Tqm 4

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Tqm 4 as PDF for free.

More details

  • Words: 711
  • Pages: 8
Total Quality Management Products are developed through the phases of concept, design, and production preparation Total Quality Management has three major elements Basic improvements in clarity and unity (basic concurrent engineering) Quality function deployment (QFD) Quality engineering using robust design

Total Quality Management

1

Total Quality Management  Goals for DOD Version of TQM  Change in emphasis from defect correction to defect prevention  Continuous improvement of products rather than satisfaction with adequate quality  Stabilization and improvement of product rather than dependence on inspection  Ensuring conformance with properly defined requirements and elimination of waivers  Awarding contracts based on optimum life–cycle cost rather than lowest procurement cost  Emphasizing quality, cost, and schedule rather than just cost and schedule

 These goals can only be met through a strong commitment on the part of management—constancy of purpose Total Quality Management

2

Statistical Process Control     

Improved quality is means to achieve higher profits and lower costs The process or system is the cause of 85% of quality problems Only management can improve the system Employees will find their own defects and not pass them own Suppliers are critical members of the team—they must be treated as an extension of in–plant operation to ensure reliability and quality. Suppliers cannot be selected on cost alone.  Every employee should have some understanding of statistical quality control  Numerical quotas for the work force, numerical goals for management, and annual rating and merit systems must be eliminated  A vigorous program of training and self–improvement for all employees must be instituted Total Quality Management

3

Deming’s 14 Points 1. Create constancy of purpose for improvement of product and service. 2. Adopt the new philosophy. 3. Cease dependence on inspection to achieve quality. 4. End the practice of awarding business on the basis of price tag alone. Instead, minimize total cost by working with a single supplier. 5. Improve constantly and forever every process for planing, production and service. 6. Institute training on the job. 7. Adopt and institute leadership. 8. Drive out fear. Total Quality Management

4

Deming’s 14 Points (cont) 9. Break down barriers between staff members. 10. Eliminate slogans, exhortations, and targets from the workplace. 11. Eliminate numerical quotas and numerical goals for management. 12. Remove barriers that rob people of pride of workmanship. Eliminate the annual rating or merit system. 13. Institute a vigorous program of education and self–improvement for everyone. 14. Put everybody in the company to work to accomplish the transformation.

Total Quality Management

5

Concurrent Engineering Simultaneous engineering or integrated product and process development Improved process which provides better clarity  Concurrent processes  Focus on quality, cost, and delivery (QCD)  Emphasis on customer satisfaction  Emphasis on competitive benchmarking

Closer cooperation (better teamwork) which creates better unity within the team  Integrated organization (multifunctional teams)  Employee involvement  Strategic relations with suppliers  Empowered teams including suppliers

Total Quality Management

6

Decision Making  Many decisions must be made during design and development  Who makes the decisions?  What information is available to base the decisions on?

 TQM decisions making differs from traditional process by  Team decisions (utilize collective experience, and develop commitment)  Visual, connective methods, usually employing large displays on paper (focus team, and revel interrelationships)  Customer focus  Optimization of critical decisions  Problem prevention

 Level of decisions  Necessary but not critical—made by individuals—perhaps millions  Critical—made by teams or small groups—thousands or more  Very critical—collective experience and systematic optimization—hundreds Total Quality Management

7

Problem Prevention  Problems are found. Wishful thinking allows many to be swept downstream. A large number end up in marketplace.  Problems are found. The total quality control approach is used to find and correct the root causes of the problem. The information is fed upstream so that the same problem is not introduced in a later program.  Problems are prevented. Potential problems and their root causes are identified before they occur. Optimization positions the design as far as possible from all potential problems. The information is fed down–stream to ensure the the problem–prevention decisions are understood and maintained, to avoid the inadvertent later introduction of the problem.

Total Quality Management

8

Related Documents

Tqm 4
November 2019 5
Tqm-unit-4
April 2020 7
Mo 4 Tqm
December 2019 51
Tqm
November 2019 55
Tqm
June 2020 24
Tqm
November 2019 51