CLIENT LOGO

PM LOGO

ENGINEER’S LOGO

CONTRACTOR’S LOGO

CONTRACTOR SUBMITTAL PROJECT NAME:

EMPLOYER

CONTRACTOR:

ENGINEER

FIDIC Clause 2

WSP MIDDLE EAST LIMITED

SUBMITTAL NUMBER

DATE: STRUCTURAL

SUBMITTAL DESCRIPTION MATERIAL SUBMITTAL

REV.

MECHANICAL

ELECTRICAL

CIVIL

ARCHITECTUR AL

CLAUSE 14 PROGRAMME

SUBCONTRACT OR SUPPLIER

TEST RESULTS

OTHER (SPECIFY)

X

SHOP DRAWINGS/C LCS

METHOD STATEMENT

X LOCATION: LIST OF SUBMITTED ITEMS: Item

Description

REF. SPEC(s): COMPLIANCE STATEMENT

No. of Copies

Remarks

REF. DRWG(s): The Contractor hereby confirms that the submitted items have been reviewed in detail and are correct and in strict conformance with the Contract Documents except otherwise stated.

For and on behalf of the Contractor Name:

Signature:

Date:

ENGINEER’s REVIEW COMMENTS Code 1 Approved

Code 2 Approved As Noted

Code 3 Revise And Resubmit

Code 4 Rejected

Code 5 For Information Only Comments Sheet Attached Yes

Name:

No Signature:

Date:

Signature:

Date:

EMPLOYER’s COMMENTS

Name:

Note: The Engineer’s approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents. Distribution: File/Templ ate

1. Contractor [Original], 2. Employer, 3. Project Manager, 4. QS/Cost Consultant, 5. Consultants, 6. File 25665521.doc