ON SITE SAFETY MANAGEMENT

Lever-VietNam Thu Duc Factory

On site safety Management

Contractor Safety Management Process 04 Basic Steps: Here is the target point of this presentation

Approval Process

Contractor Orientation

On Site Management

Post Job Evaluation On site safety Management

The Target Point Of Presentation • Review existing on-site management procedure. • Upgrade On site management procedure. • Guideline unsafe act audit. • Guideline use new checklists.

On site safety Management

Step 1: Contractor Selection & Approval

Identification of Contractors

Send out Pre-Qualification Questionaire

Analyze responses to the Questionaires

Evaluate and select Contractors

Questionaire forms

Preferred Contractor List

Feedback for Corrective Action

On site safety Management

Post Evaluation Daily Inspection

List of qualified Contractors

Step2:Contractor Orientation Test sheet

Preferred Contractor List

Annual Orientation with Top Management

Site Safety Inductions for all Contractor workers

Workers to pass test

Induction Documents

Acknowledgement slip

Start working

On site safety Management

List of workers to HR for namebadges

Workers to acknowledge being trained

Step4: Post Job Evaluation Review contractor performance

Fill in PJE checklist

Write Project Evaluation Report

PJE submission

PJE checklist

PJE evaluation and feedback

On site safety Management

PJE recording

Existing Contractor Safety Management Process Work Permit Form

Work site control

Daily on-site safety meeting

Risk assessment

Work Permit

Equipment safety check for welding

Equipment safety check

Daily Inspection checklist Work high checklist. Electrical check list

WP & Inspection checklist submission

Close out Work Permit

On site safety Management

Fill in daily inspection checklist

Work site inspection

Other high risk tasks

New Contractor Safety Management Process NC/Blame free check Daily inspection check list Correction Action/Plan Daily Discussing

Risk assessment

on-site

Work Permit

Work Site Control

Equipment safety check

(Start Working)

Other high risk Task

Work site inspection

Some more high risk found

Fill in daily inspection checklist

Unsafe

Unsafe

Condition

Acts

Correction

Risk Assessment data

Action/plan

Note: Existing flow Additional flow

WP & Inspection checklist submission

On site safety Management

Close out Work Permit

Write Project Evaluation Report

Work Site Control

- Sign In / Out at Designated Point - Use Badges / ID if Appropriate - Limit Contractor to Designated Areas - Limit Unnecessary Trucks / Vehicle Traffic

On site safety Management

DAILY DISCUSSION • • • •

Review Planned Work Activity Review Potential Hazards. Identify Permit required Work Discuss Safe Work Practices / Precaution ( LOTO/PPE/Work at

Height) • Review NC/Blame free • Review Daily Inspection CheckList

On site safety Management

RISK ASSESSEMENT An approach is appropriate: • Ensure all Hazards and resultant risk are Considered. • Ensure that what happens in practice is Considered. • Ensure all groups of personnel are covered. • Identify any group of workers Particularly at risk. • Examine existing preventative measures for effectiveness. On site safety Management

RISK ASSESSEMENT It is essential to record all assessments: • All significant hazards and risk are identified. • A program of actions can be set up, management & measures to eliminate/reduce/control the identified risks. • The responsibilities for communicating and managing the actions are clearly identified. On site safety Management

WORK PERMIT

Review : • • • • •

Equipment safety check Other high risk Task Safety instruction/Requirements. Task analysis data Correct action/plan(last day)

On site safety Management

WORK SITE INSPECTION • Housekeeping • Personal Protective Equipment. • Work at high risk • Use work permit • Electrical Safety/Loto. • Hazardous Chemical/ Flammable Liquid

On site safety Management

IF COMPLIANCE WITH PERMIT • Fill in daily inspection check list

• Close out work permit

• WP&Inspection Checklist Submission

On site safety Management

When: • To try not following permit/procedure. • To be conduct Consistently Violates safety rules

When: • Be unaware of caught in,on, or between objects can be harmful to themselves or other On site safety Management

Major Non-Compliance with permit

Minor Non-Compliance with permit (UNSAFE-ACTS)

IF MAJOR NON-COMPLIANCE WITH PERMIT

STOP …for Safety

On site safety Management

IF MAJOR NON-COMPLIANCE WITH PERMIT

• DISCUSSING • ISSUE NON COMPLIANCE. • ISSUE SAFETY REQUIREMENT S On site safety Management

UNSAFE ACTS IF: • Not following Safety Rules. • Not following Established procedure • Taking Unnecessary chances • Taking shortcuts • Hurrying • Using poor Judgment • Not maintaining good housekeeping... On site safety Management

IF MINOR NON-COMPLIANCE WITH PERMIT

• Observation • Discussion • Fill in Observation Check List • Follow Up On site safety Management

How To Do Observation • At work site stop for few minutes. • To observe the work activity. • Be alert for unsafe practices that are corrected as you enter the area. • Categorize activities systematically - Action of people. - Position of people. - Person protective equipment - Use of Tools. - Suitability of equipment - Procedures. • Question “why?” and “What if…?” (Keep an open mind) • Recognize good as well as poor working practices. • Do not take notes whilst observing activities, It can create distrust. On site safety Management

How To Proceed Discussion • • • • • •

Do not rush. Take time to put employees at ease. Be open and direct, but not confrontational. Question and discuss, do not lecture, keep listening. Guide discussion, do not manipulate. Comment good performance. Encourage employees to discuss their safety concern and to offer ideas. • Write down their concerns and ideas and ensure that they are followed up. On site safety Management

How To Record CHOÏN LÖÏA

BAÙ O CAÙ O

NGÖØ NG COÂ NG VIEÄ C QUAN SAÙ T



TRAO ÑOÅ I

Mark action unsafe act

BAÙ O CAÙ O

Obersevation Check List

Ñoàbaû o hoäcaùnhaâ n Ñaà u, maé t , muõ i, tai Thieá t bòchoá ng ngaït Baû o veätay vaøcaù nh tay Traø n hoaë c baé n ra ngoaø i Caù c thieá t bòchuyeâ n duø ng

Baû o veäbaø n chaâ n vaøchaâ n Thieá t bòcaù ch ñieä n Thieá t bòchöõ a chaù y Daâ y an toaø n

Moâ i tröôø ng ñang laø m vieä c (Nguyeâ n nhaâ n gaâ y toå n thöông)

Ñoàngheàvaøthieá t bò Khoâ ng ñuù ng cho coâ ng vieä c Thao taù c sai Khoâ ng an toaø n,quaùcuõ

Caà n theâ m ñoàngheà Giaá y pheù p cho thieá t bò

Qui trình Khoâ ng ñaà y ñuû Khoâ ng bieá t, khoâ ng hieå u

Khoâ ng theo ñuù ng qui trình

Khu vöïc thi coâ ng Goïn gaø ng ngaê n naé p Ngaê n caù ch, coâlaä p

Nguoà n gaâ y oânhieã m Bieå n baù o roõraø ng

On site safety Management





Unsafe act observed record

Immediate corrective action record area. Action to prevent recurrence record area.

1. Haø nh ñoä ng khoâ ng an toaø n

Tieá p xuù c vôù i Enzymes Coùtính ñoä c haïi(sôn, hôi) Döôù i hoásaâ u, trong boà n Nguy cô do choà ng chaá t(Ñoå ) Buïi, chaù y, oà n , noå



2. Haø nh ñoä ng ngaê n ngöø a

Nguy hieå m tieà m aå n caä n keà Khaûnaê ng teùngaõtreâ n cao Tieá p xuù c vôù i nhieä t ñoäcao Tieá p xuù c vôù i nguoà n ñieä n Coágaé ng quaùsöù c Xe löu thoâ ng

Hoï teâ n:________________________________________Ngaø y ______Thaù ng______N

Thay ñoàngheà Coâlaä p thieá t bò Taê ng cöôø ng giaù m saù t Giaá y pheù p coâ ng taù c

BoäPhaä n/Khu Vöïc__________________________________ Thôø i Gian_____________

Ñieà u chæ nh thieá t bòbaû o hoä Thay ñoå i vòtrí laø m vieä c Boátrí laïi coâ ng vieä c Ngöø ng ngay coâ ng vieä c

Quansaù t haø nh ñoä ng khoâ ng an toaø n

Haø nh Ñoä ng töù c thôø i

Correction Action/Plan • Record observation check list form will show where the weaknesses are, where procedures require strengthening, where training is needed. • This information helps improve task analysis data/ Project evaluation report. • Action plan should be discussed in the flowing daily discussion on-site. • Send observation to safety Department For analysis to: – Monitor the audit process. – Identify performance trends. – Assess overall strengths/ weaknesses / training needs. On site safety Management

PROJECT EVALUATION REPORT

• When: After the Completion of Each Job • Maintain Documentation for Future Evaluation

On site safety Management

ACTION PLAN OF PROGRAME WHEN: • To Standardize the risk assessment data. • To present techniques to good safety supervision. • Upgrade master permit to work. • Set up supporting permits for high risk work.

On site safety Management

01/04/03 30/04/03 ??? ???

Related Documents

Training Material
May 2020 9
Cics Training Material
November 2019 11
Material
May 2020 52
Material
November 2019 67

More Documents from ""

Training Material
May 2020 9