Task 11.2.1 Facilities for Water Supply Produce a line drawing showing the layout of the water facilities for a four storey office building with ladies and gents toilets and a kitchen on each floor.
Task 11.2.2 Soil and Waste Removal Produce a line drawing of a typical dwelling showing how the soil and waste is removed from the appliances and deposited into the public sewer. This should show the location of all traps and the means of access to both the above and below drainage system.
Task 11.2.3 Electricity With the use of an illustration explain the layout of the electricity provision for a single storey 1 bed roomed dwelling. (200-300 words)