EMPRESA COMUNAL DE SERV UNIDAD ANDAYCHAGUA VALORIZACIÓN DEL MES DE DICIEMBRE 2018 ECM CODIGO SAP TRABAJO TURNO FECHA

: EMPRESA COMUNAL DE SERVICIOS MULTIPLES HUAYHUAY R.L. : 48077 : MANTENIMIENTO DE 7 COMPONENTES EN ZONA ZORAIDA : DIA

ÁREA CONTRATO PARTICULAR MONEDA HOJA

: 23 DE NOVIEMBRE DEL 2018 - 25 DE DICIEMBRE DEL 2018

ITEM

OP

LABOR

1

C1-1YL00004-04-01

MATERIAL

TEXTO BREVE

PRECIO NETO

U.M.

CANT.

MONTO (S/.)

800060004

AVANCE EN OBRAS CIVILES

350,000.00

UN

0.272

95,084.91

SUB TOTAL

INGENIERO RESIDENTE ECOSEM HUAYHUAY R.L.

95,084.91

MPRESA COMUNAL DE SERVICIOS MULTIPLES HUAYHUAY R.L.

NIDAD ANDAYCHAGUA

ACIÓN DEL MES DE DICIEMBRE 2018 ÁREA CONTRATO PARTICULAR MONEDA HOJA

: ASUNTOS AMBIENTALES

: YA-2011-051/2014-I : Soles : 1 de 1

Para Costos ACTIVIDAD

IMP.

CTTO

POS.

CANT.

CENTRO

SOLICITANTE

: MANTENIMIENTO DE 7 COMPONENTES EN ZONA ZORAIDA

P

48077

10

0.272

SAND

JCAYETANO

SUPERVISOR VOLCAN COMPAÑÍA MINERA S.A.A.

SUPERINTENDENTE DE AREA VOLCAN COMPAÑÍA MINERA S.A.A.

VALORIZACIÒN DE OBRA OBRA CLIENTE LUGAR EMPRESA

: MANTENIMIENTO DE 7 COMPONENTES EN ZONA ZORAIDA : VOLCAN COMPAÑÍA MINERA S.A.A. : ANDAYCHAGUA : EMPRESA COMUNAL DE SERVICIOS MULTIPLES HUAYHUAY R.L. PRESUPUESTO CONTRACTUAL ANTERIOR Metrado Parcial S./

Und

Metrado

Precio Unitario

Parcial S./

01.00.00 TRABAJOS PRELIMINARES 01.01.00 SEGURIDAD Y SEÑALIZACIÓN - TRABAJOS EN TALUD 01.02.00 TRAZO, NIVELES Y REPLANTEO C/NIVEL TOPOGRAFICO 01.03.00 MOVILIZACION Y DESMOVILIZACION DE MATERIALES Y EQUIPOS

Glb M2 Glb

0.25 3500.00 4.00

1522.80 4.77 717.80

380.70 16,695.00 2,871.20

-

02.00.00 MOVIMIENTO DE TIERRAS 02.01.00 EXCAVACION EN TERRENO NORMAL 02.02.00 EXCAVACION EN TERRENO SEMIROCOSO 02.03.00 PERFILADO MANUAL DE SUPERFICIE 02.04.00 RELLENO CON TIERRA DE CHACRA 02.05.00 ELIMINACION DE MATERIAL EXCEDENTE A 30M

M3 M3 M2 M3 M3

10.00 3.00 3500.00 15.00 8.00

52.17 194.98 15.20 100.09 39.13

521.70 584.94 53,200.00 1,501.35 313.04

-

Item

Descripción Partida

COSTO DIRECTO GASTOS GENERALES (15%) UTILIDAD (10%) TOTAL

S./ S./ S./ S./

76,067.93 11,410.19 7,606.79 95,084.91

S./ S./ S./ S./

0.00 0.00 0.00 0.00

RIZACIÒN DE OBRA

FECHA : DICIEMBRE 2018 VALORIZACION ACTUAL Metrado Parcial S./

N° PROTOCOLO

ACTUAL ACUMULADO Metrado Parcial S./

%

0.25 3500.00 4.00

380.70 16,695.00 2,871.20

P-01 P-01 P-01

0.25 3500.00 4.00

380.70 16695.00 2871.20

100% 100% 100%

10.00 3.00 3500.00 15.00 8.00

521.70 584.94 53,200.00 1,501.35 313.04

P-02 P-02 P-02 P-02 P-02

10.00 3.00 3500.00 15.00 8.00

521.70 584.94 53200.00 1501.35 313.04

100% 100% 100% 100% 100%

S./ S./ S./ S./

76,067.93 11,410.19 7,606.79 95,084.91

S./ 76,067.93 S./ 11,410.19 S./ 7,606.79 S./ 95,084.91

100.0%

PRESUPUESTO OBRA CLIENTE LUGAR EMPRESA

: MANTENIMIENTO DE 7 COMPONENTES EN ZONA ZORAIDA

Item

Descripción

: VOLCAN COMPAÑÍA MINERA S.A.A. - U.E.A. YAULI : ANDAYCHAGUA : EMPRESA COMUNAL DE SERVICIOS MULTIPLES HUAYHUAY R.L.

Unidad Metrado

Precio

01.00.00 01.01.00 01.02.00 01.03.00

TRABAJOS PRELIMINARES SEGURIDAD Y SEÑALIZACIÓN - TRABAJOS EN TALUD TRAZO, NIVELES Y REPLANTEO C/NIVEL TOPOGRAFICO MOVILIZACION Y DESMOVILIZACION DE MATERIALES Y EQUIPOS

Glb M2 Glb

0.25 1522.80 3500.00 4.77 4.00 717.80

02.00.00 02.01.00 02.02.00 02.03.00 02.04.00 02.05.00

MOVIMIENTO DE TIERRAS EXCAVACION EN TERRENO NORMAL EXCAVACION EN TERRENO SEMIROCOSO PERFILADO MANUAL DE SUPERFICIE RELLENO CON TIERRA DE CHACRA ELIMINACION DE MATERIAL EXCEDENTE A 30M

M3 M3 M2 M3 M3

10.00 3.00 3500.00 15.00 8.00

COSTO DIRECTO GASTOS GENERALES Y UTILIDAD 25% TOTAL PRESUPUESTO

52.17 194.98 15.20 100.09 39.13

PRESUPUESTO

Parcial

Subtotal

Total

19,946.90

19,946.90

56,121.03

56,121.03

S./ S./ S./

76,067.93 19,016.98 95,084.91

380.70 16695.00 2871.20

521.70 584.94 53200.00 1501.35 313.04

METRADOS Obra: Cliente: Fecha:

: MANTENIMIENTO DE 7 COMPONENTES EN ZONA ZORAIDA VOLCAN COMPAÑÍA MINERA S.A.A. - U.E.A. YAULI DICIEMBRE 2018 CAN

01.00.00 01.01.00

01.02.00

01.03.00

Ancho

02.01.00

02.02.00

02.03.00

02.04.00

02.05.00

Alto

Glb

SEGURIDAD Y SEÑALIZACIÓN - TRABAJOS EN TALUD

0.25

0.25

3500.00

3500.00

M2

TRAZO, NIVELES Y REPLANTEO C/NIVEL TOPOGRAFICO

MOVILIZACION Y DESMOVILIZACION DE MATERIALES Y EQUIPOS

Glb 4.00

02.00.00

Largo

OBRAS PRELIMINARES

4.00

MOVIMIENTO DE TIERRAS M3

EXCAVACION EN TERRENO NORMAL

10.00

10.00

3.00

3.00

3500.00

3500.00

15.00

15.00

8.00

8.00

M3

EXCAVACION EN TERRENO SEMIROCOSO

M2

PERFILADO MANUAL DE SUPERFICIE

M3

RELLENO CON TIERRA DE CHACRA

M3

ELIMINACION DE MATERIAL EXCEDENTE A 30M

Página 8 de 9

ETRADOS

TOTAL

0.25 P-01 3,500.00 P-01 4.00 P-01

10.00 P-02 3.00 P-02 3,500.00 P-02 15.00 P-02 8.00 P-02

Página 9 de 9

Related Documents

Val Mcz
October 2019 16
Val Po
April 2020 6
Dom3-val
October 2019 15
Val Varaita
April 2020 5
Val Pellice
April 2020 4
Normal Val
May 2020 0

More Documents from ""

Informe Semanal S
October 2019 20
Informe Posta Medica
October 2019 21
Informe Semanal Z
October 2019 21
Val Mcz
October 2019 16