UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
Part-3 PROPOSAL EXIBITS TO BE SUBMITTED BY BIDDER
Project
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 44 of 69
UEEPL
TECHNICAL
Project
Specification for 415V NSPBD
DATA
Part-3.1 Section-4.0 SHEET TO BE
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
SUBMITTED
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
BY
BIDDER
Rev 0 Page 45 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART3.1 Section4, 3.1.1
SCHEDULE T0
GUARRANTEED TECHNICAL PARTICULARS TO BE SUBMITTED BY BIDDER Instruction to bidders 1) Bidder to fill up only column (B) and shall not change description in column (A) 2) Bidder to submit GTP with data in numerical values wherever asked. 3) Bidder shall not use words like Adequate, As per standard, Later, After award etc. This will be considered as deviation. Sr. 1.0
Particulars (A) Non
segregated
Tech data Phase
bus duct 1.1
Make
1.2
Type
1.3
Model No.
1.4 1.5
Address of manufacturing works Qty
1.6
Applicable Standard
1.7
Rated Voltage
1.8
Phase
1.9
Frequency
kV Nos Hz
1.10 1.11
Insulation
1.11a.
1 Min Hipot
1.11 b
Basic impulse
1.12 1.12a.
Rated Continuous Current Main run
Amp
1.12b.
Tap-off run
Amp
1.13
Maximum temperature rise over 50oC ambient
1.13a.
Bus Conductor
°C
1.13b.
Bus Enclosure
°C
kV rms kV peak
1.14 1.15
Project
1.10 Guaranteed Calculated Losses per set of Busduct without any positive tolerance ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 46 of 69
UEEPL Sr.
Specification for 415V NSPBD
Particulars (A)
Tech data
a.
Conductor
KW
b.
Enclosure
KW
c.
Total
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
KW
Bidder's Name Rated Short Time Current & duration Weight per metre run of Isolated Busduct
a. b.
a. b. a. b. a. b. a. b.
Shipping Data Weight of heaviest Dimension of largest package (L x B x H) Material Conductor Enclosure Conductivity Conductor Enclosure Conductor Shape Main Bus Tap-off Bus Conductor Size Main Bus Tap-off Bus
KA rms/sec
kg mm
mm2 mm2
Enclosure Data
D.C. Resistance at 20oCin micro Ohm/metre/phase
Conductor Enclosure Skin-Effect Ratio
50 Cycle Reactance inOhm/metre/phase Capacitance to Ground in Microfarad/meter/phase Losses in Watt/meter/phase
Project
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 47 of 69
UEEPL Sr.
Specification for 415V NSPBD
Particulars (A)
a.
Conductor
b.
Enclosure Enclosure Finish
a.
Base
b. C.
Outside Inside
Phase to earth clearance provided
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur Tech data
mm
Bus Insulator a.
Make
b.
Type
c.
Reference Standard
d.
Number per support
e. f. g. h.
Voltage class Creepage distance Compression strength Cantilever strength
Supporting Steel Structure Hot-dip galvanized
KV Mm Kg Kg Yes/No
Grounding a. b.
a. b. c. d.
Material and size of ground bus if provided separately
Number of ground pads provided
Terminal Adaptor Box Material of enclosure Thickness of enclosure Material of inter phase barrier Thickness of inter phase barrier
Bus duct Layout Reference Drawing No. Catalogue enclosed for various pieces of equipment
Stamp / seal of bidder -
PMCC Transformer
Yes/No
.
Name of Vendors contact person Email id Telephone no Address of the office
Project
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 48 of 69
UEEPL
Project
Specification for 415V NSPBD
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 49 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART 3.2 Section-4.1 SCHEDULES
Project
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 50 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART3.2 Section4.1 3.2.1
SCHEDULE S0 PROPOSAL PARTICULARS
1
Bidder's Complete Company Name
2
Bidder's Proposal Number
3
Bidder's Proposal Date
4
Bidder's Proposal Validity
5
Name and Designation of the Officer of the Bidder to whom all references shall be made for expeditious technical co-ordination.
6
a Whether registered with D.G.S. & D b If so, give i)
Registration Number
ii)
Photostat copy of D.G.S.D reference letter
7
Photostat copy of Income Tax Clearance Certificate furnished?
8
Terms of payment a Terms of payment as per Owner's Specification is acceptable b If not, specify terms of payment
9
Delivery a Delivery period in months for complete equipment from the date of issue of 'Letter of Intent' (allowing time for approval of drawings and test certificates) b Is the delivery period penalty
10
guaranteed
under
Conformance a Is the equipment offered strictly in accordance with Owner's Specification? b If not, have the Deviation Sheets been duly filled up?
11 Project
Performance
guarantee
period
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
for
the
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 51 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
equipment offered
12
Project
a
From the date of commissioning at site
b
From the date of dispatch.
Particular of past experience of similar work furnished?
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 52 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
Part 3.2, Section-4.1, 3.2.2 SCHEDULE S1 TECHNICAL EVALUATION SCHEDULE The Bidder to fill this schedule of Technical Evaluation, failing which his bid will not be considered for evaluation. The information furnished in this schedule shall be binding and shall remain valid throughout the duration of the project. SL. NO.
PARTICULARS
Parameter
By Bidder
A. Experience Details 1.
List similar and higher rating supplied & in operation
2.
Name of Purchaser/ Owner
3.
Date of Commissioning and order value
4.
Completion & Performance Certificate from Purchaser that the plant is in successful operation for at least one (1) year
B. Compliance to Scope 1.
Scope of work (supply, service, exclusion & terminal point) as per Technical Specification with no deviation
Yes / No
2.
Technical data Sheet T0 is furnished in totality with all details/data
Yes/No
C. Deliverables 1.
Schedule of completion period meets specification requirement
Yes/No
2.
All Drawing/data/manuals listed in specification clause complied
Yes/No
3.
List for mandatory spares, recommended spares, start-up & common spares, tools & tackles, furnished
Yes/No
4.
All schedules in PART-3 furnished duly filled
Yes/No
Compliance in toto to Annexure-A in clause 2.1.4.21 of specification.
Yes/No
Compliance in toto to inspection and testing in clause 2.1.4.18 of specification
Yes/No
D. Quality 1. 2.
F. DELIVERY SCHEDULE 1
Project
Delivery completion of NSPBD
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 53 of 69
UEEPL
Specification for 415V NSPBD
SL. NO. 2
PARTICULARS Delivery Completion meets stipulation for all NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur Parameter
By Bidder
SCC
H. DEVIATION 1
Project
Other than deviations listed in schedule S7, the offer meets the specification in all respect
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Yes/No
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 54 of 69
UEEPL
Specification for 415V NSPBD
PART 3.2 Section-4.1, 3.2.3
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
SCHEDULE-S4
BIDDER PAST SUPPLIES & CREDENTIALS Sr. CLIENT No.
Project
SPECIFICATION
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Qty
PO Date
PO value
Commissioning User Date Credential Certificate enclosed (yes/No)
Name of Firm
:
Signature
:
Name
:
Designation
:
Date
:
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 55 of 69
UEEPL
Specification for 415V NSPBD
PART 3.2 Section-4.1 3.2.4
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
SCHEDULE-S5
PRICE BREAK-UP OF RECOMMENDED SPARES S. N o.
Item Descri ption
1
2
Qty.
3
Unit Price
Total Price
CIF (For spares supplie d from abroa d)
Exworks (For indige nous spares )
CIF (For spares supplie d from abroa d)
4
5
6=3x 4
Seal of Company
Exwork s (For indig enou s spar es) 7=3 x5
Local Sales tax on Total Price transportati direct FOR site transaction on charges only (including inland Rate Amoun For For spares insurance, supplied Indige (%) t port nous from clearance abroad spares & port charges)
8
9
10 = 6 + 8+9
Name of Firm
:
Signature
:
Name
:
Designation
:
Date
:
11 = 7 +8+9
Note: 1. All the recommended spare parts indicating the item-wise cost shall be submitted along with the bid. 2. Continuation sheets of like size and format may be used as per Bidders requirements and shall be annexed to this schedule for each system separately. *:
Project
Bidders at its option may quote the price of imported component in Indian Rupees (Bidders to specify).
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 56 of 69
UEEPL
Specification for 415V NSPBD
PART 3.2 Section-4.1 3.2.5 S. N o.
Item Descri ption
1
2
Qty.
3
Unit Price
CIF (For spar es supp lied from abro ad) 4
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
SCHEDULE-S6A Total Price
Exwork s (For indig enou s spar es)
CIF (For spares supplie d from abroa d)
Exwork s (For indig enou s spar es)
5
6=3x 4
7=3 x5
Local Total Price Sales tax on transportati FOR site direct on charges transaction only (including inland Rate Amoun For For spares insurance, supplied Indige (%) t port nous from clearance abroad spares & port charges)
8
9
10 = 6 + 8+9
11 = 7 +8+9
PRICE BREAK-UP OF START up & COMMISSIONING SPARES
Seal of Company
Name of Firm
:
Signature
:
Name
:
Designation
:
Date
:
Note: 1. All the commissioning spare parts indicating the item-wise cost shall be submitted along with the bid. 2. Continuation sheets of like size and format may be used as per Bidders requirements and shall be annexed to this schedule for each system separately. *:
Project
Bidders at its option may quote the price of imported component in Indian Rupees (Bidders to specify).
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 57 of 69
UEEPL
Specification for 415V NSPBD
PART 3.2 Section-4.1 3.2.6 S. N o.
Item Descri ption
1
2
Qty.
3
Unit Price
CIF (For spar es supp lied from abro ad) 4
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
SCHEDULE-S6B Total Price
Exwork s (For indig enou s spar es)
CIF (For spares supplie d from abroa d)
Exwork s (For indig enou s spar es)
5
6=3x 4
7=3 x5
Local Total Price Sales tax on transportati FOR site direct on charges transaction only (including inland Rate Amoun For For spares insurance, supplied Indige (%) t port nous from clearance abroad spares & port charges)
8
9
10 = 6 + 8+9
11 = 7 +8+9
PRICE BREAK-UP OF MANDATORY SPARES
Seal of Company
Name of Firm
:
Signature
:
Name
:
Designation
:
Date
:
Note: 1. All the mandatory spare parts indicating the item-wise cost shall be submitted along with the bid. 2. Continuation sheets of like size and format may be used as per Bidders requirements and shall be annexed to this schedule for each system separately. *:
Project
Bidders at its option may quote the price of imported component in Indian Rupees (Bidders to specify).
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 58 of 69
UEEPL
Specification for 415V NSPBD
PART 3.2 Section 4.1 3.2.7
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
SCHEDULE-S7
SCHEDULE OF DEVIATIONS
TABLE F-1 : TECHNICAL
Bid Reference Price of Clause No. deviation Page No. Vol No.
Spec Description
Detail of
Reasons for
Deviation
deviation
taken
We confirm that above are the only deviations from the Tender document and deviations appeared elsewhere in the Bid Proposal shall not be considered by the Purchaser. We also confirm that other than the deviations specified above, our offer complies in all respect to the purchase specification. Notes: 1. It is mandatory for the bidder to furnish Price of Deviation in the above Schedule of Deviation. 2. Acceptance or Non-acceptance of deviation is the sole discretion of the owner. 2. Additional sheets of similar size and format may be annexed as per bidder's requirement. 3. Deviations listed elsewhere will be summarily rejected and shall be ignored. 4. This schedule to be submitted with Technical Bid.
Company seal
Project
:
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Signature of Bidder
:
Name
:
Designation
:
Date
:
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 59 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART 3.2 Section 4.1 3.2.8
SCHEDULE-S8 SCHEDULE OF DELIVERIES
Project
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 60 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART 3.2 Section 4.1 3.2.9
SCHEDULE-S9
DRAWING/DOCUMENTS SUBMISSION SCHEDULE
DRAWING/DOCUMENT SUBMISSION SCHEDULE Sr. No.
Drawing/Document Title
Schedule Date of Submission from date of LOI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Project
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Name of Firm
:
Signature
:
Name
:
Designation
:
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 61 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART 3.2 Section 4.1 3.2.10
SCHEDULE-S10
PRICE BREAK-UP SPECIAL TOOLS & TACKLES S. N o.
Item Descri ption
1
2
Qty.
3
Unit Price
CIF (For spar es supp lied from abro ad) 4
Total Price
Exwork s (For indig enou s spar es)
CIF (For spares supplie d from abroa d)
Exwork s (For indig enou s spar es)
5
6=3x 4
7=3 x5
Seal of Company
Local Total Price Sales tax on transportati FOR site direct on charges transaction only (including inland Rate Amoun For For spares insurance, supplied Indige (%) t port nous from clearance abroad spares & port charges)
8
9
10 = 6 + 8+9
Name of Firm
:
Signature
:
Name
:
Designation
:
Date
:
11 = 7 +8+9
Note: 1. All the tools indicating the item-wise cost shall be submitted along with the bid. 2. Continuation sheets of like size and format may be used as per Bidders requirements and shall be annexed to this schedule for each system separately. *:
Project
Bidders at its option may quote the price of imported component in Indian Rupees (Bidders to specify).
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 62 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART 3.2 Section 4.1 3.2.11
SCHEDULE-S11
SCHEDULE OF SUB VENDOR LIST
Sr. No. 1 2 3 4 5 6
Project
Equipment Description
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Sub Vendor List
Rev 0 Page 63 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART 3.2 Section 4.1 3.2.12
SCHEDULE-S12
Not Applicable
Project
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 64 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART 3.2 Section 4.1 3.2.13 . 2 . 3 . 4 . 5 .
a .
b .
c .
d .
e .
f .
Project
SCHEDULE-S13
Bidder's Complete Company Name and address, tel no., fax no. and E-mail ID Bidder's Proposal Number Bidder's Proposal Date Bidder's proposal validity period Bidder's quoted price for the supply of complete busduct as follows, properly packed for transportation (Prices to be inclusive of all taxes and duties, but exclusive of transit insurance, spare parts, tools and charges for tests if any). 4000A NSPBD connecting 2500KVA 8 indoor dry type service transformer and 415V PMCC s e t s 4000A NSPBD connecting 2500KVA 2 out door oil filled service transformer and 415V PMCC s e t s 3200A NSPBD connecting 2000KVA 2 indoor dry type service transformer and 415V PMCC s e t s 3200A NSPBD connecting 2000KVA 2 out door oil filled service transformer and 415V PMCC s e t s 2500A NSPBD connecting 1600KVA 8 out door oil filled service transformer and 415V PMCC s e t s 2000A NSPBD connecting 1250KVA 2 out door oil filled service transformer s and 415V PMCC e t s
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rs
..
Rs
..
Rs
..
Rs
..
Rs
..
Rs
..
Rev 0 Page 65 of 69
UEEPL g .
h .
Project
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
1600A NSPBD connecting 1000KVA indoor dry type service transformer and 415V PMCC
1600A NSPBD connecting 1000KVA out door oil filled service transformer and 415V PMCC
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
2 s e t s 4 s e t s
Rs
..
Rs
..
Rev 0 Page 66 of 69
UEEPL
Specification for 415V NSPBD
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
PART 3.2 Section 4.1 3.2.14
SCHEDULE-S14
PRICE BREAKDOWN SHEET Sl. no. 1.
Description
Unit Rates (Rs.)
Terminal connector with adaptor box (3 ph) including flange, flexible connector at a.
PMCC side (set) for
i.
4000A
ii.
3200A
iii.
2500A
iv.
2000A
v.
1600A
vi. b.
Transformer side (set) for
i.
4000A
ii.
3200A
iii.
2500A
iv.
2000A
v.
1600A
Outdoor
Indoor
Outdoor
Indoor
vi. 2.
Non Segregated phase bus duct run (3 ph) a.
Straight run (meter)
i.
4000A
ii.
3200A
iii.
2500A
iv.
2000A
v.
1600A
vi.
Project
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 67 of 69
UEEPL
Specification for 415V NSPBD
Sl. no.
Description b.
90o horizontal bends (set)
i.
4000A
ii.
3200A
iii.
2500A
iv.
2000A
v.
1600A
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
Unit Rates (Rs.) Outdoor
Indoor
Outdoor
Indoor
Outdoor
Indoor
vi. c.
90o vertical bends (set)
i.
4000A
ii.
3200A
iii.
2500A
iv.
2000A
v.
1600A
vi. 3.
Flexible Expansion Connector (each) i.
4000A
ii.
3200A
iii.
2500A
iv.
2000A
v.
1600A
vi. 4.
Project
Flexible Bellows at a.
Straight run (set)
i.
4000A
ii.
3200A
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTP-II-NEE209-P-1001
Date : 05.11.2008
Rev 0 Page 68 of 69
UEEPL
Specification for 415V NSPBD
Sl. no.
2x300 MW Rosa Thermal Power Plant Stage-II,Shahjahanpur
Description iii.
2500A
iv.
2000A
v.
1600A
Unit Rates (Rs.)
vi. b.
Terminal equipment (set)
i.
4000A
ii.
3200A
iii.
2500A
iv.
2000A
v.
1600A
Outdoor
Indoor
vi. 5.
Bus Support Insulator (each)
6.
Wall frame assembly complete with seal off Bushing, mounting plate, flexible link etc. (set)
7.
Wall frame assembly complete without seal off Bushing, mounting plate, flexible link etc. (set)
8.
Phase crossover chamber (set) i.
4000A
ii.
3200A
iii.
2500A
iv.
2000A
v.
1600A
vi. 9.
Project
Galvanised Steel Support structure (T)
ROSA THERMAL POWER PROJECT STAGE II (2x300 MW)
Tender Document No:
UEEPL-RTPII-NEE-209-P-1001
Date : 05.11.2008
Rev 0 Page 69 of 55