QUOTATION Prepared For:

Date: 3/12/2001 Item Qty Unit

By: Dan Luedeke ( Chief Estimator ) Multimedia Integrated Systems, Inc. 4888 Langfield Rd Suite #600 Houston, Texas 77040 (713) 460-5410 Fax (713) 460-5346 FOB: Houston Prices Good for 30 Days Terms: Net30 Description Price Each Extension MATERIAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

24716039.xls

QUOTATION TEXAS SOUTHERN UNIVERSITY DORMS & HOUSING CAT. 6

Prepared For: Arthur Dye

Date: Item

10/21/2009 Qty Unit

FOB: Buffalo,TX. Description

By:

Prices Good for 180 Days

Dan Luedeke ( President ) DL Communications Po. Box 27 Buffalo, Texas 75831 ( 713 ) 504-3773 Fax FAX((903-322-4093 1- 281 ) 528-7822 ) Terms: Net 15 Price Each Extension

BOYS & GIRLS DORM 1 2 3 4 5 6 7

7,000 10 34 2 90 1 16

FT EA EA EA FT LOT EA

MATERIAL CAT. 6 CAT. 6 PLENUM CABLE SURFACE MOUNT BOX LEVITON CAT. 6 INSERT LEVITON 24 PORT PATCH PANEL LD-5 PANDUIT WALL MOULDING MISC. MATERIAL LEVITON FACE PLATE

$0.34 $3.25 $5.60 $150.00 $2.10 $50.00 $2.25 TOTAL MATERIAL

8

34

EA

LABOR PLACE,TERMINATE AND TEST CAT.6 CABLES

$80.00 TOTAL LABOR TOTAL COST

HOUSING LABS 1 2 3 4 5 6 7 8

1,000 8 16 8 4 4 80 1

FT EA EA EA EA EA FT LOT

MATERIAL CAT. 6 CAT. 6 PLENUM CABLE SURFACE MOUNT BOX LEVITON CAT. 6 INSERT LEVITON FACE PLATE WALL MOUNT SHELF LINKSYS 8 PORT 10/100/1000 SWITCH LD-5 PANDUIT WALL MOULDING MISC. MATERIAL

$0.34 $3.25 $5.60 $2.25 $45.00 $125.00 $2.10 $50.00 TOTAL MATERIAL

9

16

EA

LABOR PLACE, TERMINATE AND TEST DATA CABLES

$80.00 TOTAL LABOR TOTAL COST

TOTAL COST FOR BOYS, GIRLS DORMS AND HOUSING LABS

$0.00 $0.00

$0.00 $0.00 $0.00 $2,380.00 $32.50 $190.40 $300.00 $189.00 $50.00 $36.00 $3,177.90 $0.00 $0.00 $2,720.00 $2,720.00 $0.00 $5,897.90 $0.00 $0.00 $0.00 $0.00 $0.00 $340.00 $26.00 $89.60 $18.00 $180.00 $500.00 $168.00 $50.00 $1,371.60 $0.00 $0.00 $1,280.00 $1,280.00 $0.00 $2,651.60 $0.00 $0.00 $8,549.50

$0.00 $0.00