TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
RATE
PART 1 - PRELIMINARIES AND GENERAL ITEMS Contractual Requirements A110
Perfomance Bond
sum
A120
Insurance of the Works
sum
A130
Third party insurance
sum
A140
Insurance against damage to persons and
sum
property Specified Requirements Accomodation for the Engineer's staff A211.1
Establishment and removal of offices for the
sum
Engineer's staff as specification clause 104.1 to 104.4 inclusive A211.2
Miantenance of offices for the Engineer's staff
wk
20
wk
4
until completion of the Works A211.3
Miantenance of offices for the Engineer's staff after completion of the Works 1/1
To Collection BD
Truck Haul Road TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
RATE
PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Services for the Engineer's Staff Communication System as Special Specification clause 103 A222.1
Establishement and removal of telephone system
sum
A222.2
Maintenance of telephone system until completion
wk
20
wk
4
of the Works A222.3
Maintenance of telephone system after completion of the Works
A222.4
Establishement and removal of independent facsimile/phone systems
sum
A222.5
Maintenance of facsimile/phone system
wk
20
wk
4
until completion of the Works A222.6
Maintenance of facsimile/phone system after completion of the Works
A222.7
Establishement and removal of mobile telephones
sum
A222.8
Maintenance of mobile telephones until
wk
20
wk
4
completion of the Works A222.9
Maintenance of mobile telephones after completion of the Works
A229.1
Set of progress photographs as specification.
sum
1/2
To Collection BD
Truck Haul Road
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
RATE
PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Equipment for use by the Engineer's staff A231.1
Establishment and removal of office equipment as
sum
Specification clause 104.5 to 104.9 inclusive. A231.2
Maintenance of office equipment until
wk
20
wk
4
completion of the Works A231.3
Maintenance of office equipment after completion of the Works Attendance upon the Engineer's staff
A244.1 A244.2 A245.1
Office attendant/ Cleaner until completion
man-
of the Works
wk
Office attendant/ Cleaner after completion
man-
of the Works
wk
Secretary until completion of the Works
man-
20 4 20
wk A245.2
Secretary after completion of the Works
man-
4
wk A246.1
Driver until completion of the Works
man-
20
wk A246.2
Driver after completion of the Works
man-
4
wk Testing of Materials & Works A250
Testing of Materials
sum
A250
Testing of the Works
sum 1/3
To Collection BD
Truck Haul Road TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
RATE
BD/FILS PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Temporary Works A271
Traffic Diversions
sum
A271.1
Traffic regulation; establishment and removal
sum
A272
Traffice regulation; continuing operation and
sum
maintenance A279.1
Protection and upkeep of site, adjacent areas
sum
and properties A279.2
Tidying and cleaning the site
sum
A279.4
Erection and removal of project sign boards
nr
2
A279.5
Maintenance of project sign boards
nr
2
As-built drawings A291
Provide set of as-built drawings upon
sum
completion of the contract 1/4
To Collection BD
Truck Haul Road TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Method-Related Charges (Cont'd) (inserted by the Tenderer) A310
Accommodation and buildings for the Contractor 1/5
Truck Haul Road
To Collection BD
RATE
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
RATE
PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Method-Related Charges (Cont'd) (inserted by the Tenderer) A320
Services 1/6
To Collection BD
Truck Haul Road
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
RATE
PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Method-Related Charges (Cont'd) (inserted by the Tenderer) A330
Plant
A340
Plant 1/7
To Collection BD
Truck Haul Road
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
RATE
ITEM
DESCRIPTION
UNIT
QTY
RATE
PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Method-Related Charges (Cont'd) (inserted by the Tenderer) A350
Temporary Works 1/8
To Collection BD
Truck Haul Road 8
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
RATE
PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Method-Related Charges (Cont'd) (inserted by the Tenderer) A370
Supervision & Labour 1/9
To Collection BD
Truck Haul Road
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
PART 1 - PRELIMINARIES AND GENERAL ITEMS (Cont'd) Provisional Sums
DESCRIPTION
UNIT
QTY
RATE
A421
Allow Provisional Sums of BD. 1,000/- for
sum
Municipality fees for removing trees and shrubs A422
Allow Provisional Sum of BD. 100,000/- for
sum
utilities protection A423
Allow Provisional Sum of BD. 10,000/- for
sum
Dayworks A424
Allow provisional Sum of BD 1,000/- for ground
sum
investigation A425
Allow Provisional Sum of BD 50,000/- for construction
sum
of traffic signal junction. A426
Allow Provisional Sum of BD 10,000/- for traffic signs
sum
& installation A427
Allow Provisional Sum of BD 30,000/- for road marking
sum
& installation A428
Allow Provisional Sum of BD 115,000/- for purchase
sum
of materials for street lighting 1/10
To Collection BD
Truck Haul Road
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 1 - PRELIMINARIES AND GENERAL ITEMS
ITEM
DESCRIPTION
UNIT
QTY
PART 1 - PRELIMINARIES AND GENERAL ITEMS COLLECTION From page 1/1 From page 1/2 From page 1/3 From page 1/4 From page 1/5 From page 1/6 From page 1/7 From page 1/8 From page 1/9 From page 1/10 1/11 Truck Haul Road
To Collection BD
RATE
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS B - GROUND INVESTIGATION Trial Pits and Trenches (All Provisional) Number in material other than rock B111.1
Minimum plan area at bottom of excavation 1m²;
5 nr.
maximum depth not exceeding 1m B111.2
Maximum length at bottom of excavation 5m;
5 nr.
maximum depth not exceeding 1m B112.1
Minimum plan area at bottom of excavation 1m²
5 nr.
maximum depth 1m to 2m B112.2
Maximum length at the bottom of excavation 5m;
5 nr.
maximum depth 1m to 2m Number in material which includes rock B121.1
Minimum plan area at bottom of excavation 1m²
5 nr.
maximum depth not exceeding 1m B121.2
Maximum length at bottom of excavation 5m;
5 nr.
maximum depth not exceeding 1m B130
Depth in material other than rock
20 m
B140
Depth in rock
20 m
B160
Depth backfilled, with selected excavated material.
40 m
CLASS B - TOTAL TO SECTION SUMMARY Truck Haul Road
2C/1
BD
Page 1 of 19
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS D - DEMOLITION AND SITE CLEARANCE General Clearance D100
General site clearance
10.5
ha
Other Structures (including disposal) D560
Demolish all structures including fence, shelters,
item
concrete buildings or wholly within the limits of the road corridor. D561.2
Raising of existing manholes (Provisional)
10
Nr
10
Nr
100
m
10
Nr
5
Nr
Dismantle and Remove from Site Existing road signs including foundations and filling voids D570
with suitable material, making good and deliver as directed by the Engineer (Provisional)
D574
Precast concrete kerb including foundation and backing (Provisional)
D577.1
Existing concrete bollards (Provisional)
D577.2
Existing light columns, dismantle and re-connection
to be carried out by EDD (Provisional) CLASS D - TOTAL TO SECTION SUMMARY Truck Haul Road
2C/2
BD
Page 2 of 19
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS E - EARTHWORKS Excavation for Cuttings E210
Topsoil
E220
Material other than topsoil, rock or artificial hard
14,100 m3 1,050 m³
material E230
Material in rock
E250
Asphalt material (Provisional)
9,200 m³ 200 m³
Excavation Ancillaries E522
Preparation of excavated surfaces, material other
2,400 m2
than topsoil or rock E523
Preparation of excavated surfaces, material in rock
21,600 m2
E531
Disposal of excavated material - topsoil
14,100 m3
E532
Disposal of excavated material other than topsoil,
150 m³
rock or artificial hard material. E533
Disposal of excavated material in rock
E534
Disposal of excavated material in asphalt (Provisional)
1,200 m³ 200 m³
E560.1
Excavation 300mm below Type B including disposal
100 m³
and replace with suitable fill material (Provisional) E560.2
Soil stabilisation geogrid on sub-grade level if excavtion not possible due to existing services
100 m2
(Provisional) Filling E624
Filling to embarkments with selected type B
900 m³
excavated material other than topsoil or rock E625
Filling to embarkments with selected type B
40,500 m³
imported material other than topsoil or rock E626
Filling to embarkments with excavated rock
E722
Preparation of filled surfaces CLASS E - TOTAL TO SECTION SUMMARY
Truck Haul Road
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS E - EARTHWORKS (Cont'd)
8,000 m³ 61,400 m2 2C/3
BD
Page 3 of 19
February 2007
Embarkment slope protection as standard drawing SRCD 6.01 E910
Scheme A - 200 x 200 x 200 stone laid on 50mm
200 m²
nominal size stone (Provisional) E920
Scheme B - 200 thick hard fill type B (Provsional)
20,000 m²
Geotextiles E730
Geotextile as per standard specifications (Provisional) CLASS E - TOTAL TO SECTION SUMMARY
Truck Haul Road
20,000 m² 2C/4
BD
Page 4 of 19
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS E: EARTHWORKS COLLECTION
From page 2C/3 From page 2C/4
CLASS E - TOTAL TO SECTION SUMMARY Truck Haul Road
2C/5 Page 5 of 19
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 Class G - WORK IN CONNECTION WITH SERVICES (All Provisional) G910
Excavation to expose existing services
300 m3
G920
Excavation for new services
500 m3
G920
Disposal of excavated material
600 m3
G930
Filling around exposed services with selected
200 m3
material G940
Filling around exposed services with Type B material
600 m3
G950.1
Filling to cable/service protection - 50mm thick fine
300 m2
sand G950.2
Filling to cable/service protection - 100mm thick fine
300 m2
sand G960
Provision of lean mix concrete as SDES Specification
50 m3
Class 20/20 G970
Placing of concrete as protection to services in
50 m3
trenches and formwork. G980
Provision of reinforced concrete Class 40/20
G981
Supplying, bending, placing and tying in position HYS
100 m3 10 Tonne
BD. February 2007
deformed bars Gr 460 G982
Formwork plain, vertical and curved to radius
CLASS G - TOTAL TO SECTION SUMMARY Truck Haul Road
400 m2
2C/6
BD
Page 6 of 19
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS I - PIPEWORKS Concrete pipes as Culverts as General Specification Clause 501.2 (All Provsioinal) Nominal Bore 900mm I242
In trenches depth 0-1.5m
40 m
Nominal Bore 600mm I252
In trenches depth 0-1.5m CLASS I - TOTAL TO SECTION SUMMARY
Truck Haul Road
190 m 2C/7
BD
Page 7 of 19
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS K - PIPEWORK - MANHOLES AND PIPEWORK ANCILLARIES Manholes (depth measured to channel invert level) Chamber type "D" in situ concrete as Standard Detail SD 1.5 K134.1
Depth 1.5 to 2.0m (Provisional)
2 nr.
Catchpits (depth measured to top of base slab) Chamber type "D" - In situ concrete - as Standard Detail SD 1.5 K232.1
Depth 1.5 to 2.0m (Provisional)
Other stated chambers Pipe culvert headwell with wingwall as standard
2 nr.
February 2007
drawing SRCD 5.03 (All Provisional) Nominal bore 1x600mm J512.1
Depth 1.5 - 2m (Provisional)
6 nr.
Nominal Bore 2x600mm J512.2
Depth 1.5 - 2m (Provisional)
6
Nominal bore 900mm J512.3
Depth 1.5 - 2m (Provisional)
4 nr.
Soakway K233.2
Construct soakway pit type 2 as per standard detail
2 nr.
drawing no. 3.7 (Provisional) CLASS K - TOTAL TO SECTION SUMMARY Truck Haul Road
2C/8
BD
Page 8 of 19
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS K - PIPEWORK - MANHOLES AND PIPEWORK ANCILLARIES (Cont'd) Gullies (Provisional) K331
Construct top entry gully complete as per standard
12 nr.
detail drawing no. 3.10 French drains, rubble drains, ditches and trenches V section unlined ditch in embankment as drawing no. 1591/T/410 K464
Cross section area 0.75 - 1.0m²
1,200 m
Trapezoidal section unlined ditch in cutting as drawing no. 1591/T/410 K495
Cross sectional area 1 - 1.5m²
600 m
K496
Cross sectional area 1.5 - 2m²
700 m
K497
Cross sectional area 2 - 3m²
360 m
Cable future ducts as standard drawings SRCD 5.06-5.08 K542.1
100mm dia 6 way ducts for telephone, in trenches
100 m
depth not exceeding 1.5m (Provisional) K542.2
150mm dia 4 way ducts for electricity, in trenches
340 m
depth not exceeding 1.5m (Provisional) Miscellaneous K820
Duct marker blocks; precast concrete; stamp coded with duct type, as standard detail SRCD 5.08A (Provisional)
48 nr.
February 2007
K900.1
300mm thick mortared rip-rap (Provisional)
CLASS K - TOTAL TO SECTION SUMMARY Truck Haul Road
36 m3
2C/9
BD
Page 9 of 19
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS K - PIPEWORK - MANHOLES AND PIPEWORK ANCILLARIES COLLECTION
From page 2C/8 From page 2C/9
CLASS K - TOTAL TO SECTION SUMMARY Truck Haul Road
2C/10
BD
Page 10 of 19
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS L - PIPEWORK - SUPPORT AND PROTECTION, ANCILLARIES TO LAYING AND EXCAVATION Beds and surrounds including polythlene sheet, bitumen paint and warning tape as applicable (Cont'd) K512.1
Reinforced concrete class 40/20 surround to 600mm
190 m
dia concrete pipe (Provisional) K512.2
Reinforced concrete class 40/20 surround to 900mm
40 m
dia concrete pipe (Provisional) K530
Transporting, installing, testing, backfilling 500mm
100 m
dia DI pipes supplied by WDD including 1 No 150mm dia UPVC pipe (Provisional) CLASS L - TOTAL TO SECTION SUMMARY Truck Haul Road
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES
2C/11
BD
Page 11 of 19
February 2007
PART 2 CLASS R - ROADS AND PAVINGS Sub-bases R114
Granular sub-base material Type A depth 150mm
65,100 m²
Flexible road bases and surfacing Base course type B28, including tackt coat between layers where necessary R323.1
Depth 100mm
63,300 m²
R323.2
Depth 75mm
61,725 m²
Wearing course type GW20, including tack coat R322
Depth 50mm
60,500 m²
R350
Road oil applied to sub-base
65,100 m²
Kerbs, Channels and Edging (All Provisional) Precast concrete kerbs half battered, size 125 x 250mm as standard detail SRCD 10.02 R611
Straight or curved to radius exceeding 12m
R612
Curved to radius not exceeding 12m including
2,200 m 200 m
curved kerb units. Precast concrete edgings, size 50 x 150mm as standard detail SRCD 10.02 R611
Straight or curved to radius exceeding 12m
R612
Curved to radius not exceeding 12m including
950 m 50 m
curved kerb units CLASS R - TOTAL TO SECTION SUMMARY Truck Haul Road
2C/12
BD
Page 12 of 19
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS R - ROADS AND PAVINGS (Cont'd) Light Duty Pavements (All Provisional) R714
Sub-base of granular material type A depth 150mm
4,150 m²
R792
Rectangular concrete paving blocks 60mm thick
3,000 m²
to BS 6717, in any type of color laid to approved pattern, with uniform joints on and including 30mm bed of sand NOTE: The following items for Traffic Signs and Road Markings, all of which are PROVISIONAL, may also be used for the King Hamad Highway (Durrat Al Bahrain) from Km 0+000 near to Askar to south Limit of Contract at boundary with Durrat Development (approx Km 28+000).
February 2007
CLASS R - TOTAL TO SECTION SUMMARY
2C/13
BD
Page 13 of 19 Truck Haul Road
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS R - ROADS AND PAVINGS (Cont'd) Ancillaries Road Traffic Signs (All Items Provisional) Fabrication, delivery & installation of steel structure gantry sign of "U" shape and road traffic signs including post and foundation all as per Ministry of Works and Housing standards for the following: R800
Gantry
20 nr
Span up to 22m R801
Speed Limit Sign
160 nr
Size: 1200mm dia. R802
Side Road/Bend to Right/Left
50 nr
Size:1200 triangle/1200 x 900mm R803
Vertical Chevron
50 nr
Size: 1050 x 700mm R804
Height Limit
20 nr
Size: 1200 mm triangle R805
Height Limit
10 nr
Size: 1200mm dia. R806
Chevron Sign (Single)
40 nr
Size: 900 x 600mm R807
Give Way
40 nr
Size: 1200mm triangle R808
Directional Arrow
15 nr
Size: 900mm dia R809
Signal Ahead
30 nr
Size:1200 mm triangle/1200 x 300 mm R810
No Entry
20 nr
Size: 900mm dia R811
Stop Sign
10 nr
Size: 900mm octagon
CLASS R - TOTAL TO SECTION SUMMARY Truck Haul Road
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2
2C/14
BD
Page 14 of 19
February 2007
CLASS R - ROADS AND PAVINGS (Cont'd) Ancillaries (Continued) Road Traffic Signs - Continued (All Items Provisional) Fabrication, delivery & installation of steel structure gantry sign of "U" shape and road traffic signs including post and foundation all as per Ministry of Works and Housing standards for the following: R812
Horizontal Chevron
10 nr
Size: 1800 x 600mm R813
Roundabout Ahead
10 nr
Size:1200 triangle/1200 x 900mm R814
One Way
15 nr
650 x 550mm R815
Road name
15 nr
2300 x 455mm R816
Exit Sign
10 nr
Size: 3000 x 2000 mm R817
Finger/Stack Sign
20 nr
2400 x 850mm R818
Advance Informatory Sign
30 nr
4000 x 4000 mm
CLASS R - TOTAL TO SECTION SUMMARY Truck Haul Road
2C/15
BD
Page 15 of 19
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS R - ROADS AND PAVINGS (Cont'd) Ancillaries (Continued) Road Markings (All Items Provisional) Supply and application of road markings all as per Ministry of Works and Housing standards. R900
Give Way Line (Code A)
160 m
Double broken line of 0.60m mark, 0.30m gap and width of 0.20m marked up to C/L of minor road, extend by 0.60m line, 0.30m gap and width 0.10m R901
Stop Line at Traffic Signal (Code D)
50 m
Solid line of 0.30m width to be marked 2m before traffic signal pol;e unless otherwise specified R902
Lane Line (Code G)
12,868 m
Intermittent line of 2.0m mark, 7.0m gap using 100mm ceramic studs at 0.5m spacing. R903
Road Studs (Code H) Die-cast aluminium reflectorised studs for lane,
16,200 nr
February 2007
warning or centre line. R904
Chevron Lines (Code I)
11,000 m2
As per detail drawing R905
Bus Layby/Edge Line (Code J)
2,000 m
Broken lines of 1.0m mark, 1.m gap, width 0.10m. R906
Arrow (Code L)
207 nr
As per detail drawing R907
Edge Line (Code R)
144,500 m
Yellow continuous line width 0.2m R908
Intermittent Line (Code F)
1,675 m
Line of 3.00m marks, 3.00m gap, width 0.10m changing to solid line at sharp bends. R909
Bar marking (Code Q)
2,640 m
As per details 0.40m wide. R910
Painting of Road Kerbs
1,800 m
Painting with chlorinated yellow & black paint. CLASS R - TOTAL TO SECTION SUMMARY Page 16 of 19 Truck Haul Road
2C/16
BD
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS R - ROADS AND PAVINGS COLLECTION From page 2C/12 From page 2C/13 From page 2C/14 From page 2C/15 From page 2C/16
CLASS R - TOTAL TO SECTION SUMMARY Truck Haul Road
2C/17
BD
Page 17 of 19
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS X - MISCELLANEOUS WORK Safety Fence (Provisional) X181.1
Tensioned Corrugate Beam (TCB), single sided,
4,800 m
for safety fences and barriers X181.2
Blocked Out Beam (BCB) for safety barriers at the
100 m
junctions X189.1
Approach terminal with end posts and concrete
8 nr.
foundations X189.2
Departure terminal with end posts and conrete
8 nr.
foundations To MEW Services Corridor (All Provisional) X189.3
Supply, install and paint concrete bollards adjacent to
60 nr
Batelco Access Road X189.4
Supply and install boom gates to MEW service road
2 nr
Street Lighting (Civil Work) (All Provisional) X590.1
Excavated and backfill trenches for low voltage street
5,500 m
lighting cable depth not exceeding one meter X590.2
Concrete base for 16m high light column
6 nr.
X590.3
Concrete base for 12m high light column
135 nr.
X590.4
Concrete base for feeder pillar
6 nr.
X590.5
Transport from Central Stores and install 16m high
6 nr.
column with 400 watt high pressure sodium lantern, double arm X590.6
Transport from Central Stores and install 12m high
135 nr.
column with 400 watt high pressure sodium lantern, single arm. X590.7
Transport from Central Stores and install 12m high
10 nr
column with 400 watt high pressure sodium lantern, double arm. X590.8
Transport from Central Stores and install feeder
6 nr.
pillars X590.9
Transport and install LV 16mm2, 4 core, XLPE/SWE/
7,500 m
PVC cable X590.10
Transport and install LV 16mm2, 4 core, XLPE/SWE/
2,500 m
PVC cable X590.11
Sand Filling CLASS X - TOTAL TO SECTION SUMMARY
Page 18 of 19 Truck Haul Road
600 m³ 2C/18
BD
February 2007
TRUCK HAUL ROAD - NEAR ASKAR SCHEDULE OF RATES AND PRICES PART 2 CLASS B GROUND INVESTIGATION
2C/1
CLASS D DEMOLITION & SITE CLEARANCE
2C/2
CLASS E EARTHWORKS
2C/5
CLASS F WORK IN CONNECTION WITH SERVICES
2C/6
CLASS I PIPEWORKS - PIPES
2C/7
CLASS K PIPEWORKS - MANHOLES AND PIPEWORKS
2C/10
ANCILLARIES CLASS L PIPEWORKS - SUPPORTS AND PROTECTION
2C/11
ANCILLARIES CLASS R ROADS AND PAVINGS
2C/17
CLASS X MISCELLANEOUS WORK TOTAL CARRIED TO GRAND SUMMARY Truck Haul Road
2C/18 2C/19
BD
Page 19 of 19
February 2007
TRUCK HAUL ROAD SCHEDULE OF RATES AND PRICES GRAND SUMMARY
PART
PART DESCRIPTION
PAGE NO.
1 PRELIMINARIES AND GENERAL ITEMS
1/11
3 ROADWORKS
3C/21 SUB TOTAL - BD
SUB TOTAL - BD General Contingency Allowance Allow 5% for General Contingency Allowance, to be expended in whole or in part as expressly directed in writing by the Engineer.
Truck Haul Road
TOTAL TO FORM OF TENDER (BD)
AMOUNT BD/FILS
0 0
0 February 2007
AMOUNT BD/FILS
0 0
0 0
0 0
0 February 2007
AMOUNT BD/FILS
0 0
0 0 0 0 0 0
0
February 2007
AMOUNT BD/FILS
0 0
0 February 2007
AMOUNT BD/FILS
0 February 2007
AMOUNT BD/FILS
0 February 2007
AMOUNT BD/FILS
0
AMOUNT
BD/FILS
0
AMOUNT BD/FILS
0 February 2007
AMOUNT BD/FILS
1000.000 100000.000 10000.000 1000.000 50000.000 10000.000 30000.000 115000.000
317000.000
AMOUNT BD/FILS
0 0 0 0 0 0 0 0 0 317000.000
317000.000 February 2007
0 0 0 0
0 0 0 0 0 0
0
0
0 0 0 0
0
0 0 0 0 0 0 0 0 0 0 0
0
0 0 0 0 0
0 0 0 0
0 0 0
0 0 0 0 0 0 0 0 0 0 0
0
0
0 0 0
0
0
0 0 0 0
0
0
0
0 0 0
0 0
0
0 0
0 0 0
0 0 0
0
0
0 0 0 0
0 0
0 0
0
0.000 0.000
0.000
0 0 0 0 0 0 0 0 0 0 0 0
0.000
0 0 0 0 0 0 0
0.000
0
0
0
0
0 0 0 0 0
0 0 0.000
0.000 0.000 0.000 0.000 0.000 0.000
0
0 0 0
0 0
0 0 0 0 0
0
0
0 0 0 0 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
AMOUNT (BD)
317000.000
February 2007