Visakhapatnam Steel Plant - Success Story

  • Uploaded by: Project Sales Corp
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Visakhapatnam Steel Plant - Success Story as PDF for free.

More details

  • Words: 620
  • Pages: 9
Success Stories at Visakhapatnam Steel Plant India

Equipments Lubricated with Molykote at Vizag Steel • • • • • • • • • •

Hammer Crushers Blender Reclaimers ID/FD Fans Motors Pumps Vibratory Screens Chains Hydraulic Cylinders Conveyor Bearings And, many many more

A Bird Eye View of Visakhapatnam Steel Plant with the Thermal Power Plant in the Foreground

Why the customer chose to go for Molykote Products •

Increasing demands on enhancing production without capacity expansion



Downtime had to be avoided



Unscheduled stoppages had to be avoided



Reliability had to be increased. Chances for human errors to be minimized.



Manpower costs as a %age of total lubrication costs had gone up due to wage increases.



Molykote products have a pedigree of proven performance and had shown excellent results in wherever they were used. Hence, more products were allowed in when new applications were found.

Hammer Crushers •

Conditions – Heavy Shock Loads, Dust, Vibrations and high loads



Concerns – Daily relubrication schedule increases chances of human errors



Desired – Weekly Lubrication Schedule.



Product Recommended – Molykote Long-term 2+.



Results – Relubrication period extended to weekly within 3 months of application.



Volume – 4 x 180 kg drums/ year

Blender Reclaimer •

Spherical Roller Bearings



Concern – Bearings go through a phase of abrasive wear followed by failure.



Relubrication Schedule – Daily



Product Used- Conventional EP Grease



Product Recommended – Molykote Longterm 2+



Current Relubrication Schedule – Once in 5 days without bearing failures. Extension to 7 days lead to bearing failures. So now schedule in once in 5 days.



Used since 2002. 2 x 180 kgs drums /year.

Vibratory Screens •

Conditions – Continuous operation, weekly shutdowns, vibrations, shock loads.



Concern – Failure can result in lot of downtime in the entire plant process



Desired – More reliable lubrication without extending relubrication schedule



Product Tried – Molykote Longterm 2+



Result – Schedule can be extended to 12 days.



Expected Volume - 720 kgs/year

Many screens have extended their schedule from one week to 45 days. This particular screen in the picture is the most critical in the plant’s Sintering Zone.

Continuous Caster •

Area – Secondary Cassette Cooling Zone



Component – Bush Rollers



Concerns – High temperature with cooling water washed out grease and bush sticking with corrosion



Molykote Product Recommended – P 40 Paste



Results – After 220 heats and six months of trials, product’s performance good. Formal orders awaited.

Bush Bearings were lubricated with Molykote P40. With steel mill environment of high temperatures and cooling water, P 40 Paste is an ideal product for many applications.

Torpedo Ladle (SMS - Demag) •

Torpedo Ladle Spherical Sheet (Ladle carries the hot metal from the BF to the Converter for Lancing)



Various products tried by customer with poor results



Product Suggested – Molykote Cu 7439 Paste



Results – Good. In use for last 5 years.



Volume: 20 kgs/year

Spherical sheets subjected to oscillation and high temperatures lubricated now with Molykote Cu 7439 for last 5 years, once during overhaul.

Other Molykote Products Supplied •

Molykote D Paste • – Roll Shop Roll Assembly – WRM Compactor Rails – Water Management for Valve Assembly



Molykote GN + Paste – Various assembly applications at Area Repair Shops



Molykote Z Powder – Various dry lubrication applications in utility plants, converters and coke ovens.

Molykote M 30 Chain Oil – Furnace Area Chains – Rolling Mill Conveyor Bed Chains



Molykote 1000 Paste – Anti-seize applications



Molykote 111 Compound – O ring assembly



DC 4 Compound – Electrical Repair Shop

Related Documents

Steel Plant
July 2020 8
Success Story
July 2020 26
Vizag Steel Plant
June 2020 12
Success Story Intercars Pl
December 2019 32
Hydro One Success Story
October 2019 33

More Documents from "Gord Reynolds"