Validation Statement Date It is certified that the MRB No 25194-BBZ-MTOF02-MAC-000-L01-0006-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-JGZ-MVVL05-MA-422-L01-0001-02 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RKZ-MVVW14-MAC-371-L001-001-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RDZ-MVVH01-MAC-000-L001-0003-01 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RKZ-MVVW05-MAC-000-L001-004-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RKZ-MVVW05-MAC-000-L01-001-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RKZ-MVVW14-MAC-371-L001-002-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RDZ-MVVH01-MAC-000-L01-0003-01 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RFZ-MVVL13-MAC-000-L01-0002-01 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RHZ-MVCH07-MAC-355-L01-002-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-BBZ-MTOF02-MAC-000-L01-0003-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RFZ-MVVL12-MAC-000-L01-0001-02 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RFZ-MVVL13-MAC-000-L01-0001-01 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RKZ-MVVW05-MAC-000-L01-003-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-BBZ-MTOF02-MAC-000-L01-0003-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RFZ-MVVL13-MAC-000-L01-0003-01 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-BBZ-MTOF02-MAC-000-L01-0006-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved
Validation Statement Date It is certified that the MRB No 25194-RKZ-MVVW05-MAC-000-L01-002-00 Contains all documents represented by the Index. The MRB contains all required documents, as stipulated in the relevant Material Requisition. All documents requiring Bechtel review have been given Code 1 (Work May Proceed) or Code 4 ( Review Not Required. Work May Proceed).
QA/QC Manager
TPIA
Name: Mr. C. Mukherjee.
Name :
Signature :
Signature :
Date : 22.09.2008
Date :
Stamp :
Stamp :
N.B. This statement has to be certified by TPIA or by QC manager wherever TPIA is not involved