Nama : Mega Selvi NIM : 2007020006

Jadwal Penggantian Sparepart Pada Pabrik Kelapa Sawit Produksi Kebun = 2 ton/ha/bln Kapasitas Kebun = 288000 Ton/ha/thn Luas Kebun = 12000 ha Libur Minggu = 54 hari Libur Lebaran = 7 hari Libur Lain-Lain = 16 hari Kapasitas Pabrik= 60 tph Kapasitas pabrik/hari = 1000 jam Jam Olah = 17 jam Kapasitas Lori = 3 ton/lori

No.

1

2

Station Group

Equipment

Pressing

Keterangan

20 % Ttl Cages Replacement Cycle/YR

Penggantian dilakukan 24 kali/thn dan 4 cages setiap kali ganti

Capstan

Wire Rope

0,01 Meters/Ton FFB

Penggantian wire rope = 2280 meter

1)

Sterilizer 60 TPH

Door Packing

3 Pieces/Door/YR

4 buah sterilizer=24 pieces/yr dan 4 pieces sekali ganti

1)

Horizontal-Bunch Conveyors

Chain

14000 HRS

Penggantian dilakukan setiap 823 HK

Sprocket

7000 HRS

Penggantian dilakukan setiap 411 HK

1)

Inclined-Bunch Conveyors

Chain

9500 HRS

Penggantian dilakukan setiap 558 HK

1)

Inclined-Bunch Conveyors

Sprocket

4000 HRS

Penggantian dilakukan setiap 235 HK

2)

Hoist

Endless Chain

70000 tons FFB/Set Cahin

Penggantian 4 kali masing-masing 1 set

Sprockets

36500 tons FFB/Set Sprocket

Penggantian 8 kali masing-masing 1 set

Wire Rope

Jumlah wire rope 374,4 meter, 1,3 Meters/1000 Tons FFB dilakukan 4 kali penggantian @ 93,6 meter

Liner

11000 HRS

Penggantian dilakukan setiap 647 HK

Scroll

11000 HRS

Penggantian dilakukan setiap 647 HK

3)

3

Standart

1). Cap Cages 2,50 ; 2,75 ; 3,75 ton

Cages (Using Hosting Loading Ramp Crane)

Sterilizer

Parts

Conveyor Below Thresher

4)

Thresher

Flat Bars

700000 Tons FFB/Thresher

Penggantian dilakukan setiap 700 HK

1)

Fruit Elevator

Buckets

5 % of Total/YR/Unit of Elevator

Penggantian dilakukan sebanyak 3 buckets/YR

Januari 1

2

3

Februari 4

1

2

3

Maret 4

1

2

3

April 4

5

1

2

3

Mei 4

1

2

3

Juni 4

5

1

2

3

Juli 4

1

2

3

Agustus 4

1

2

3

4

September 5

1

2

3

4

Oktober 5

1

2

3

November 4

1

2

3

4

Desember 5

1

2

7500 HRS

Penggantian dilakukan setiap 441 HK

2) Fruit Distributing Conveyor, Bottom Cross Conveyor, Top Cross Liner Conveyor, Recycling Fruit Conveyor

12500 HRS

Penggantian dilakukan setiap 735 HK

Scroll

12500 HRS

Penggantian dilakukan setiap 735 HK

Expeller Arms

3000 HRS

Penggantian dilakukan setiap 176 HK

Liner, Baffles & Bottom 8000 Plate HRS

Penggantian dilakukan setiap 470 HK

Shaft

21000 HRS

Penggantian dilakukan setiap 1235 HK

Stirring Arms

3000 HRS

Penggantian dilakukan setiap 176 HK

Bearing

10500 HRS

Penggantian dilakukan setiap 617 HK

Adjusting Cone

3000 HRS

Penggantian dilakukan setiap 176 HK

Bushing for Lenghtening Shaft

1100 HRS/SET

Penggantian dilakuan setiap 66 HK/Set

Chain

3)

4)

Digester

Screw Press

4.1) Screw Press-P15

5)

4

Nut and Kernel 1)

2)

Cake Breaker Conveyor

Ripple Mill

Elevators

Lenghtening Shaft 3500 HRS

Penggantian dilakukan setiap 206 HK

Press Cage

2500 HRS

Penggantian dilakukan setiap 147 HK

Strainer Plate

11000 HRS

Penggantian dilakukan setiap 647 HK

Worm Screws

1000 HRS

Penggantian dilakukan setiap 59 HK

Liner

7000 HRS

Penggantian dilakukan setiap 412 HK

Scroll

7000 HRS

Penggantian dilakukan setiap 412 HK

Ripple Plate

900 HRS/SET/Unit

Pengagntian dilakukan setiap 54 HK

Rotor Bar

600 HRS/SET/Unit

Penggantian dilakukan setiap 36 HK

Rotor Plates

1200 HRS/SET/Unit

Penggantian dilakukan setiap 72 HK

Stator Bar

600 HRS/SET/Unit

Penggantian dilakukan setiap 36 HK

Buckets

Dry---> 5 % Total Buckets/YR

Penggantian dilakukan sebanyak 3 buckets/YR

Wet---> 10 % Total Buckets/YR

Penggantian dilakukan sebanyak 5 buckets/YR

Chain

Sprockets

5

Clarification

Dry---> 8500 HRS

Penggantian dilakukan setiap 510 HK

Wet--->3500 HRS

Penggantian dilakukan setiap 210 HK

Dry---> 3500 HRS

Penggantian dilakukan setiap 210 HK

Wet--->2500 HRS

Penggantian dilakukan setiap 150 HK

6)

Fiber Cyclone

Airlock

11000 HRS

Penggantian dilakukan setiap 647 HK

6)

Kernel Silo

Airlock

26000 HRS

Penggantian dilakukan setiap 1529 HK

6)

LTDS Cyclone

Airlock

5500 HRS

Penggantian dilakukan setiap 323 HK

6)

Nut Cyclone

Airlock

11500 HRS

Penggantian dilakukan setiap 676 HK

6)

Umpan Ripple Mill Airlock

21000 HRS

Penggantian dilakukan setiap 1235 HK

1)

Crude Oil Vibrating Bearing Screen

11000 HRS

Penggantian dilakukan setiap 647 HK

Screens

60 TPH = 4 Screens/YR

4 screen/YR

Liner

6000 HRS

Penggantian dilakukan setiap 323 HK

Scrool

3000 HRS

Penggantian dilakukan setiap 176 HK

2)

Solids Conveyor

3)

Sand Cyclone

Keramik Cone

2 Pieces/Unit/YR

Penggantian dilakuakn 2 unit/pieces/YR

4)

Sludge Vibrating Screen

Clamp Rings

60 TPH = 1,5 Clamps/YR

1,5 clamps/YR

Hycer Gasket

60 TPH = 4 Gasket/YR

4 gaskets/YR

Screens

60 TPH = 4 Screens/YR

4 screen/YR

11000 HRS

Penggantian dilakukan setiap 647 HK

Cap Nut

3000 HRS/PC

Penggantian dilakukan setiap 428 HK/PC

Lock Nut

5500 HRS/PC

Penggantian dilakukan setiap 324 HK/PC

Nozzle Holder

5500 HRS/PC

Penggantian dilakukan setiap 324 HK/PC

Nozzles

3000 HRS/Nozzle

Penggantian dilakuakan setiap 428 HK/Nozzle

5)

Sludge Centrifuge Bearing

6

7

Boiler

Empty Bunch

1)

ID Fan

Impeller

1 Unit/17000 HRS/Boiler

1 unit/1000 HK/boiler

2)

Dust Cyclone

Cyclones

1 Set/8000 HRS/Unit Boiler

Penggantian dilakukan setiap 941 HK

5)

Fuel Conveyor

Liners

16000 HRS

Penggantian dilakukan setiap 941 HK

Scrool

16000 HRS

Penggantian dilakukan setiap 941 HK

Chain

16000 HRS

Penggantian dilakukan setiap 941 HK

Sprocket-2 Sets

8000 HRS

Penggantian dilakukan setiap 470 HK

Chain

8500 HRS

Penggantian dilakukan setiap 500 HK

Sprocket-2 Sets

4500 HRS

Penggantian dilakukan setiap 265 HK

Chain

16500 HRS

Penggantian dilakukan setiap 970 HK

Sprocket-2 Sets

8500 HRS

Penggantian dilakukan setiap 500 HK

1)

2)

3)

EB. Horizontal Conveyor

EB. Inclined Conveyor

Bunch Crusher Elevator

Desember 3

4

5

Keterangan

Penggantian ke-1 setiap Januari 2009, maka penggantian selanjutnya setiap minggu ke-2 November 2011 Penggantian ke-1 setiap awal Februari 2009, maka penggantian selanjutnya setiap akhir Juli 2010 Penggantian ke-2 setiap April 2009, maka penggantian selanjutnya setiap minggu ke-3 Agustus 2011 Penggantian ke-1 setiap minggu ke-2 Januari 2009, maka penggantian selanjutnya setiap minggu ke-3 Mei 20011

Penggantian ke-1 setiap akhir Mei 2009, maka penggantian selanjutnya setiap minggu ke-3 April 2011 Penggantian ke-1 setiap akhir Juni 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Mei 2011 Penggantian pertama dilakukan akhir September 2009, maka penggantian selanjutnya dilakukan setiap awal April 2012

Penggantian ke-1 setiap awal Maret 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 September 2011 Penggantian ke-1 setiap akhir Desember 2009, maka penggantian seelanjutnya dilakukan setiap minggu ke-3 Juli 2012 Penggantian ke-1 setiap akhir November 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Juni 20012

Penggantian ke-1 setiap awal September 2009, maka penggantian selanjutnya dilakukan setiap awal Agustus 2011 Penggantian ke-1 setiap awal Desember 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Juni 2015

Penggantian ke-1 setiap akhir Maret 2009, maka penggantian selanjutnya dilakukan setiap akhir Oktober 2011

Penggantian pertama setiap awal Oktober 2009, maka penggantian dilakukan selanjutnya setiap awal Agustus 2010

Penggantian ke-1 setiap akhir Juli 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Juni 2012

Penggantian ke-1 setiap minggu ke-3 September 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Juli 2011 Penggantian ke-1 setiap minggu ke-3 Agustus 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Juni 2011

Penggantian ke-1 dilakukan setiap akhir Maret 2009 maka penggantian selanjutnya dilakukan setiap minggu ke- Juni 2011

Penggantian pertama dilakukan setiap akhir Agustus 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Mei 2010

Penggantian ke-1 setiap akhir Mei 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 April 2012 Penggantian ke-1 setiap akhir Oktober 2009, amak penggantian selanjutnya dilakukan setiap awal Agustus 2015 Penggantian ke-1 setiap awal November 2009, maka penggantian selanjutnya setiap minggu ke-2 Mei 2011 Penggantian ke-1 setiap awal Juli 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-3 Juni 2012 Penggantian ke-1 setiap akhir September 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 April 2015 Penggantian ke-1 setiap minggu ke-4 Maret 2009, maka penggantian selanjutnya dilakukan setiap akhir November 2011

Penggantian pertama setiap awal Mei 2009, maka penggantian selanjutnya dilakukan setiap akhir Agustus 2010

Penggantian ke-1 setiap akhir Juni 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Mei 2012 Penggantian ke-1 setiap minggu ke-2 Mei 2009, maka penggantian selanjutnya dilakukan setiap akhir November 2010 Penggantian ke-1 setiap minggu ke-3 Juli 2009, maka penggantian selanjutnya dilakukan setiap akhir September 2010 Penggantian ke-1 setiap minggu ke-3 Agustus 2009, maka penggantian selanjutnya dilakukan setiap akhir November 2010 Penggantian ke-1 setiap minggu ke-2 Februari, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Mei 2012

Penggantian ke-1 dilakukan setiap minggu ke-3 Januari 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Juni 2012 Penggantian ke-1 akhir Maret 2009, maka penggantian selanjutnya dilakukan akhir Juli 2012 Penggantian pertama akhir Mei 2009, maka penggantian selanjutnya dilakukan akhir Juli 2012 Penggantian pertama akhir Agustus 2009, maka penggantian selanjutnya dilakukan akhir November 2012 Penggantian ke-1 akhir Desember 2009, maka penggantian selanjutnya dilakukan setiap akhir Maret 2013 Penggantian ke-1 setiap awal Maret 2009, maka penggantian selanjutnya dilakukan setiap minggu ke-2 Oktober 2010 Penggantian pertama setiap awal April 2009, maka penggantian selanjutnya dilakukan setiap akhir Desember 2010

Penggantian ke-1 setiap minggu ke-2 Desember 2009, maka penggantian selanjutnya dilakukan setiap akhir Mei 2014 Penggantian ke-1 setiap awal Mei 2009, maka penggantian selanjutnya dilakukan setiap akhir Januari 2011

Biaya Gaji Karyawan Pada PT. Bias Senja BHL = 1/7*Upah/hari SKUH = 3/20 * Upah/hari SKUB = 1/173 * Upah/bulan Jumlah jam lembur = 1,75 jam Jumlah jam kerja = 24 HK Upah per hari = Rp. 30.000 No.

Nama

Jabatan

Status

Gaji Pokok

Lembur

Gaji Pokok + Lembur/Bln

Januari

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

1

Aji

Mandor

SKU-B

1,500,000

364,162

1,864,162

1,864,162

1,864,162

1,864,162

1,864,162

1,864,162

1,864,162

1,864,162

1,864,162

1,864,162

2

Joko

Wakil Mandor

SKU-B

1,350,000

327,746

1,677,746

1,677,764

1,677,764

1,677,764

1,677,764

1,677,764

1,677,764

1,677,764

1,677,764

1,677,764

3

Sukir

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

4

Jadi

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

5

Dedi

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

6

Kirman

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

7

Sahat

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

8

Jono

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

9

Murdi

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

10

Salut

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

11

Ramlan

Teknisi

SKU-B

1,100,000

267,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

1,367,052

12

Arif

Teknisi

SKU-B

950,000

230,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

13

Mustakim

Teknisi

SKU-B

950,000

230,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

14

Wardi

Teknisi

SKU-B

950,000

230,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

15

Kardi

Teknisi

SKU-B

950,000

230,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

1,180,636

16

Heri

Teknisi

SKU-B

850,000

206,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

17

Sulaiman

Teknisi

SKU-B

850,000

206,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

18

Warno

Teknisi

SKU-B

850,000

206,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

1,056,358

19

Saiful

Teknisi

SKU-H

800,000

210,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

20

Budi

Teknisi

SKU-H

800,000

210,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

21

Sitorus

Teknisi

SKU-H

800,000

210,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

22

Pangaribuan

Teknisi

SKU-H

800,000

210,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

23

Markus

Teknisi

SKU-H

800,000

210,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

1,010,000

24

Seno

Teknisi

BHL

700,000

175,000

875,000

875,000

875,000

875,000

875,000

875,000

875,000

875,000

875,000

875,000

25

Ratman

Teknisi

BHL

700,000

175,000

875,000

875,000

875,000

875,000

875,000

875,000

875,000

875,000

875,000

875,000

30,536,994

30,536,994

30,536,994

30,536,994

30,536,994

30,536,994

30,536,994

30,536,994

30,536,994

30,536,994

Total

ja

Oktober

November

Desember

Gaji Pokok + Lembur/Thn

1,864,162

1,864,162

1,864,162

22,369,944

1,677,764

1,677,764

1,677,764

20,133,168

1,367,052

1,367,052

1,367,052

16,404,624

1,367,052

1,367,052

1,367,052

16,404,624

1,367,052

1,367,052

1,367,052

16,404,624

1,367,052

1,367,052

1,367,052

16,404,624

1,367,052

1,367,052

1,367,052

16,404,624

1,367,052

1,367,052

1,367,052

16,404,624

1,367,052

1,367,052

1,367,052

16,404,624

1,367,052

1,367,052

1,367,052

16,404,624

1,367,052

1,367,052

1,367,052

16,404,624

1,180,636

1,180,636

1,180,636

14,167,632

1,180,636

1,180,636

1,180,636

14,167,632

1,180,636

1,180,636

1,180,636

14,167,632

1,180,636

1,180,636

1,180,636

14,167,632

1,056,358

1,056,358

1,056,358

12,676,296

1,056,358

1,056,358

1,056,358

12,676,296

1,056,358

1,056,358

1,056,358

12,676,296

1,010,000

1,010,000

1,010,000

12,120,000

1,010,000

1,010,000

1,010,000

12,120,000

1,010,000

1,010,000

1,010,000

12,120,000

1,010,000

1,010,000

1,010,000

12,120,000

1,010,000

1,010,000

1,010,000

12,120,000

875,000

875,000

875,000

10,500,000

875,000

875,000

875,000

10,500,000

30,536,994

30,536,994

30,536,994

366,443,928

Jumlah Biaya Penggantian Sparepart Tahun 2009 Pada PT. Bias Senja Produksi Kebun = 2 ton/ha/bln Kapasitas Kebun = 288000 ton/thn Luas Kebun = 12000 ha Libur Minggu = 54 hari Libur Lebaran = 7 hari Libur Lain-Lain = 16 hari Kapasitas Pabrik = 60 tph Kapasitas pabrik/hari = 1000 jam Jam Olah = 17 jam Kapasitas Lori = 3 ton/lori Jumlah HK = 288 HK

No.

1

2

Station Group

Loading Ramp

Sterilizer

Equipment

Pressing

Standart

Keterangan

Jumlah

Harga

Cages (Using Hosting Crane)

1). Cap Cages 20 % Ttl Cages 2,50 ; 2,75 ; 3,75 Replacement ton Cycle/YR

Penggantian dilakukan 24 kali/thn dan 4 cages setiap kali ganti

15 juta/ea

Capstan

Wire Rope

0,01 Meters/Ton FFB

Penggantian wire rope = 2280 meter

23 rb/meter

1)

Sterilizer 60 TPH

Door Packing

3 Pieces/Door/YR

4 buah sterilizer=24 pieces/yr dan 4 pieces sekali ganti

4 Sterilizer

1)

Horizontal-Bunch Chain Conveyors

14000 HRS

Penggantian dilakukan setiap 823 HK

1 Conveyor (2 side)

Sprocket

7000 HRS

Penggantian dilakukan setiap 411 HK

1)

Inclined-Bunch Conveyors

Chain

9500 HRS

Penggantian dilakukan setiap 558 HK

1)

Inclined-Bunch Conveyors

Sprocket

4000 HRS

Penggantian dilakukan setiap 235 HK

2)

Hoist

Endless Chain

70000 tons FFB/Set Penggantian 4 kali Cahin masing-masing 1 set

Sprockets

36500 tons FFB/Set Penggantian 8 kali Sprocket masing-masing 1 set

3)

3

Parts

Conveyor Below Thresher

Wire Rope

1,3 Meters/1000 Tons FFB

Jumlah wire rope 374,4 meter, dilakukan 4 kali penggantian @ 93,6 meter

Liner

11000 HRS

Penggantian dilakukan setiap 647 HK

Scroll

11000 HRS

Penggantian dilakukan setiap 647 HK Penggantian dilakukan setiap 700 HK

4)

Thresher

Flat Bars

700000 Tons FFB/Thresher

1)

Fruit Elevator

Buckets

5 % of Total/YR/Unit Penggantian dilakukan of Elevator sebanyak 3 buckets/YR

Chain

7500 HRS

Penggantian dilakukan setiap 441 HK

Liner

12500 HRS

Penggantian dilakukan setiap 735 HK

Scroll

12500 HRS

Penggantian dilakukan setiap 735 HK

Expeller Arms

3000 HRS

Penggantian dilakukan setiap 176 HK

2) Fruit Distributing Conveyor, Bottom Cross Conveyor, Top Cross Conveyor, Recycling Fruit Conveyor

3)

Digester

Liner, Baffles & Bottom Plate

8000 HRS

Penggantian dilakukan setiap 470 HK

Januari

2 Hoist crane (2 side)

3 Threshing

April

Mei

60,000,000

728,000

728,000

1,300,000

950 rb/ea

1,900,000

56 rb/meter

5,241,600

1,300,000

1,900,000

1,900,000

1,900,000

5,241,600

1,975 jt/conveyor

728,000

728,000

1,300,000

1,900,000

1,900,000

1,900,000

5,241,600

5,925,000

4,350,000

28,500,000

1,683,000

300 rb/side

600,000

1,975 jt/conveyor

1,45 jt/conveyor 4 mesin press (1 Expeller arms/digester)

November

60,000,000

1,300,000

1,45 jt/conveyor

Masing-masing conveyor

60,000,000

Oktober

736,000

650 rb/ea

187 rb/bucket

September

1,660,000

415,000

3 Elevator

Agustus

736,000

415 rb/ea

9,5 jt/treshing

Juli

60,000,000

728,000

368 rb/side

3 Threshing

Juni

52,440,000

415 rb/ea

1 Conveyor (2 side)

Maret

60,000,000

182 rb/ea

368 rb/side

Februari

674 rb/ea 1,2 jt/liner ; 450 rb/bafle digester ; 2,1 jt/bottom plate digester

5,800,000

2,696,000

2,696,000

10,050,000

4)

Screw Press

4.1) Screw Press-P15

5)

4

Nut and Kernel 1)

2)

Cake Breaker Conveyor

Ripple Mill

Elevators

Shaft

21000 HRS

Penggantian dilakukan setiap 1235 HK

2,75 jt/ea

Stirring Arms

3000 HRS

Penggantian dilakukan setiap 176 HK

1,5 jt/digester

Bearing

10500 HRS

Penggantian dilakukan setiap 617 HK

2,85 jt/ea

Adjusting Cone

3000 HRS

Penggantian dilakukan setiap 176 HK

987 rb/ea

Bushing for Lenghtening Shaft

1100 HRS/SET

Penggantian dilakuan setiap 66 HK/Set

2 Bushing for lenghtening shaft

244 rb/ea

Lenghtening Shaft

3500 HRS

Penggantian dilakukan setiap 206 HK

2 Lenghtening Shaft

2,05 jt/ea

Press Cage

2500 HRS

Penggantian dilakukan setiap 147 HK

4,945 jt/ea

Strainer Plate

11000 HRS

Penggantian dilakukan setiap 647 HK

785 rb/ea

Worm Screws

1000 HRS

Penggantian dilakukan setiap 59 HK

Liner

7000 HRS

Penggantian dilakukan setiap 412 HK

1,975 jt/conveyor

Scroll

7000 HRS

Penggantian dilakukan setiap 412 HK

1,45 jt/conveyor

Ripple Plate

900 HRS/SET/Unit

Penggantian dilakukan setiap 54 HK

Rotor Bar

600 HRS/SET/Unit

Penggantian dilakukan setiap 36 HK

Buckets

Dry---> 5 % Total Buckets/YR

Penggantian dilakukan sebanyak 3 buckets/YR

Wet---> 10 % Total Penggantian dilakukan Buckets/YR sebanyak 5 buckets/YR

Chain

Sprockets

5

Clarification

2 Worm Screws

4 Ripple mill

5,175 jt/ea

625 rb/ripple mill

4 Elevators

155 rb/buckets

1 Elevator

155 rb/buckets

3,948,000

1,952,000

3,140,000

41,400,000

41,400,000

2,304,000

2,500,000

2,500,000

2,304,000

2,500,000

1 Elevator

1,1 jt/side

2,200,000

Dry---> 3500 HRS

Penggantian dilakukan setiap 210 HK

4 Elevators

800 rb/ea

Wet--->2500 HRS

Penggantian dilakukan setiap 150 HK

1 Elevator

800 rb/ea

Kernel Silo

Airlock

26000 HRS

Penggantian dilakukan setiap 1529 HK

2 Kernel silo

1,35 jt/ea

6)

LTDS Cyclone

Airlock

5500 HRS

Penggantian dilakukan setiap 323 HK

2 LTDS

1,35 jt/ea

6)

Nut Cyclone

Airlock

11500 HRS

Penggantian dilakukan setiap 676 HK

1 Nut transport

1,35 jt/ea

6)

Umpan Ripple Mill Airlock

21000 HRS

Penggantian dilakukan setiap 1235 HK

4 Ripple mill

1,35 jt/ea

1)

Crude Oil Vibrating Screen

Bearing

11000 HRS

Penggantian dilakukan setiap 647 HK

3 Vibrating screen ; 2 ea/screen

1,25 jt/ea

Screens

60 TPH = 4 Screens/YR

4 screen/YR

Liner

6000 HRS

Penggantian dilakukan setiap 323 HK

2,500,000

2,500,000

2,500,000

2,304,000

2,500,000

2,500,000

2,500,000

12,800,000

3,200,000

3,200,000

2,700,000

2,700,000

2,700,000

1,350,000

5,400,000

7,500,000

1,55 jt/ea

1,975 jt/conveyor

2,500,000

2,304,000

775,000

Penggantian dilakukan setiap 210 HK

6)

2,304,000

1,860,000

Wet--->3500 HRS

1,35 jt/ea

41,400,000

1,450,000

8,800,000

2 Fiber cyclone

41,400,000

1,975,000

1,1 jt/side

Penggantian dilakukan setiap 647 HK

1,952,000

19,780,000

4 Elevators

11000 HRS

1,952,000

16,400,000

Penggantian dilakukan setiap 510 HK

Airlock

3,948,000

1,952,000

Dry---> 8500 HRS

Fiber Cyclone

Solids Conveyor

6,000,000

22,800,000

576 rb/ripple mill

6)

2)

6,000,000

9,300,000

1,975,000

4)

5)

6

7

Boiler

Empty Bunch

Sludge Vibrating Screen

Scrool

3000 HRS

Penggantian dilakukan setiap 176 HK

Clamp Rings

60 TPH = 1,5 Clamps/YR

1,5 clamps/YR

Hycer Gasket

Screens

1,45 jt/conveyor

Double deck ; 1 Vibra screen

215 rb/ea

60 TPH = 4 Gasket/YR 4 gaskets/YR

2 Hycer Gasket

85 rb/ea

60 TPH = 4 Screens/YR

4 screen/YR

2 Screens

1,55 jt/ea

11000 HRS

Penggantian dilakukan setiap 647 HK

8 Sludge centrifugde 6000 ltr/jm ; 2 bearing/centrifu dge

1,87 jt/ea

Cap Nut

3000 HRS/PC

Penggantian dilakukan setiap 428 HK/PC

6 Cap nut

96 rb/ea

Lock Nut

5500 HRS/PC

Penggantian dilakukan setiap 324 HK/PC

6 Lock nut

56 rb/ea

Nozzle Holder

5500 HRS/PC

Penggantian dilakukan setiap 324 HK/PC

6 Nozzle Holder

Nozzles

3000 HRS/Nozzle

Penggantian dilakuakan setiap 428 HK/Nozzle

6 Nozzles

2 Boiler 20 ton/jam 4,25 jt/ea

Sludge Centrifuge Bearing

Impeller

1 Unit/17000 HRS/Boiler

1 unit/1000 HK/boiler

2)

Dust Cyclone

Cyclones

1 Set/8000 HRS/Unit Boiler

Penggantian dilakukan setiap 941 HK

5)

Fuel Conveyor

Liners

16000 HRS

Penggantian dilakukan setiap 941 HK

Scrool

16000 HRS

Penggantian dilakukan setiap 941 HK

Chain

16000 HRS

Penggantian dilakukan setiap 941 HK

Sprocket-2 Sets

8000 HRS

Penggantian dilakukan setiap 470 HK

515 rb/ea

Chain

8500 HRS

Penggantian dilakukan setiap 500 HK

468 rb/side

Sprocket-2 Sets

4500 HRS

Penggantian dilakukan setiap 265 HK

515 rb/ea

Chain

16500 HRS

Penggantian dilakukan setiap 970 HK

378 rb/side

Sprocket-2 Sets

8500 HRS

Penggantian dilakukan setiap 500 HK

485 rb/ea

2)

3)

EB. Horizontal Conveyor

EB. Inclined Conveyor

Bunch Crusher Elevator

Jumlah

430,000

680,000

29,920,000

570,000

336,000

804,000

43 rb/ea

ID Fan

258,000

8,500,000

3 jt/ea

1 Conveyor

1,450,000

134 rb/ea

1)

1)

1,450,000

6,000,000

2,375 jt/conveyor

2,375,000

1,85 jt/conveyor

1 Conveyor (2 side)

1,850,000

468 rb/side

2,060,000

936,000

2,060,000

1,940,000 126,748,600

18,602,000

55,810,000

112,645,600

28,243,000

121,482,000

59,326,000

103,855,600

54,315,000

129,284,000

69,288,000

Tahun 2009 Pada PT. Bias Senja

Desember

60,000,000

Biaya per Tahun

360,000,000

52,440,000

728,000

4,368,000

736,000

1,660,000

736,000

415,000

5,200,000

1,900,000

5,241,600

15,200,000

20,966,400

5,925,000

4,350,000

28,500,000

1,683,000

600,000

7,900,000

7,900,000

5,800,000

5,392,000

10,050,000

11,000,000

11,000,000

12,000,000

22,800,000

7,896,000

7,808,000

16,400,000

19,780,000

39,560,000

3,140,000

41,400,000

207,000,000

1,975,000

1,450,000

2,304,000

2,500,000

13,824,000

27,500,000

1,860,000

775,000

8,800,000

2,200,000

4,400,000

12,800,000

6,400,000

2,700,000

2,700,000

2,700,000

1,350,000

5,400,000

7,500,000

9,300,000

1,975,000

2,900,000

430,000

680,000

12,400,000

12,400,000

29,920,000

570,000

336,000

804,000

258,000

8,500,000

6,000,000

2,375,000

1,850,000

936,000

936,000

2,060,000

936,000

2,060,000

756,000

4,120,000

756,000

1,940,000 171,105,600

1,050,705,400

Jumlah Biaya Pada PT. Bias Senja No. 1.

2. 3. 4. 5.

Keterangan Total Biaya - Biaya penggantian sparepart - Biaya gaji karyawan & lembur Jumlah Produksi TBS/Thn Produksi CPO/Thn Rupiah/Kg TBS Rupiah/Kg CPO

ada PT. Bias Senja Biaya Rp1,050,705,400 Rp366,443,928 Rp1,417,149,328 Rp288,000 Rp64,800 Rp5 Rp22