Nama : Mega Selvi NIM : 2007020006
Jadwal Penggantian Sparepart Pada Pabrik Kelapa Sawit Produksi Kebun = 2 ton/ha/bln Kapasitas Kebun = 288000 Ton/ha/thn Luas Kebun = 12000 ha Libur Minggu = 54 hari Libur Lebaran = 7 hari Libur Lain-Lain = 16 hari Kapasitas Pabrik= 60 tph Kapasitas pabrik/hari = 1000 jam Jam Olah = 17 jam Kapasitas Lori = 3 ton/lori
No.
1
2
Station Group
Equipment
Pressing
Keterangan
20 % Ttl Cages Replacement Cycle/YR
Penggantian dilakukan 24 kali/thn dan 4 cages setiap kali ganti
Capstan
Wire Rope
0,01 Meters/Ton FFB
Penggantian wire rope = 2280 meter
1)
Sterilizer 60 TPH
Door Packing
3 Pieces/Door/YR
4 buah sterilizer=24 pieces/yr dan 4 pieces sekali ganti
1)
Horizontal-Bunch Conveyors
Chain
14000 HRS
Penggantian dilakukan setiap 823 HK
Sprocket
7000 HRS
Penggantian dilakukan setiap 411 HK
1)
Inclined-Bunch Conveyors
Chain
9500 HRS
Penggantian dilakukan setiap 558 HK
1)
Inclined-Bunch Conveyors
Sprocket
4000 HRS
Penggantian dilakukan setiap 235 HK
2)
Hoist
Endless Chain
70000 tons FFB/Set Cahin
Penggantian 4 kali masing-masing 1 set
Sprockets
36500 tons FFB/Set Sprocket
Penggantian 8 kali masing-masing 1 set
Wire Rope
Jumlah wire rope 374,4 meter, 1,3 Meters/1000 Tons FFB dilakukan 4 kali penggantian @ 93,6 meter
Liner
11000 HRS
Penggantian dilakukan setiap 647 HK
Scroll
11000 HRS
Penggantian dilakukan setiap 647 HK
3)
3
Standart
1). Cap Cages 2,50 ; 2,75 ; 3,75 ton
Cages (Using Hosting Loading Ramp Crane)
Sterilizer
Parts
Conveyor Below Thresher
4)
Thresher
Flat Bars
700000 Tons FFB/Thresher
Penggantian dilakukan setiap 700 HK
1)
Fruit Elevator
Buckets
5 % of Total/YR/Unit of Elevator
Penggantian dilakukan sebanyak 3 buckets/YR
Januari 1
2
3
Februari 4
1
2
3
Maret 4
1
2
3
April 4
5
1
2
3
Mei 4
1
2
3
Juni 4
5
1
2
3
Juli 4
1
2
3
Agustus 4
1
2
3
4
September 5
1
2
3
4
Oktober 5
1
2
3
November 4
1
2
3
4
Desember 5
1
2
7500 HRS
Penggantian dilakukan setiap 441 HK
2) Fruit Distributing Conveyor, Bottom Cross Conveyor, Top Cross Liner Conveyor, Recycling Fruit Conveyor
12500 HRS
Penggantian dilakukan setiap 735 HK
Scroll
12500 HRS
Penggantian dilakukan setiap 735 HK
Expeller Arms
3000 HRS
Penggantian dilakukan setiap 176 HK
Liner, Baffles & Bottom 8000 Plate HRS
Penggantian dilakukan setiap 470 HK
Shaft
21000 HRS
Penggantian dilakukan setiap 1235 HK
Stirring Arms
3000 HRS
Penggantian dilakukan setiap 176 HK
Bearing
10500 HRS
Penggantian dilakukan setiap 617 HK
Adjusting Cone
3000 HRS
Penggantian dilakukan setiap 176 HK
Bushing for Lenghtening Shaft
1100 HRS/SET
Penggantian dilakuan setiap 66 HK/Set
Chain
3)
4)
Digester
Screw Press
4.1) Screw Press-P15
5)
4
Nut and Kernel 1)
2)
Cake Breaker Conveyor
Ripple Mill
Elevators
Lenghtening Shaft 3500 HRS
Penggantian dilakukan setiap 206 HK
Press Cage
2500 HRS
Penggantian dilakukan setiap 147 HK
Strainer Plate
11000 HRS
Penggantian dilakukan setiap 647 HK
Worm Screws
1000 HRS
Penggantian dilakukan setiap 59 HK
Liner
7000 HRS
Penggantian dilakukan setiap 412 HK
Scroll
7000 HRS
Penggantian dilakukan setiap 412 HK
Ripple Plate
900 HRS/SET/Unit
Pengagntian dilakukan setiap 54 HK
Rotor Bar
600 HRS/SET/Unit
Penggantian dilakukan setiap 36 HK
Rotor Plates
1200 HRS/SET/Unit
Penggantian dilakukan setiap 72 HK
Stator Bar
600 HRS/SET/Unit
Penggantian dilakukan setiap 36 HK
Buckets
Dry---> 5 % Total Buckets/YR
Penggantian dilakukan sebanyak 3 buckets/YR
Wet---> 10 % Total Buckets/YR
Penggantian dilakukan sebanyak 5 buckets/YR
Chain
Sprockets
5
Clarification
Dry---> 8500 HRS
Penggantian dilakukan setiap 510 HK
Wet--->3500 HRS
Penggantian dilakukan setiap 210 HK
Dry---> 3500 HRS
Penggantian dilakukan setiap 210 HK
Wet--->2500 HRS
Penggantian dilakukan setiap 150 HK
6)
Fiber Cyclone
Airlock
11000 HRS
Penggantian dilakukan setiap 647 HK
6)
Kernel Silo
Airlock
26000 HRS
Penggantian dilakukan setiap 1529 HK
6)
LTDS Cyclone
Airlock
5500 HRS
Penggantian dilakukan setiap 323 HK
6)
Nut Cyclone
Airlock
11500 HRS
Penggantian dilakukan setiap 676 HK
6)
Umpan Ripple Mill Airlock
21000 HRS
Penggantian dilakukan setiap 1235 HK
1)
Crude Oil Vibrating Bearing Screen
11000 HRS
Penggantian dilakukan setiap 647 HK
Screens
60 TPH = 4 Screens/YR
4 screen/YR
Liner
6000 HRS
Penggantian dilakukan setiap 323 HK
Scrool
3000 HRS
Penggantian dilakukan setiap 176 HK
2)
Solids Conveyor
3)
Sand Cyclone
Keramik Cone
2 Pieces/Unit/YR
Penggantian dilakuakn 2 unit/pieces/YR
4)
Sludge Vibrating Screen
Clamp Rings
60 TPH = 1,5 Clamps/YR
1,5 clamps/YR
Hycer Gasket
60 TPH = 4 Gasket/YR
4 gaskets/YR
Screens
60 TPH = 4 Screens/YR
4 screen/YR
11000 HRS
Penggantian dilakukan setiap 647 HK
Cap Nut
3000 HRS/PC
Penggantian dilakukan setiap 428 HK/PC
Lock Nut
5500 HRS/PC
Penggantian dilakukan setiap 324 HK/PC
Nozzle Holder
5500 HRS/PC
Penggantian dilakukan setiap 324 HK/PC
Nozzles
3000 HRS/Nozzle
Penggantian dilakuakan setiap 428 HK/Nozzle
5)
Sludge Centrifuge Bearing
6
7
Boiler
Empty Bunch
1)
ID Fan
Impeller
1 Unit/17000 HRS/Boiler
1 unit/1000 HK/boiler
2)
Dust Cyclone
Cyclones
1 Set/8000 HRS/Unit Boiler
Penggantian dilakukan setiap 941 HK
5)
Fuel Conveyor
Liners
16000 HRS
Penggantian dilakukan setiap 941 HK
Scrool
16000 HRS
Penggantian dilakukan setiap 941 HK
Chain
16000 HRS
Penggantian dilakukan setiap 941 HK
Sprocket-2 Sets
8000 HRS
Penggantian dilakukan setiap 470 HK
Chain
8500 HRS
Penggantian dilakukan setiap 500 HK
Sprocket-2 Sets
4500 HRS
Penggantian dilakukan setiap 265 HK
Chain
16500 HRS
Penggantian dilakukan setiap 970 HK
Sprocket-2 Sets
8500 HRS
Penggantian dilakukan setiap 500 HK
1)
2)
3)
EB. Horizontal Conveyor
EB. Inclined Conveyor
Bunch Crusher Elevator
Desember 3
4
5
Keterangan
Penggantian ke-1 setiap Januari 2009, maka penggantian selanjutnya setiap minggu ke-2 November 2011 Penggantian ke-1 setiap awal Februari 2009, maka penggantian selanjutnya setiap akhir Juli 2010 Penggantian ke-2 setiap April 2009, maka penggantian selanjutnya setiap minggu ke-3 Agustus 2011 Penggantian ke-1 setiap minggu ke-2 Januari 2009, maka penggantian selanjutnya setiap minggu ke-3 Mei 20011
Penggantian ke-1 setiap akhir Mei 2009, maka penggantian selanjutnya setiap minggu ke-3 April 2011 Penggantian ke-1 setiap akhir Juni 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Mei 2011 Penggantian pertama dilakukan akhir September 2009, maka penggantian selanjutnya dilakukan setiap awal April 2012
Penggantian ke-1 setiap awal Maret 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 September 2011 Penggantian ke-1 setiap akhir Desember 2009, maka penggantian seelanjutnya dilakukan setiap minggu ke-3 Juli 2012 Penggantian ke-1 setiap akhir November 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Juni 20012
Penggantian ke-1 setiap awal September 2009, maka penggantian selanjutnya dilakukan setiap awal Agustus 2011 Penggantian ke-1 setiap awal Desember 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Juni 2015
Penggantian ke-1 setiap akhir Maret 2009, maka penggantian selanjutnya dilakukan setiap akhir Oktober 2011
Penggantian pertama setiap awal Oktober 2009, maka penggantian dilakukan selanjutnya setiap awal Agustus 2010
Penggantian ke-1 setiap akhir Juli 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Juni 2012
Penggantian ke-1 setiap minggu ke-3 September 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Juli 2011 Penggantian ke-1 setiap minggu ke-3 Agustus 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Juni 2011
Penggantian ke-1 dilakukan setiap akhir Maret 2009 maka penggantian selanjutnya dilakukan setiap minggu ke- Juni 2011
Penggantian pertama dilakukan setiap akhir Agustus 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Mei 2010
Penggantian ke-1 setiap akhir Mei 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 April 2012 Penggantian ke-1 setiap akhir Oktober 2009, amak penggantian selanjutnya dilakukan setiap awal Agustus 2015 Penggantian ke-1 setiap awal November 2009, maka penggantian selanjutnya setiap minggu ke-2 Mei 2011 Penggantian ke-1 setiap awal Juli 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Juni 2012 Penggantian ke-1 setiap akhir September 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 April 2015 Penggantian ke-1 setiap minggu ke-4 Maret 2009, maka penggantian selanjutnya dilakukan setiap akhir November 2011
Penggantian pertama setiap awal Mei 2009, maka penggantian selanjutnya dilakukan setiap akhir Agustus 2010
Penggantian ke-1 setiap akhir Juni 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Mei 2012 Penggantian ke-1 setiap minggu ke-2 Mei 2009, maka penggantian selanjutnya dilakukan setiap akhir November 2010 Penggantian ke-1 setiap minggu ke-3 Juli 2009, maka penggantian selanjutnya dilakukan setiap akhir September 2010 Penggantian ke-1 setiap minggu ke-3 Agustus 2009, maka penggantian selanjutnya dilakukan setiap akhir November 2010 Penggantian ke-1 setiap minggu ke-2 Februari, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Mei 2012
Penggantian ke-1 dilakukan setiap minggu ke-3 Januari 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Juni 2012 Penggantian ke-1 akhir Maret 2009, maka penggantian selanjutnya dilakukan akhir Juli 2012 Penggantian pertama akhir Mei 2009, maka penggantian selanjutnya dilakukan akhir Juli 2012 Penggantian pertama akhir Agustus 2009, maka penggantian selanjutnya dilakukan akhir November 2012 Penggantian ke-1 akhir Desember 2009, maka penggantian selanjutnya dilakukan setiap akhir Maret 2013 Penggantian ke-1 setiap awal Maret 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Oktober 2010 Penggantian pertama setiap awal April 2009, maka penggantian selanjutnya dilakukan setiap akhir Desember 2010
Penggantian ke-1 setiap minggu ke-2 Desember 2009, maka penggantian selanjutnya dilakukan setiap akhir Mei 2014 Penggantian ke-1 setiap awal Mei 2009, maka penggantian selanjutnya dilakukan setiap akhir Januari 2011
Biaya Gaji Karyawan Pada PT. Bias Senja BHL = 1/7*Upah/hari SKUH = 3/20 * Upah/hari SKUB = 1/173 * Upah/bulan Jumlah jam lembur = 1,75 jam Jumlah jam kerja = 24 HK Upah per hari = Rp. 30.000 No.
Nama
Jabatan
Status
Gaji Pokok
Lembur
Gaji Pokok + Lembur/Bln
Januari
Februari
Maret
April
Mei
Juni
Juli
Agustus
September
1
Aji
Mandor
SKU-B
1,500,000
364,162
1,864,162
1,864,162
1,864,162
1,864,162
1,864,162
1,864,162
1,864,162
1,864,162
1,864,162
1,864,162
2
Joko
Wakil Mandor
SKU-B
1,350,000
327,746
1,677,746
1,677,764
1,677,764
1,677,764
1,677,764
1,677,764
1,677,764
1,677,764
1,677,764
1,677,764
3
Sukir
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
4
Jadi
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
5
Dedi
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
6
Kirman
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
7
Sahat
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
8
Jono
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
9
Murdi
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
10
Salut
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
11
Ramlan
Teknisi
SKU-B
1,100,000
267,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
1,367,052
12
Arif
Teknisi
SKU-B
950,000
230,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
13
Mustakim
Teknisi
SKU-B
950,000
230,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
14
Wardi
Teknisi
SKU-B
950,000
230,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
15
Kardi
Teknisi
SKU-B
950,000
230,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
1,180,636
16
Heri
Teknisi
SKU-B
850,000
206,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
17
Sulaiman
Teknisi
SKU-B
850,000
206,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
18
Warno
Teknisi
SKU-B
850,000
206,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
1,056,358
19
Saiful
Teknisi
SKU-H
800,000
210,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
20
Budi
Teknisi
SKU-H
800,000
210,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
21
Sitorus
Teknisi
SKU-H
800,000
210,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
22
Pangaribuan
Teknisi
SKU-H
800,000
210,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
23
Markus
Teknisi
SKU-H
800,000
210,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
1,010,000
24
Seno
Teknisi
BHL
700,000
175,000
875,000
875,000
875,000
875,000
875,000
875,000
875,000
875,000
875,000
875,000
25
Ratman
Teknisi
BHL
700,000
175,000
875,000
875,000
875,000
875,000
875,000
875,000
875,000
875,000
875,000
875,000
30,536,994
30,536,994
30,536,994
30,536,994
30,536,994
30,536,994
30,536,994
30,536,994
30,536,994
30,536,994
Total
ja
Oktober
November
Desember
Gaji Pokok + Lembur/Thn
1,864,162
1,864,162
1,864,162
22,369,944
1,677,764
1,677,764
1,677,764
20,133,168
1,367,052
1,367,052
1,367,052
16,404,624
1,367,052
1,367,052
1,367,052
16,404,624
1,367,052
1,367,052
1,367,052
16,404,624
1,367,052
1,367,052
1,367,052
16,404,624
1,367,052
1,367,052
1,367,052
16,404,624
1,367,052
1,367,052
1,367,052
16,404,624
1,367,052
1,367,052
1,367,052
16,404,624
1,367,052
1,367,052
1,367,052
16,404,624
1,367,052
1,367,052
1,367,052
16,404,624
1,180,636
1,180,636
1,180,636
14,167,632
1,180,636
1,180,636
1,180,636
14,167,632
1,180,636
1,180,636
1,180,636
14,167,632
1,180,636
1,180,636
1,180,636
14,167,632
1,056,358
1,056,358
1,056,358
12,676,296
1,056,358
1,056,358
1,056,358
12,676,296
1,056,358
1,056,358
1,056,358
12,676,296
1,010,000
1,010,000
1,010,000
12,120,000
1,010,000
1,010,000
1,010,000
12,120,000
1,010,000
1,010,000
1,010,000
12,120,000
1,010,000
1,010,000
1,010,000
12,120,000
1,010,000
1,010,000
1,010,000
12,120,000
875,000
875,000
875,000
10,500,000
875,000
875,000
875,000
10,500,000
30,536,994
30,536,994
30,536,994
366,443,928
Jumlah Biaya Penggantian Sparepart Tahun 2009 Pada PT. Bias Senja Produksi Kebun = 2 ton/ha/bln Kapasitas Kebun = 288000 ton/thn Luas Kebun = 12000 ha Libur Minggu = 54 hari Libur Lebaran = 7 hari Libur Lain-Lain = 16 hari Kapasitas Pabrik = 60 tph Kapasitas pabrik/hari = 1000 jam Jam Olah = 17 jam Kapasitas Lori = 3 ton/lori Jumlah HK = 288 HK
No.
1
2
Station Group
Loading Ramp
Sterilizer
Equipment
Pressing
Standart
Keterangan
Jumlah
Harga
Cages (Using Hosting Crane)
1). Cap Cages 20 % Ttl Cages 2,50 ; 2,75 ; 3,75 Replacement ton Cycle/YR
Penggantian dilakukan 24 kali/thn dan 4 cages setiap kali ganti
15 juta/ea
Capstan
Wire Rope
0,01 Meters/Ton FFB
Penggantian wire rope = 2280 meter
23 rb/meter
1)
Sterilizer 60 TPH
Door Packing
3 Pieces/Door/YR
4 buah sterilizer=24 pieces/yr dan 4 pieces sekali ganti
4 Sterilizer
1)
Horizontal-Bunch Chain Conveyors
14000 HRS
Penggantian dilakukan setiap 823 HK
1 Conveyor (2 side)
Sprocket
7000 HRS
Penggantian dilakukan setiap 411 HK
1)
Inclined-Bunch Conveyors
Chain
9500 HRS
Penggantian dilakukan setiap 558 HK
1)
Inclined-Bunch Conveyors
Sprocket
4000 HRS
Penggantian dilakukan setiap 235 HK
2)
Hoist
Endless Chain
70000 tons FFB/Set Penggantian 4 kali Cahin masing-masing 1 set
Sprockets
36500 tons FFB/Set Penggantian 8 kali Sprocket masing-masing 1 set
3)
3
Parts
Conveyor Below Thresher
Wire Rope
1,3 Meters/1000 Tons FFB
Jumlah wire rope 374,4 meter, dilakukan 4 kali penggantian @ 93,6 meter
Liner
11000 HRS
Penggantian dilakukan setiap 647 HK
Scroll
11000 HRS
Penggantian dilakukan setiap 647 HK Penggantian dilakukan setiap 700 HK
4)
Thresher
Flat Bars
700000 Tons FFB/Thresher
1)
Fruit Elevator
Buckets
5 % of Total/YR/Unit Penggantian dilakukan of Elevator sebanyak 3 buckets/YR
Chain
7500 HRS
Penggantian dilakukan setiap 441 HK
Liner
12500 HRS
Penggantian dilakukan setiap 735 HK
Scroll
12500 HRS
Penggantian dilakukan setiap 735 HK
Expeller Arms
3000 HRS
Penggantian dilakukan setiap 176 HK
2) Fruit Distributing Conveyor, Bottom Cross Conveyor, Top Cross Conveyor, Recycling Fruit Conveyor
3)
Digester
Liner, Baffles & Bottom Plate
8000 HRS
Penggantian dilakukan setiap 470 HK
Januari
2 Hoist crane (2 side)
3 Threshing
April
Mei
60,000,000
728,000
728,000
1,300,000
950 rb/ea
1,900,000
56 rb/meter
5,241,600
1,300,000
1,900,000
1,900,000
1,900,000
5,241,600
1,975 jt/conveyor
728,000
728,000
1,300,000
1,900,000
1,900,000
1,900,000
5,241,600
5,925,000
4,350,000
28,500,000
1,683,000
300 rb/side
600,000
1,975 jt/conveyor
1,45 jt/conveyor 4 mesin press (1 Expeller arms/digester)
November
60,000,000
1,300,000
1,45 jt/conveyor
Masing-masing conveyor
60,000,000
Oktober
736,000
650 rb/ea
187 rb/bucket
September
1,660,000
415,000
3 Elevator
Agustus
736,000
415 rb/ea
9,5 jt/treshing
Juli
60,000,000
728,000
368 rb/side
3 Threshing
Juni
52,440,000
415 rb/ea
1 Conveyor (2 side)
Maret
60,000,000
182 rb/ea
368 rb/side
Februari
674 rb/ea 1,2 jt/liner ; 450 rb/bafle digester ; 2,1 jt/bottom plate digester
5,800,000
2,696,000
2,696,000
10,050,000
4)
Screw Press
4.1) Screw Press-P15
5)
4
Nut and Kernel 1)
2)
Cake Breaker Conveyor
Ripple Mill
Elevators
Shaft
21000 HRS
Penggantian dilakukan setiap 1235 HK
2,75 jt/ea
Stirring Arms
3000 HRS
Penggantian dilakukan setiap 176 HK
1,5 jt/digester
Bearing
10500 HRS
Penggantian dilakukan setiap 617 HK
2,85 jt/ea
Adjusting Cone
3000 HRS
Penggantian dilakukan setiap 176 HK
987 rb/ea
Bushing for Lenghtening Shaft
1100 HRS/SET
Penggantian dilakuan setiap 66 HK/Set
2 Bushing for lenghtening shaft
244 rb/ea
Lenghtening Shaft
3500 HRS
Penggantian dilakukan setiap 206 HK
2 Lenghtening Shaft
2,05 jt/ea
Press Cage
2500 HRS
Penggantian dilakukan setiap 147 HK
4,945 jt/ea
Strainer Plate
11000 HRS
Penggantian dilakukan setiap 647 HK
785 rb/ea
Worm Screws
1000 HRS
Penggantian dilakukan setiap 59 HK
Liner
7000 HRS
Penggantian dilakukan setiap 412 HK
1,975 jt/conveyor
Scroll
7000 HRS
Penggantian dilakukan setiap 412 HK
1,45 jt/conveyor
Ripple Plate
900 HRS/SET/Unit
Penggantian dilakukan setiap 54 HK
Rotor Bar
600 HRS/SET/Unit
Penggantian dilakukan setiap 36 HK
Buckets
Dry---> 5 % Total Buckets/YR
Penggantian dilakukan sebanyak 3 buckets/YR
Wet---> 10 % Total Penggantian dilakukan Buckets/YR sebanyak 5 buckets/YR
Chain
Sprockets
5
Clarification
2 Worm Screws
4 Ripple mill
5,175 jt/ea
625 rb/ripple mill
4 Elevators
155 rb/buckets
1 Elevator
155 rb/buckets
3,948,000
1,952,000
3,140,000
41,400,000
41,400,000
2,304,000
2,500,000
2,500,000
2,304,000
2,500,000
1 Elevator
1,1 jt/side
2,200,000
Dry---> 3500 HRS
Penggantian dilakukan setiap 210 HK
4 Elevators
800 rb/ea
Wet--->2500 HRS
Penggantian dilakukan setiap 150 HK
1 Elevator
800 rb/ea
Kernel Silo
Airlock
26000 HRS
Penggantian dilakukan setiap 1529 HK
2 Kernel silo
1,35 jt/ea
6)
LTDS Cyclone
Airlock
5500 HRS
Penggantian dilakukan setiap 323 HK
2 LTDS
1,35 jt/ea
6)
Nut Cyclone
Airlock
11500 HRS
Penggantian dilakukan setiap 676 HK
1 Nut transport
1,35 jt/ea
6)
Umpan Ripple Mill Airlock
21000 HRS
Penggantian dilakukan setiap 1235 HK
4 Ripple mill
1,35 jt/ea
1)
Crude Oil Vibrating Screen
Bearing
11000 HRS
Penggantian dilakukan setiap 647 HK
3 Vibrating screen ; 2 ea/screen
1,25 jt/ea
Screens
60 TPH = 4 Screens/YR
4 screen/YR
Liner
6000 HRS
Penggantian dilakukan setiap 323 HK
2,500,000
2,500,000
2,500,000
2,304,000
2,500,000
2,500,000
2,500,000
12,800,000
3,200,000
3,200,000
2,700,000
2,700,000
2,700,000
1,350,000
5,400,000
7,500,000
1,55 jt/ea
1,975 jt/conveyor
2,500,000
2,304,000
775,000
Penggantian dilakukan setiap 210 HK
6)
2,304,000
1,860,000
Wet--->3500 HRS
1,35 jt/ea
41,400,000
1,450,000
8,800,000
2 Fiber cyclone
41,400,000
1,975,000
1,1 jt/side
Penggantian dilakukan setiap 647 HK
1,952,000
19,780,000
4 Elevators
11000 HRS
1,952,000
16,400,000
Penggantian dilakukan setiap 510 HK
Airlock
3,948,000
1,952,000
Dry---> 8500 HRS
Fiber Cyclone
Solids Conveyor
6,000,000
22,800,000
576 rb/ripple mill
6)
2)
6,000,000
9,300,000
1,975,000
4)
5)
6
7
Boiler
Empty Bunch
Sludge Vibrating Screen
Scrool
3000 HRS
Penggantian dilakukan setiap 176 HK
Clamp Rings
60 TPH = 1,5 Clamps/YR
1,5 clamps/YR
Hycer Gasket
Screens
1,45 jt/conveyor
Double deck ; 1 Vibra screen
215 rb/ea
60 TPH = 4 Gasket/YR 4 gaskets/YR
2 Hycer Gasket
85 rb/ea
60 TPH = 4 Screens/YR
4 screen/YR
2 Screens
1,55 jt/ea
11000 HRS
Penggantian dilakukan setiap 647 HK
8 Sludge centrifugde 6000 ltr/jm ; 2 bearing/centrifu dge
1,87 jt/ea
Cap Nut
3000 HRS/PC
Penggantian dilakukan setiap 428 HK/PC
6 Cap nut
96 rb/ea
Lock Nut
5500 HRS/PC
Penggantian dilakukan setiap 324 HK/PC
6 Lock nut
56 rb/ea
Nozzle Holder
5500 HRS/PC
Penggantian dilakukan setiap 324 HK/PC
6 Nozzle Holder
Nozzles
3000 HRS/Nozzle
Penggantian dilakuakan setiap 428 HK/Nozzle
6 Nozzles
2 Boiler 20 ton/jam 4,25 jt/ea
Sludge Centrifuge Bearing
Impeller
1 Unit/17000 HRS/Boiler
1 unit/1000 HK/boiler
2)
Dust Cyclone
Cyclones
1 Set/8000 HRS/Unit Boiler
Penggantian dilakukan setiap 941 HK
5)
Fuel Conveyor
Liners
16000 HRS
Penggantian dilakukan setiap 941 HK
Scrool
16000 HRS
Penggantian dilakukan setiap 941 HK
Chain
16000 HRS
Penggantian dilakukan setiap 941 HK
Sprocket-2 Sets
8000 HRS
Penggantian dilakukan setiap 470 HK
515 rb/ea
Chain
8500 HRS
Penggantian dilakukan setiap 500 HK
468 rb/side
Sprocket-2 Sets
4500 HRS
Penggantian dilakukan setiap 265 HK
515 rb/ea
Chain
16500 HRS
Penggantian dilakukan setiap 970 HK
378 rb/side
Sprocket-2 Sets
8500 HRS
Penggantian dilakukan setiap 500 HK
485 rb/ea
2)
3)
EB. Horizontal Conveyor
EB. Inclined Conveyor
Bunch Crusher Elevator
Jumlah
430,000
680,000
29,920,000
570,000
336,000
804,000
43 rb/ea
ID Fan
258,000
8,500,000
3 jt/ea
1 Conveyor
1,450,000
134 rb/ea
1)
1)
1,450,000
6,000,000
2,375 jt/conveyor
2,375,000
1,85 jt/conveyor
1 Conveyor (2 side)
1,850,000
468 rb/side
2,060,000
936,000
2,060,000
1,940,000 126,748,600
18,602,000
55,810,000
112,645,600
28,243,000
121,482,000
59,326,000
103,855,600
54,315,000
129,284,000
69,288,000
Tahun 2009 Pada PT. Bias Senja
Desember
60,000,000
Biaya per Tahun
360,000,000
52,440,000
728,000
4,368,000
736,000
1,660,000
736,000
415,000
5,200,000
1,900,000
5,241,600
15,200,000
20,966,400
5,925,000
4,350,000
28,500,000
1,683,000
600,000
7,900,000
7,900,000
5,800,000
5,392,000
10,050,000
11,000,000
11,000,000
12,000,000
22,800,000
7,896,000
7,808,000
16,400,000
19,780,000
39,560,000
3,140,000
41,400,000
207,000,000
1,975,000
1,450,000
2,304,000
2,500,000
13,824,000
27,500,000
1,860,000
775,000
8,800,000
2,200,000
4,400,000
12,800,000
6,400,000
2,700,000
2,700,000
2,700,000
1,350,000
5,400,000
7,500,000
9,300,000
1,975,000
2,900,000
430,000
680,000
12,400,000
12,400,000
29,920,000
570,000
336,000
804,000
258,000
8,500,000
6,000,000
2,375,000
1,850,000
936,000
936,000
2,060,000
936,000
2,060,000
756,000
4,120,000
756,000
1,940,000 171,105,600
1,050,705,400
Jumlah Biaya Pada PT. Bias Senja No. 1.
2. 3. 4. 5.
Keterangan Total Biaya - Biaya penggantian sparepart - Biaya gaji karyawan & lembur Jumlah Produksi TBS/Thn Produksi CPO/Thn Rupiah/Kg TBS Rupiah/Kg CPO
ada PT. Bias Senja Biaya Rp1,050,705,400 Rp366,443,928 Rp1,417,149,328 Rp288,000 Rp64,800 Rp5 Rp22