Winter Storage Reservation- 2010

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Winter Storage Reservation- 2010 as PDF for free.

More details

  • Words: 409
  • Pages: 2
Office Use Only Haul: ______________________ Launch: ____________________

Winter Storage Reservation ~ 2009-2010 Contact Information Name: ____________________________________________________ Date: _________________________________________________ Address:___________________________________________________ City: _________________________ State: ______ Zip: _______ Phone #: __________________________________ Alternate #: _____________________________ E-mail: _______________________ Boat Information Boat Name: ______________________________________ Boat Size: ______________ Boat Manufacturer: ________________________ Sail

Power

Beam: __________ Draft: _________ Combo: ____________ Key Location: _________________________________

Registration #: ____________________________________ Hull ID #: _______________________________________________________ Do you need FPM to pick up your boat (Magothy River only)?

Yes

No If yes, detailed location:

___________________________________ Special haul/launch instructions: _______________________________________________________________________________________ __________________________________________________________________________________________________________________ Haul/Launch Request 1st

Choice

2nd

Choice

Haul Week Before September 25th

Launch Week After May 11th (per request)

September 28th – October 2nd

After May 11th (per request)

October 5th – October 9th

After May 11th (per request)

October 12th – October 16th

May 3rd - May 7th

October 19th – October 23rd

April 26th – April 30th

October 26th – October 30th

April 19th – April 23rd

November 2nd – November 6th

April 12th – April 16th

November 9th – November 13th

April 5th – April 9th

November 16th – November 20th

March 29th – April 2nd

November 23rd – November 27th

March 22nd – March 26th

November 30th or later

March 15th – March 19th

NOTE: If you do not launch on your scheduled date and we must move your boat, there will be a re-blocking fee

Haul/Launch Fee Calculator 0-34’ ft Haul, Powerwash, Block and Launch 13.50/ft Multiply by LOA of boat x ft Total for Haul & Launch

35’ and over 14.00/ft x ft

Full payment of haul/launch is required for reservation Land Storage is billed monthly and due on the 1st of each month

Backstay removal (if required) 50.00

Payment Information Amount Enclosed: ____________________ Payment Method:

Check # ____________

Visa

Mastercard

Card #: ___________________________________________ Expiration Date: ________________ Cvv Code: _______________

I would like FPM to auto bill this credit card for monthly dry storage bill? No I would like to receive my invoices via

Email

Regular mail

Signature: _________________________________________________

Both

Yes

Please return to Ferry Point Marina • Completed form w/ 1st & 2nd haul week choices • Check or credit card information • Current boat insurance certificate

Date: _____________________________________

An express mechanics lien is acknowledged on above boat to secure the amount of repairs, services and/or storage thereto. I HAVE READ AND UNDERSTAND THE BOAT YARD POLICIES ENCLOSED IN THIS PACKET

700 Mill Creek Road ● Arnold, Maryland ● 410.544.6368 ● 410.315.9573 (fax) www.ferrypointmarina.com (website) [email protected] (e-mail)

Related Documents