STARION INDIA PVT. LTD.
QUOTATION FOR
UG3 PCB ASSEMBLY CUSTOMER
"PRICOL LIMITED"
Ref No: ST15112008 M/s. Pricol Limited
Kind attn: Mr. Ashok Kumar Sub:
Quotation for PCB Assembly & Routing of UG3
Dear Sir, This is with reference to our ongoing discussions regarding the manufacturing of UG3 Model PCB, Please find below our quote for the jobwork of the cards. S.No.
Consignment Basis
Jobwork Charges (In Rs.) Lot Size
10~15K
A.
One time development cost (Not amortized and one time expenses to be reimbursed)
1 2
D. 1 2 3
Router Jig Stencil for Bottom Side ( for 50K Strokes) Total Development Cost Manufacturing Cost:( per PCB) Setup Loading Cost SMT Assembly Cost Through Hole Assembly Cost Total Manufacturing Cost ICT Testing Cost: (Per PCB) ICT Machine Amortization Cost Fixed Testing Cost Variable Testing Cost Total ICT Testing Cost Routing (De-panelizing) Cost: (Per PCB) Routing Machine Amortization Cost Fixed Routing Cost ( Batch setup/ change over time taken 0 Hour) Variable Routing Cost
D. 1 2 3 4
Total Cost (Manufacturing+Routing (De-panelizing) ) Other Expenses: Packing Material Dispatch Insurance & Bank Guarantee Cost Tax on job work if any
B. 1 2 3 C. 1 2 3
As per actual 12,500.00
12,500.00 1.44 71.70 4.80
77.94 NA NA NA
0.00 2.00 0.65 0.50 3.15 81.09 Provided by Pricol/ As per Actual As per actual As per actual To be paid by Pricol
Terms And Conditions: 1. The above prices are based on the assumption that Design & Quality of components meets International Standard for Manufacturability, Testability,Inspectability & Repairability. 2. All components should be provided in full reels (Machine Mountable) by Pricol at Starion, Pune. 3. Attrition for chip components will be 2% and 0% / case to case for IC's and connectors etc. 4. All Manufacturing information like drawings, documents, list and specifications of consumables & software related to procurement & manufacturing is to be provided well in advance. Contact persons for procurement & engineering requirements to be defined at both sites for smooth flow of information & timely implementation 5. All duties and taxes will be charged as per actuals. 6. Transit and Starion in house insurance will be to Pricol account. 7. The payment terms will be against delivery / as mutually agreed. 8. The above price is valid for a per lot/ month volume of minimum quanity as mentioned above. 9. The accetable rejection rate will be as the Q policy to be formulated by Pricol & Starion 10. In case extra activities are required by Pricol other than above, it will changed extra. 11. All necessary Jigs and Fixtures shall be provided by M/s. Pricol. We are confident of our quality systems and we look forward to your valued order. Assuring you our best services always. Thanks and best regards, For Starion India Pvt. LTD.
Managing Director
Development Cost Jig & Fixtures Stencil - Bottom
12500 Rs. Development Activities
1 2 3 4 5 6 7
Stencil Verification Material Verification Conversion of documents SMT M/c Program generation Dek Paste Printer Settings Reflow Profile Settings Manual Soldering Process settings
ment Cost
SMT Manufactruing Cost Lot Size (Minimum) S. No.
Component Description
Qty
1 Chip Resistors 2 Chip Capacitors 3 Zener Diodes & Diodes (3 Pins) 4 LED (Small Size) 5 Transistors 6 QFP (Pitch 0.5) 7 SO IC1 8 SO IC2 9 Odd Size Components Total SMT Charges (A) Throgh Hole Cost 1 Crystal 2 Electrolytic Cap. 3 Connector Total Through Hole Charges (B) Total Manufacturing Charges (C=A+B)
Joint per Part Total Joints
71 40 12 8 11 1 1 1 17 162
2 2 3 2 3 64 14 8 1
142 80 36 16 33 64 14 8 17 410
1 5 1 7 169
2 2 20
2 10 20 32 442
Odd size components Part no. TZ1 XTL1 D1,D3,D6,D7. LED Big size U1 SW302
SO IC
Description Diode TVS SMC Crystal Diode S1-M LED L1TOL17 IC TLE4274-GV50(INFINEON) Push switch 50mA (SMD) Total IC MC 74ACT125DRG2(14PIN) IC M93C46-WMN 3, SOIC 8 PIN
Qty. 1 1 4 9 1 1 17 2
10~15K Rate/ Joint
Total Amount
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.75
21.30 12.00 5.40 2.40 4.95 9.60 2.10 1.20 12.75 71.70
0.15 0.15 0.15
0.3 1.5 3 4.80 76.50