.76 99.77 93.83 94.97 91.67 92.40 93.33 90.25 83.08 92.52 95.19 93.50 87.32 87.82 87.01 93.23 82.79 83.52 78.29 91.65 96.36 69.46 89.09
Jawa-Bali
89.72
92.12
94.32
96.33
Luar Jawa-Bali
83.63
87.08
90.32
INDONESIA
87.35
90.15
92.75
2019
98.67 99.73 98.12 99.37 93.46 96.25 95.34 97.51 90.81 94.47 94.88 97.21 93.70 96.42 91.84 95.18 99.40 99.57 93.94 96.58 98.93 99.90 100.00 100.00 95.99 97.94 96.84 98.51 94.37 96.86 94.92 97.23 95.61 97.69 93.30 96.15 87.92 92.57 95.01 97.29 97.01 98.62 95.72 97.74 91.10 94.69 91.46 94.90 90.87 94.53 95.52 97.61 87.69 92.39 88.24 92.75 84.32 90.14 94.33 96.82 97.86 99.17 77.70 85.72 92.42 95.54
99.99
100.00
100.00 100.00
Mulai tahun 2025, rasio elektrifikasi untuk seluruh Indonesia ditargetkan telah mencapai 100%.
DIRREN
www.pln.co.id
| 11
Rasio Elektrifikasi per Provinsi RUPTL 2018-2027 [1/2] No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Provinsi Aceh Sumut Sumbar Riau Kepri Jambi Bengkulu Sumsel Babel Lampung Jabar DKI Banten Jateng DIY Jatim Bali
2018 97,4 98,9 93,5 95,3 85,1 88,9 96,9 93,0 100,0 94,0 100,0 100,0 100,0 98,9 94,9 95,5 100,0
2019 99,3 99,4 96,3 97,5 94,5 92,2 97,9 96,0 100,0 99,2 100,0 100,0 100,0 100,0 97,9 98,2 100,0
2020 99,9 99,7 99,1 99,8 98,2 96,0 99,0 99,1 100,0 99,8 100,0 100,0 100,0 100,0 100,0 99,8 100,0
2021 100,0 100,0 100,0 100,0 99,9 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
2022 100,0 100,0 100,0 100,0 99,9 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
2023 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
2024 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
PLN merencanakan rasio elektrifikasi untuk seluruh Indonesia mencapai 100% di tahun 2024 (lebih cepat disbanding draft RUKN 2015-2034).
2025 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
DIRREN
2026 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
2027 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
www.pln.co.id
| 12
Rasio Elektrifikasi per Provinsi RUPTL 2018-2027 [2/2] No. 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Provinsi NTB NTT Kalbar Kalsel Kalteng Kaltim Kaltara Sulut Sulteng Gorontalo Sulsel Sultra Sulbar Maluku Malut Papua Pabar Indonesia
2018 93,5 70,0 93,3 95,0 70,4 99,4 86,3 97,5 91,5 97,4 99,8 87,7 87,3 92,6 98,9 65,0 90,4 96,2
2019 97,5 77,0 96,1 97,3 81,1 99,6 90,5 99,0 94,9 98,4 99,9 90,2 89,4 94,8 99,2 77,7 93,6 98,0
2020 100,0 84,3 99,1 99,6 85,7 99,7 95,2 99,8 98,4 99,0 100,0 92,6 91,6 96,4 99,6 82,7 96,8 99,1
2021 100,0 90,1 100,0 100,0 89,9 100,0 100,0 99,9 99,9 100,0 100,0 95,1 93,7 98,2 99,9 87,7 98,1 99,6
2022 100,0 96,0 100,0 100,0 93,9 100,0 100,0 100,0 100,0 100,0 100,0 97,5 95,8 100,0 100,0 92,7 98,1 99,8
2023 100,0 99,9 100,0 100,0 97,8 100,0 100,0 100,0 100,0 100,0 100,0 100,0 97,9 100,0 100,0 97,7 98,2 99,9
2024 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
PLN merencanakan rasio elektrifikasi untuk seluruh Indonesia mencapai 100% di tahun 2024 (lebih cepat disbanding draft RUKN 2015-2034).
2025
2026
100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 DIRREN
100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
2027 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
www.pln.co.id
| 13
Pengembangan Infrastruktur Ketenagalistrikan per Regional
DIRREN
www.pln.co.id
| 14
Pengembangan Infrastruktur Ketenagalistrikan REGIONAL KALIMANTAN Pembangkit
4.599 MW
Transmisi
10.430 kms
Gardu Induk
5.810 MVA
REGIONAL SULAWESI Pembangkit
4.849 MW
Transmisi
8.269 kms
Gardu Induk
7.043 MVA
REGIONAL MALUKU & PAPUA Pembangkit
1.540 MW
Transmisi
2.599 kms
Gardu Induk
1.920 MVA
INDONESIA REGIONAL SUMATERA Pembangkit
15.990 MW
Transmisi
20.947 kms
Gardu Induk
39.810 MVA
REGIONAL JAWA, BALI & NT Pembangkit
29.046 MW
Transmisi
21.610 kms
Gardu Induk
96.841 MVA
Pembangkit
56.024 MW
Transmisi
63.855 kms
Gardu Induk
DIRREN
151.424 MVA
www.pln.co.id
| 17
Pengembangan Regional Sumatera
DIRREN
www.pln.co.id
| 18
Grafik Neraca Daya Sistem Sumatera 2018-2027 17.500
MW 15.000
12.500
49,9%
Reserve Margin
PLTG/MG
EBT Lain-nya
PLTA IPP
PLTA PLN
PLTGU
PLTP
PLTU IPP
PLTU PLN
Pembangkit Sewa
Pembangkit IPP
Pembangkit Eksisting PLN
37,4%
30,7%
49,9% 49,2% 45,2%
Beban Puncak
44,6% 33,2%
10.000
30,1% 7.500
22,1%
Komposisi Pembangkit: 2027
5.000
2.500
-
2018
2019
2020
2021
2022
2023
2024
2025
2026
PLN
30,2%
IPP
69,8%
2027
Tahun
DIRREN
www.pln.co.id
| 19
Peta Pengembangan Regional Sumatera 32 _ P l TU Sumsel-8 (MT ) 2x600 MW - 2022/23 33_ P L TU Banyuasin (MT) 2x120 MW - 2021 34. PLTU Sumsel -\ 2x300 MW - 202\ 3 5 PLTU Sumsel-6 (MT ) 300 MW - 202 4 36 PLTGU (ST Unit) Tal ang Duku 30 MW - 202\ 37 PLTP Lumut Balai (FTP2) 2x5 5 MW - 20 \ 81\9 38. PLTP Rantau Dadap (FTP2) 86& \3 4 MW - 2020125 39 _ P L T U SuITTlagsel-1 (MT) 2x150 MW - 202 3 40_ P L T GU Gn.Meg ang Ekspansi 40 MW - 2020 41. PLTGU (ST Unit) Borang 30 MW - 202\ \ PLTU Me u lab oh (Nagan Raya) #3,4 400 MW - 202012\ 2. PLTA Peusangan l &ll 88 MW - 202012\ 3. PLTA Krueng lse p 20 MW 20 \81\9 4_ PL T GU/MGU Sumbagut-2 Peaker 240 MW - 20 19 5 PLTA Kurrbi h -3 45 MW - 2022 6. PLTG M PP Band a Aceh 50 MW - 2018 7_ PL T G M PP Ba nd a Aceh II 110 MW- 20 19
I
PLN
42 _ P l TA Air Putih 21 MW - 2019 43 PLTP Hulula is (FTP2) 2x55 MW - 202012 \ 44. PLTU Bengkulu 2x\O0 MW - 20 \9120
45 PLTA Semangka (FTP2) 56 MW - 20\8 46 _ P L T GU /MG Lalll)ung Peaker 200 MW - 2019 47. PLTP RaJabasa (FTP2) 220 MW - 2025
8. PLTU P. Susu #3 (FTP2) 2x200 MW - 20181\9 9_ P L T U Surn.Jt- 1 2x150 MW - 2019 \0 PLTGU Belawan # 3 430 MW - 2024 \ \. PLTGU/MGU Sumbagut-134 800 MW - 20 20 12_ P L T A Pun-v Storage-1 500 MW - 2027 \ 3 PLTU Sumut-26 00 MW 202 \ \ 4 PLTA Hasang (FTP2) 39 MW - 20 \9 \5 . PLTM Sidikalang-2 7,4 MW 202\ 16 _ P L T A Asahan Ill (FTP2) 174 MW - 2023/24 \7 PLTP Sarulla I (FTP2) \ \0 MW - 20 \8 18. Pl TA Batang Toru 510 MW - 2021 \9 . PLTP Sorik Marapi (FTP2) 240 MW - 20\8 s/d 2023 20 PLTG M PP Nias (EPC) 34 MW - 2018
Penin sular • Malayaia
48. PLTGU BangkaPeaker 100 MW - 2020 49 _ P L T U Bangka-1a 100 MW - 2022 50 PLTU Belitung-2 30 MW - 2024 50. PLTM G Belitung 1 2x\ 5 MW - 20 \9120 50. PLTM G Belitung-2 20 MW - 2022
51- P LTU Bintan 2x100 MW - C00 2022 52 PLTM G MPP Tj Pinang 33 MW - COIJ 20\9 53. PLTM G MPP Natuna 2 \ MW - COO 20 \9 0
2\. PLTGUIMG Riau Peaker 200 MW - 20 \9 22. PLTGU/MG Riau 275 MW - 2021 23 PLTU Riau- \ (M T ) 600 MW - 2024 24. PLT GU RJau-2 250 MW - 2024
53
25. PLTA Masang-2 (FTP2) 44 MW - 2023 26. PLTP Muara Laboh 220 MW - 20\9 120 25 27 _ PLTG MPP Tan1ung Jabung Timur 33 MW 2018 28. PLTGU (ST Unit) Batang Hari 30 MW - 202 0 28 _ PLTGU (ST Unit) Payoselincah 30 MW - 2020 29. PLTU Jambi \ (MT) 2x300 MW - 2022 30_ PLTU Jambi 2 (MT) 2x300 MW - 2022 3\ _ PLTP Sungai Penuh (FTP2) \ \ 0 MW - 2025
,,,,, ,,9:'"',·,0,., .,,
49
'->
\
PT PLN (Persero) Kantor Pusal
DESEMBER 2017
PETA RENCANA SISTEM SUMATERA 20 \ 5-20 24 --
Eksisting 70 kV Eksisting 150 kV
-
Eksisting 275 kV
Rencana 150 kV Rencana 275 kV Rencan a 500 kV Rencan a Kab el 15 0 kV ,: :::::: Ren cana HVDC 500 kV
DIVIS ! PERENCAHAAN SISTEM •
G I Els ii ling 1 t V
•
G I Eh5 fo Q7ll •V
0
G I R llrl""'1 1ID t V
0
G ITET R n c:an,i 27!1•V
IRREN www.pln.co.id R-,can.a Tambah.an Pembang kit (Koneksi ke Si&em 275 kV) : \ _ PL T U MT Sumsel (Ekspans) 350 MW - COO 2023 2. PLTU MT Sumsel 6B 300 MW - COIJ 2025
24
Pengembangan Regional Jawa, Bali dan Nusa Tenggara
DIRREN
www.pln.co.id
| 25
Neraca Daya Sistem Jawa-Bali 2018-2027
Komposisi Pembangkit: 2027 PLN
59%
IPP
41%
DIRREN
www.pln.co.id
| 26
Neraca Daya Sistem Lombok
Komposisi Pembangkit: 2027 PLN
83%
IPP
17%
DIRREN
www.pln.co.id
| 33
Neraca Daya Sistem Timor
Komposisi Pembangkit: 2027 PLN
92%
IPP
8%
DIRREN
www.pln.co.id
| 35
Peta Pengembangan Regional Jawa, Bali, Nusa Tenggara 2 3
SRLYA ~ ~ ~ ~ CLGON
1
5 6 8~
9
MTWAR
LNTAR
4
~
MKRNG PRIOK DKSBI KMBNG BLRJA CKUPACWGBR TMBUN
LGKNG
XBOGOR
7
CWANG BKASI
GNDUL
10 13
SKTNI IDMYU CBATU
21
DLTMS
15
CIBNG DEPOK
11
UBRUG
TJATI B
TBLRK
UJBRG
CKLNG
TASIK
19
16
~ 12~ CRATA 14MDCAN BDSLN
RMBNG
GRSIK
20
23
~ UNGAR
BTANG
NGBNG SBBRT
RWALO
~
17 ~
TJWAR
2425 GRATI
AMPEL
18
KDIRI
PEDAN
~
WARU SBSLN
TWLAN ~
22
26
PITON
BNGIL WTDDL
27
~ NTSRI
*) COD Pembangkit Berdasarkan RUPTL 2017-2026 3
LEGENDA Pembangkit ~
Rencana Pembangkit GITET 500 kV Rencana GITET 500 kV SUTET 500 kV Rencana SUTET 500 kV
1. PLTU Jawa-9 & Jawa 10 2x1000 MW (2023/2024) 2. PLTU Banten 1x660 MW (2026) 3. PLTU Jawa-7 2x991 MW (2020) 4. PLTU Jawa-5 1x1000 MW (2022) 5. PLTU Lontar Exp #4 1x315 MW (2019) 6. PLTGU Muara Karang 500 MW (2019) 7. PLTDG/MG Senayan 100 MW (2019) 8. PLTGU Jawa-2 800 MW (2018/2019) 9. PLTGU Muara Tawar Add-on Blok 2,3,4 650 MW (2019)
10. PLTGU Jawa-1 2x880 MW (2022/2023) 11. Upper Cisokan PS 4x260 MW (2024/2025) 12. PLTA Rajamandala 47 MW (2019) 13. PLTU Indramayu #4 1000 MW (2026) 14. PLTA Jatigede 2x55 MW (2019) 15. PLTU Jawa-1 1x924 MW (2022) 16. PLTU Jawa-3 2x660 MW (2024/2025) 17. PLTA Matenggeng PS 4x225 MW (2025) 18. PLTU Jawa-8 1x945 MW (2020)
19. PLTU Jawa Tengah (PPP) 2x950 MW (2020) 20. PLTGU Jawa-Bali 1 779 MW (2020) 21. PLTU Jawa-4 2x1000 MW (2021) 22. Grindulu PS 1000 MW (2025) 23. PLTGU Jawa-3 800 MW (2021) 24. PLTGU Grati 450 MW (2018) 25. PLTGU Grati Add-on Blok 2 183 MW (2019) 26. PLTGU Madura 450 MW (2023) www.pln.co.id 27.DIRREN PLTU/GU/MG Bali 135 MW (2022) | 37
Pengembangan Regional Kalimantan
DIRREN
www.pln.co.id
| 38
Neraca Daya Sistem Kalbar 1.800
1.600
1.400
1.200
Pembangkit PLN (PLTG/D)
Pembangkit Sewa
Interkoneksi Sub Sistem
PLTA IPP
PLTP IPP
PLTP PLN
PLTU IPP
PLTU PLN
PLTU
PLTA PLN
PLTGU
PLTG/MG IPP
PLTG/MG PLN
PLTA
Power Purchase (Sesco)
Reserve Margin
Pembangkit EBT
Beban Puncak
36% 39%
30%
38% 34%
1.000
43% 800
600
36%
33% Komposisi Pembangkit:
38%
2027
44%
400
PLN
72%
IPP
28%
200
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
DIRREN
www.pln.co.id
| 39
Neraca Daya Sistem Kalseltengtimra 5.000
4.500
Tambahan Pembangkit EBT Tambahan PLTA Tambahan PLTG/MG PLTGU IPP PLTU PLN Pembangkit Sewa Pembangkit PLN
Reserve Margin Tambahan PLTG/MG/GU PLTG PLN PLTG/MG PLN Tambahan PLTU Pembangkit IPP dan Excess Power
46% 44%
4.000
43%
39%
3.500
43% 42%
3.000
44% 42%
2.500
34%
Komposisi Pembangkit:
2.000
1.500
2027
17%
1.000
PLN
50%
IPP
50%
500
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027 DIRREN
www.pln.co.id
| 42
Peta Pengembangan Regional Kalimantan SISTEM KALTIMRA
SISTEM KALBAR
SISTEM KALSELTENG
DIRREN
www.pln.co.id
| 45
Pengembangan Regional Sulawesi
DIRREN
www.pln.co.id
| 46
Neraca Daya Sistem Sulbagut 1.600
Reserve Margin Tambahan PLTG/MG/GU PLTP PLN PLTU SEWA PLTU IPP Kapasitas Sewa Kapasitas Terpasang PLN
1.400
Tambahan PLTA/M PLTG PLN Tambahan PLTP Tambahan PLTU PLTU PLN Kapasitas IPP PEAK DEMAND FORECAST
35% 35%
1.200
43%
40%
35%
43%
1.000
44% 37%
800
29% 600
Komposisi Pembangkit:
29% 2027
400
PLN
66%
IPP
34%
200
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
www.pln.co.id
| 47
Neraca Daya Sistem Sulbagsel 5.000 4.500 4.000
Tambahan Pembangkit EBT
Reserve Margin
PLTA IPP Tambahan PLTMG
MPP PLN Tambahan PLTA
Tambahan PLTG/MG/GU Tambahan PLTU
PLTGU IPP PLTU IPP
PLTU PLN
Pembangkit Sewa
Pembangkit IPP
Pembangkit Terpasang PLN
46% 47% 33%
3.500
41% 3.000
33%
41% 28%
2.500 2.000
40%
35%
28%
Komposisi Pembangkit: 2027
1.500 1.000
PLN
55%
IPP
45%
500 2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
www.pln.co.id
| 50
Peta Pengembangan Regional Sulawesi SISTEM SULBAGUT
SISTEM SULBAGSEL DIRREN
www.pln.co.id
| 53
Pengembangan Regional Maluku dan Papua
DIRREN
www.pln.co.id
| 54
Neraca Daya Sistem Ambon 180
160
Reserve Margin
Tambahan PLTG/MG/GU
PLTMG PLN
PLTU IPP
PLTU PLN
Tambahan PLTU
PLTP PLN
Pembangkit Sewa
Pembangkit PLN
Beban Puncak
93%
140
63%
58%
47%
62% 51%
75%
120
100
83%
71%
47%
80
Komposisi Pembangkit:
60
2027
40
PLN
100%
IPP
0%
20
0 2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
DIRREN
www.pln.co.id
| 55
Neraca Daya Sistem Jayapura 300
250
Reserve Margin
Tambahan PLTG/MG/GU
PLTMG PLN
PLTU IPP
PLTU PLN
Tambahan PLTU
PLTM (PLN+IPP)
Pembangkit Sewa
Pembangkit IPP
Pembangkit PLN
55%
Beban Puncak
45%
200
86%
74%
60%
42%
30%
34%
47%
78% 150
Komposisi Pembangkit: 2027
100
50
PLN
100%
IPP
0%
0 2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
DIRREN
www.pln.co.id
| 57
Neraca Daya Sistem Sorong 160
140
Reserve Margin
Tambahan PLTG/MG/GU
Tambahan PLTA/M
PLTMG PLN
PLTU IPP
PLTU PLN
Tambahan PLTU
Excess Power
Pembangkit IPP
Pembangkit PLN
86%
73%
61%
49%
37%
Beban Puncak
120
68% 65%
100
80
44%
34%
47% Komposisi Pembangkit:
60
2027
40
PLN
100%
IPP
0%
20
0 2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
DIRREN
www.pln.co.id
| 59
Peta Pengembangan Regional Maluku Papua SISTEM AMBON DAN SERAM
SISTEM JAYAPURA
SISTEM SORONG SISTEM TERNATE DAN HALMAHERA
DIRREN
www.pln.co.id
| 61
Strategi Pengembangan Energi Baru Terbarukan
DIRREN
www.pln.co.id
| 62
Strategi Pengembangan Energi Baru Terbarukan • Pengembangan pembangkit EBT tetap memperhatikan keseimbangan supply–demand, kesiapan sistem dan keekonomian. • PLN akan memanfaatkan sumber energi terbarukan dari jenis energi aliran dan terjunan air, energi panas bumi (termasuk skala kecil/modular), biofuel, energi angin, energi sinar matahari, biomassa dan sampah, dll serta mendukung upaya RE-BID (Renewable Energy Based on Industrial Development) • Khusus mengenai PLTS, dilakukan mengembangkan centralized PV untuk melistriki banyak komunitas terpencil yang jauh dari grid pada daerah tertinggal, pulau-pulau terdepan yang berbatasan dengan negara tetangga dan pulau-pulau terluar lainnya. • PLTS hybrid dengan PLTD atau menggunakan baterai. Strategi ini diprioritaskan untuk daerah yang jam nyala-nya rendah (di bawah 12 jam/hari), umumnya di Indonesia Timur • Pengembangan Micro grid untuk daerah-daerah isolated. Daerah yang dalam 2-3 tahun kedepan belum direncanakan untuk dibangun distribusi atau pembangkit thermal kecil, diusulkan untuk menggunakan PLTS.
DIRREN
www.pln.co.id
| 63
PLN
Fuel Mix
otRREN
www.pln.co.id
I
64
Proyeksi Bauran Energi
Jenis
2025
EBT
23,0%
Gas
22,2%
Batubara
54,4%
BBM
0,4%
Jumlah
100,0%
DIRREN
www.pln.co.id
| 65
Proyeksi Kebutuhan Bahan Bakar TBTU
Juta Ton
Ribu kl
DIRREN
www.pln.co.id
| 66
Program Listrik Perdesaan
DIRREN
www.pln.co.id
| 67
Strategi Pengembangan Listrik Perdesaan • Melistriki desa baru yang belum berlistrik maupun desa lama yang sebagian dari dusunnya belum berlistrik. • Perluasan jaringan distribusi dari sistem kelistrikan eksisting yang berdekatan disertai dengan penambahan kapasitas pembangkit yang diperlukan sistem tersebut. Bagi daerah yang masih terisolasi, pelosok dan perbatasan dengan negara tetangga dimana pemanfaatan EBT masih belum terwujud, dimungkinkan adanya pengembangan pembangkit berbahan bakar minyak • Pembangunan pembangkit skala kecil baik EBT maupun pembangkit lainnya termasuk PLTS Komunal, Tower PV dan Solar Home System serta jaringan distribusi yang diperlukan, untuk melistriki desa terisolasi yang terletak jauh dari desa berlistrik eksisting. • Membuka kemungkinan hybrid PLTS dan hybrid PLTB dengan grid PLN. • Bekerjasama dengan pemerintah untuk mendukung program Pra-elektrifikasi seperti LTSHE. • Mencari metode-metode baru untuk melistriki daerah isolated sangat sulit dijangkau jaringan PLN maupun dibangun pembangkit. Contoh dengan DC house / Tabung listrik (Talis). • PLN dan pemerintah berupaya untuk mencapai Rasio Desa Berlisrik (RD) 100% pada 2018. DIRREN
www.pln.co.id
| 68
Usulan Revisi Road Map Lisdes 2017 dan 2018 2027 Wilayah Sumatera Jawa Bali Kalimantan Sulawesi Nusa Tenggara Maluku Papua
2017
Lama
Baru
477
375
1123
5
73
94
430
347
74
619
7
183
0
379
Wilayah Sumatera Jawa Bali Kalimantan Sulawesi Nusa Tenggara Maluku Papua
2019 2018
Perluasan jaringan
Lama
Baru
221
822
850
14
127
828
77
666
Total
Lama
Baru
65
564
2
215
2017
2184
2002
0
551
2018
1342
3660
*) Sesuai Forum Lisdes tanggal 28-29 September 2017 DIRREN
www.pln.co.id
| 69
TERIMA KASIH