To, The Project Manager Icfai Project Raipur Sub: Regarding Construction

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View To, The Project Manager Icfai Project Raipur Sub: Regarding Construction as PDF for free.

More details

  • Words: 109
  • Pages: 1
To, The Project Manager ICFAI Project Raipur Sub: Regarding construction of boundary wall of Le Magnus at Kumhari Ref: (1) Work order no. (2) Work order no. Dear Sir, With reference to above cited work order we are constructing Boundary wall of Le Magnus. Apart from the 400m length which was not cleared, we have completed almost full length except a small length of 14 m, gate & grill portion, some part of coping, a small quantity of plaster, a part of back filling, closing of scaffolding holes, painting. As we have not completed the work, we have no objection if you get the work completed through other agency

Related Documents