CONTRACTOR SUBMITTAL PROJECT NAME:
EMPLOYER
CONTRACTOR:
ENGINEER
FIDIC Clause 2
WSP MIDDLE EAST LIMITED
SUBMITTAL NUMBER
DATE: STRUCTURAL
SUBMITTAL DESCRIPTION MATERIAL SUBMITTAL
REV.
MECHANICAL
ELECTRICAL
CIVIL
ARCHITECTUR AL
CLAUSE 14 PROGRAMME
SUBCONTRACT OR SUPPLIER
TEST RESULTS
OTHER (SPECIFY)
X
SHOP DRAWINGS/C LCS
METHOD STATEMENT
X LOCATION: LIST OF SUBMITTED ITEMS: Item
Description
REF. SPEC(s): COMPLIANCE STATEMENT
No. of Copies
Remarks
REF. DRWG(s): The Contractor hereby confirms that the submitted items have been reviewed in detail and are correct and in strict conformance with the Contract Documents except otherwise stated.
For and on behalf of the Contractor Name:
Signature:
Date:
ENGINEER’s REVIEW COMMENTS Code 1 Approved
Code 2 Approved As Noted
Code 3 Revise And Resubmit
Code 4 Rejected
Code 5 For Information Only Comments Sheet Attached Yes
Name:
No Signature:
Date:
Signature:
Date:
EMPLOYER’s COMMENTS
Name:
Note: The Engineer’s approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents. Distribution: File/Templ ate
1. Contractor [Original], 2. Employer, 3. Project Manager, 4. QS/Cost Consultant, 5. Consultants, 6. File 25665521.doc
Rev .
1
Dat e
01.08.2008
By
Dr SHH