VIVA VOCE MODEL QUESTIONS 1. What is the project deals with? Planning, Designing and estimation of public building (Post Office)

2. What is the overall estimation? It’s about 1.25 crores

3. What is the proposed site area of your public building (Post Office) It is about 1500 sq.m

4. What is the public building (Post Office) comprising with? G+1

5. Do you follow the recognized provison codes? yes, IS 456-2000

6. What are the components do you designed in this project as calculations?  Design of Beams  Design of Slabs  Design of Columns  Design of Footings  Design of Septic Tank  Design of Staircase etc.,

7. Which software is used to design the plan? AutoCAD 2018

8. What is the size of Slab?  Size = 6.7*6.1  Wall thickness = 230mm

9. What is the Design constrants? Design constants  Concrete grade = M 20  Size Grade = Fe415

10.What is the diameter of the bars? specify Provide 10mm dia bars at 300mm centers

11.As per design of beam is there any conflections? No. deflection control is satisfied

12.What is the basic size of the column? 350mm * 350mm

13.What is the design summary of the column?  Size of the column 350mm X 350 mm  Londitudinal Reinforcement to Provide 14 nos of 25 dia bars  Lateral ties to provide 8mm diameter 300 mm c/c distance  Hence it is safe

14.What is the calculated bending moment of the beam? 806.27 KNm

15.What is the effective depth of the footing? 680 mm

16.What is the summary of the footings?  Size of the footing 3m x 3m over all depth of footing = 760 mm  To provide 10 Nos of 20mm dia bars on either direction

17.Where you provide the septic tank Area of dry waste

18.As per your design, how long the usage of septic tank theoretically?  No of the persons = 200 (Approx)  Water requirement = 120 lit / Capital / day

19.How long you concentrate the estimation? Approx and detail