Update Schedule Cw J3 Updated_300816.xlsx

  • Uploaded by: Ashadi Amir
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Update Schedule Cw J3 Updated_300816.xlsx as PDF for free.

More details

  • Words: 203
  • Pages: 3
Remaings CW - J3 schedule 30 31 Solobaru: - Oilpit - Import filling on S/Y area Kentungan: - Finishing Cover chequer plate 20 kV room existing control room floor for access - Demolish interface cable Bringin: (BAST Pending Item) kV incoming Trench (New additional works - 20 instructed by Owner) -- BAST pending item Ungaran: - Adaptor CB - mCC foundation - Demolish cable access Tambak Lorok: - 20 kV cable support road pavement (After energization on - Access Sept'16)) Lomanis: - Demolishing works - Bore piles - Transformer foundation - Gantry Foundation Foundation (Adaptor CB + Chemical - Equipment Bolt for LA, CT) - Oil Pit Klaten: (BAST Pending Item) - U-Ditch 20kV outgoing (Add. Works requested by Owner) - Finishing works Rawalo: (BAST Pending Item) - Finishing works

1

2

3

4

5

6

7

8

9 10 11

Sep-16 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1

2

3

4

5

6

7

8

Oct-16 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

No Impact on energization process

No Impact on energization process