TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

N : K

SUBSTRUCTURE Excavation and Earthwork Excavate topsoil average depth 150mm and cart away from site

72

m2

200.00

14,400.00

Excavate trench to receive foundation depth not exceeding 1.00m

23

m3

700.00

16,100.00

Excavate column base commencing from stripped level average depth exceeding 1.00m but not exceeding 2.00m to receive concrete base

0

m3

0

-

Ditto: working space to column bases and backfill

0

m3

0

-

ELEMENT NO.1

A

B

C

D

Ditto: Extra over E

F

sum

level and compact bottom of trench to receive concrete

29

m2

Earth work support Earth work support to vertical faces of excavation: Trench

0

m2

5,000.00

150.00

0

4,350.00

-

Treatment to surface Anti-termite treatment to all bottom of excavation. G

Trench

29

m2

150.00

4,350.00

H

Filling 300mm thick bed of approved imported laterite to make up level, well compacted to receive concrete (measured seperately)

12

m3

3,000.00

36,000.00

Backfill and ram selected material around excavation

12

m3

600.00

7,200.00

Remove surplus excavated materials from site

11

m3

1,400.00

15,400.00

CONCRETE WORKS (Sub-Structure) Blinding 50mm thick plain in-situ concrete ( 1:3:6 19mm aggregate) to blinding for column base

0

m2

Plain insitu concrete (1:3:6 - 20mm aggregate) poured into foundation

7

m3

19,500.00

136,500.00

Ditto: floor bed

6

m3

19,500.00

117,000.00

A

B

C

D

E

Page 1

0

-

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

Page total to collection

N : K

356,300.00

Sawn formwork to edges/sides of concrete works F

Edges of bed 150mm high

28

m

850.00

23,800.00

G

Damp proof 26" gauge polythene gauge applied on surface of hardcore to receive floor bed

40

m2

180.00

7,200.00

Block Work 225x225x450mm vibrated sandcrete hollow block laid in cement mortar (1:4) filled with weak concrete

31

m2

3,500.00

108,500.00

Rendering 12mm thick water resistant render in cement and sand (1:3) to internal wall surface of basement

22

m2

900.00

19,800.00

BRC B.R.C mesh fabric reinforcement A142 to basement floor bed

40

m2

500.00

20,000.00

H

J

A

page total to collection

179,300.00

COLLECTION PAGE 1

356,300.00

PAGE 2

179,300.00

Page 2

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

ELEMENT NO.1 SUBSTRUCTURE TO SUMMARY

N : K

535,600.00

ELEMENT NO.2 CONCRETEWORK Reinforced in-situ concrete (1:2:4-20mm aggregate) place well around reinforcement A

Lintel

1

m3

21,500.00

21,500.00

B

Roof beam

2

m3

21,500.00

43,000.00

Reinforcement High tensile reinforment bar to BS 4449 including bends, hooks and tying wire C

Lintel

105

kg

200.00

21,000.00

D

Roof beam

230

kg

200.00

46,000.00

Form Work Sawn formwork to concrete works at: E

Lintel

41

m

850.00

34,850.00

F

Sides of ring beam

56

m

850.00

47,600.00

Page 3

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

ELEMENT NO.2 CONCRETEWORK TO SUMMARY

N : K

213,950.00

ELEMENT NO.3 BLOCKWORK Vibrated sandcrete hollow blocks laid in strecher bond in cement and sand mortar (1:4) A

230mm

B

150mm

120

m2 m2

Page 4

2300

276,000.00

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

N : K

ELEMENT NO.3 BLOCKWORK TO SUMMARY

276,000.00

ELEMENT NO.4 FINISHES

A

WALL Rendering 12mm rendering to surfaces in cement and sand mortar (1:3) finished fair to: Wall

B

Ditto: edges not exceeding 300mm

C

Allow a sum for dressing of impressions on wall and concrete fascia

D

E

F

G

H

240

m2

900.00

216,000.00

49

m

300.00

14,700.00

Sum

25,000.00

12mm thick cement and sand backing floated backing to receive wall tiles (measured seperately) wall

20

m2

500.00

10,000.00

Tiling 200x300x6mm Royal glazed ceramic tile fixed with suitable adhesive

20

m2

1,450.00

29,000.00

0

m2

25mm cement and chipping terrazzo floor polished smooth

34

m2

Skirting 100mm high tiles skirting

35

m

46

m2

FLOOR Terrazzo 38mm floor screed in cement and sand (1:3) finished smooth

-

-

1,900.00

64,600.00

450.00

15,750.00

1,500.00

69,000.00

CEILING Ceiling

J

Asbestos ceiling fixed in 600x600mm bays to timber noggings (measured seperately)

Page 5

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

ELEMENT NO.4 FINISHES TO SUMMARY

N : K

444,050.00

ELEMENT NO.5 ROOF Long Span Roofing Aluminium Sheets 0.45mm gauged coloured aluminium roofing sheet laid with a minimum of 150mm sides and end laps measured net and fixed on timber purlin A

Covering

51

m2

B

1,800.00

91,800.00

Ridge cap not exceeding 600mm wide

0

m

700.00

-

C

Gutter 450mm

0

m

600.00

-

D

Angle eaves

20

m

500.00

10,000.00

Woodwork Sawn treated hardwood with tanalised preservative E

50x75mm purlin

69

m

220.00

15,180.00

F

50x150mm rafters

58

m

300.00

17,400.00

G

50x150mm struts

36

m

300.00

10,800.00

H

50x150mm tie beam

52

m

300.00

15,600.00

J

50x50mm noggins

204

m

110.00

22,440.00

K

25x230mm fascia

20

m

850.00

21,600.00

Page 6

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

ELEMENT NO.5 ROOF TO SUMMARY

N : K

204,820.00

ELEMENT NO.6 DOORS AND WINDOWS Aluminium Windows Foreign profile approved factory colour complete with frames with 5mm thick tinted glass and glazed with aluminium fixed lighting

A

Sliding 1200x1200mm

4

Nr

19,500.00

78,000.00

B

Ditto: 1000x900mm

1

Nr

18,000.00

18,000.00

C

Ditto: 600x600mm

1

Nr

9,000.00

9,000.00

1

Nr

29,000.00

29,000.00

Doors Steel Door Steel security door complete with all fittings and accessories; inclusive of a see through eye piece D

900 x 2100mm

Timber door Laminated timber core flush door fixed into wall; complete with all accessories: E

750x2100mm

2

Nr

12,500.00

25,000.00

F

900x2100mm

2

Nr

12,500.00

25,000.00

Page 7

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

ELEMENT NO.6 DOORS AND WINDOWS TO SUMMARY

N : K

184,000.00

ELEMENT NO.7 PAINTING AND DECORATION Emulsion Painting Prepare and apply one prime coat and two coats of Tex-ture paint to A

Wall

B

Edges not exceeding 300mm wide

240

m2

450.00

108,000.00

49

m

180.00

8,820.00

20

m

200.00

4,000.00

Gloss Painting Prime, Knot and apply gloss paint to: C

Fascia board

Page 8

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

ELEMENT NO.7 PAINTING AND DECORATION

N : K

120,820.00

ELEMENT NO.8 FIXTURES AND FITTINGS Kitchen Cabinet

A

Allow for kitchen furnitures of plywood 900mm high

2

Page 9

units

18,500.00

37,000.00

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

RATE

ELEMENT NO.8 FIXTURES AND FITTINGS TO SUMMARY

N : K

37,000.00

ELEMENT NO.9 SERVICES PLUMBING AND MECHANICAL Supply and fix the following sanitary fittings including assembling all components and making all necessary joints water tight in accordance with the manufacturer's instructions and leave in sound working order on completion

A

Low level close twyford water closet complete with fittings

1

Nr

18,500.00

18,500.00

B

Vitreous china wash hand basin size 450 x 50 x 350mm with fittings and pedestal

1

Nr

11,000.00

11,000.00

C

Floor drain

2

Nr

4,500.00

9,000.00

D

Shower mixer Tap complete with all accessories inclusive of rose

1

Nr

6,500.00

6,500.00

4mm thick 600mm x 500mm long polished plate mirror with bovelled and smoothened edges and drilled 4 times and including fixing to plugged wall with mild steel screws and dome headed chromium plated screw cover

0

Nr

4,500.00

E

Page 10

-

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

UNIT

Toilet roll holder; plastic roller and chromium plated body; length 100mm; screwed to wall with and including drive screws;

1

No

2,000.00

2,000.00

G

Towel holder made of stainless steel

1

No

3,000.00

3,000.00

H

Include provisional sum seventy thousand naira (N70,000.00) for piping works in connection with plumbing installation and making good; inclusive of 2Nr Septic Tank and Soakaway.

F

RATE

N : K

Sum

70,000.00

Sum

98,000.00

ELECTRICAL INSTALLATION

J

Include sum of Ninety-Eight thousand naira (N98,000.00) for electrical installation and lighting fittings

ELEMENT NO.9 SERVICES

218,000.00

SUMMARY 1.00 SUBSTRUCTURE

535,600.00

2.00 SUPER-STRUCTURE 2.01 Block Work

276,000.00

2.02 Concrete Work

213,950.00

2.03 Finishes

444,050.00

2.04 Roof

204,820.00

2.05 Doors and Windows

184,000.00

2.06 Painting and Decoration

120,820.00

2.07 Fixtures and Fittings

37,000.00

2.08 Services

218,000.00

TOTAL

2,234,240.00

Page 11

TWO ROOMS SELF CONTAIN @ KEFFI ITEM

DESCRIPTION

QTY

Add Preliminary

UNIT

RATE

N : K

111,712.00

GRAND TOTAL [PRODUCTION VALUE]

###

Page 12

Related Documents

Room
November 2019 32
Room
November 2019 28
Self
May 2020 41
Self
June 2020 42
Self
May 2020 32

More Documents from ""