PROJECTS UNDER REP. TG GUINGONA III (Status of projects as of November 2008) BARANGAY LGU
Kulasihan
Bugcaon
PROJECT Construction of Municipal Trial Court Bldg.
MUNICIPALITY OF LANTAPAN AMOUNT 500,000.00
SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE ISSUED AGENCY IMPLEMENTOR CDF-2T-10M-05 A-05-03889/ 08.25.05 DPWH-I0-DEO Phase I Completed -waiting for additional fund for continuation
1.Construction of Multi- 1,000,000.00 purpose Bldg. (Covered Court)
CDF-30M-2T-04 A-04-03888
2.Continuation of the Construction of Multi- 600,000.00 purpose Bldg. (Covered Court) PhaseII 3. Livelihood Project for the SK of Kulasihan 100,000.00 4. Renovation of SK Office 40,000.00
CDF-20M-3T-05
Construction of Water System
1,000,000.00
Purchase of 1 computer set for Bugcaon National 50,000.00 High School
DPWH I- DEO
MOA w/ Brgy.
TURNED-OVER/ 05.08.07
MOA with the organization
Turned-over 09.10.08
ROCS-05-06927/12.1 DPWH I- DEO 4.05 CDF-10M-1T-07 CDF-1T-07
DTI-Buk
ROCS-07-08749/ 11.09.07 CDF-30M-2T-04 A-04-03888
DSWD-Reg 10 Under Small Infra DPWH I- DEO Admin.
Check issued/ October 2008 TURNED-OVER /08.08.05
DEPED DivisionBUK
Turned-over 07.04.06
CDF-05
1
BARANGAY Bantuanon
PROJECT
AMOUNT
SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE ISSUED AGENCY IMPLEMENTOR CDF-20M-3T-05 A-05-06489/ 12.12.05 DPWH Phase II Completed
Construction of MultiPurpose Bldg (Covered Court)
500000.00
Kibangay
Construction of Water System
1,000,000.00
CDF–5M-2T-04 ROX-04-251 / 11.18.04
DPWH I- DEO
Contractor
Alanib
Construction of Flood Control Canal Lining
700000.00
CDF-10M-1T-04 A-05-01415/ 03.09.05
DPWH
Contractor
TURNED-OVER 04.05.06
Kaatuan
Construction of MultiPurpose Bldg. (Brgy Office)
500,000.00
1.CDF-10M-1T-0 1.A-05-01415/ 4 03.09.05
1.DPWH
Contractor
Phase I Completed *waiting for additional fund for continuation
Baclayon
Continuation of Multi- 500,000.00 purpose Bldg (Brgy Office-Phase II) 1. Legal assistance-Land *** conflict of BAMCO (Baclayon Multipurpose Coop) 2. Construction of Multi-purpose bldg. (Covered Court)
1,500,000
CDF-1T-10M-07 A-07-07323/10.18.07 DPWH-I-DEO
*waiting for additional fund for continuation TURNED-OVER 04.05.06
-Project Completed
Decision delivered
CDF-20M-1T-08 A-08-06303/ 08.27.08 DPWH I- DEO
Pre-implementation activity 2
BARANGAY Victory Poblacion
PROJECT
AMOUNT
Construction of Multi- 1,000,000.00 purpose Bldg. (Covered Court) Phase I Continuation of the Construction of Multipurpose Bldg. (Covered 600,000.00 Court)Phase II
Capitan Juan Songco Balila
SOURCE OF FUNDING
CDF-30M-2T-04 A-04-03888
DPWH I- DEO
Contractor
STATUS
TURNED-OVER
CDF-20M-3T-05 ROCS-05-06927/12.1 DPWH I- DEO 4.05
Construction of Farm to Market Road of Sitio Molabuk 1,000,000.00
DA-07
Purchase of 1 computer set for Balila ES
Sen. Villar
Purchase of 1 computer set for Lantapan National High School
SARO NUMBER IMPLEMENTING PROJECT AND DATE ISSUED AGENCY IMPLEMENTOR
For Implementation
DepEd-Division of DepEd-Division of Bukidnon Bukidnon
Turned-over
DepEd-Division of DepEd-Division of Bukidnon Bukidnon
Turned-over
3
Cawayan
Construction of Multi- 500,000.00 purpose Bldg (Covered Court)
CDF-20M-3T05
A-05-06489/ 12.12.05 DPWH I-DEO
Contractor
Phase I Completed
A-08-06303/ 08.27.08 Continuation of Covered 1,000,000.00 Court
CDF-20M-1T-08
DPWH I-DEO
Pre-implementation activity
Basac MUNICIPALITY OF IMPASUGONG BARANGAY
LGU
PROJECT
AMOUNT
Community 170,750.00 Handicrafts plus 30,000 Workshop for Small, (20 tribal weavers) Mat, Basket and Hinabol Weavers of Impasugong Financial assistance to LGU 400,000.00
Capitan Bayong
Impalutao
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT STATUS AND DATE AGENCY IMPLEMENTOR ISSUED DSWD-REG 10 LMI Completed
CDF-20M-3T-05 1.A-04-04701 / 12.15.04
LGU
LGU
Implemented
1.DPWH I- DEO
1. MOA w/ LGU
Phase I Completed
1. Construction of 1. 400,000.00 Multi-purpose Bldg. (Covered Court) Phase I 2. Continuation of the 2. 500,000.00 Construction of Multipurpose Bldg (Covered Court) Phase II
1. DPWH-CO-04 (Minority)
Spring Dev’t. Project 700000.00
CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO 12.14.04
2. CDF-20M-3T-06 2. 2.DPWH I- DEO A-05-06489/12.12.05
Phase II Completed
Admin.
Phase I Completed * waiting for additional fund for continuation 4
Kibenton
Construction of Water 1. 500,000.00 System
1.CDF-30M-2T-04 1.A-04-03888 / 12.13.04
1.DPWH I- DEO
1. Admin.
Project Completed
Cawayan
Construction of School Building
CDF-10M-2T-05 A-05-03889/ 08.25.05
DPWH I-DEO
MOA w/ LGU
Completed as per amount programmed
400000.00
Hagpa
BARANGAY
Dumalaguing Bontongon
Sayawan Guihean La Fortuna
PROJECT
AMOUNT
Construction of 500000.00 Water System Construction of 500000.00 Multi-purpose Bldg. (Health Center)
Construction of 500,000.00 School building w/ 2 Classrooms.
Rehabilitation of La 1,000,000.00 Fortuna Communal irrigation System
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT STATUS AND DATE AGENCY IMPLEMENTOR ISSUED CDF-20M-3T-05 A-05-06489/ DPWH I-DEO By Admin Project completed 12.12.05 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO MOA w/ LGU Phase I Completed 12.13.04 * waiting for additional fund for ceiling
CDF-30M-2T-04 A-05-02838/ 07.08.05
NIA-5M-06 (thru the initiative of Cong. Guingona)
DPWH I- DEO
MOA w/ LGU
Phase I Completed *waiting for additional fund for completion Implemented
5
Poblacion
Construction of 200,000.00 Pathway at Impasugong Central Elemntary School
Villar-05 Budget A-05-02689/ Continuing 07.1.05 Appropriations
Turn-over of Guns
PNP-CO
DPWH I-DEO
Turned-over
NA
Turned-over
Bulonay
BARANGAY
Kalabugao
PROJECT
AMOUNT
1.Construction of 250,000.00 Water System at Sitio San Vicente 2.Construction of 250,000.00 Water System at Sitio San Fatima 3.Ricemill Project to 100,000.00 KADULUMHAN (275 rural and tribal (Kababayen sa women) Dumagat ug Lumad sa Hagpa Nagkahiusa)
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT STATUS AND DATE AGENCY IMPLEMENTOR ISSUED CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO MOA w/ LGU TURNED-OVER 12.14.04 10.15.05 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO MOA w/ LGU TURNED-OVER 12.14.04 10.15.05 LMI
Completed
6
MUNICIPALITY OF CABANGLASAN BARANGAY
LGU
PROJECT
1.Completion of Non- Formal Learning Center
AMOUNT
250,000.00
2.Maintenance of Road for all the brgys 1,000,000 3. Financial assistance to LGU
500,000.00
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT STATUS AND DATE AGENCY IMPLEMENTOR ISSUED CDF-10M-1T-05 ROCS-05-01686/ LGU LGU Implemented 03.31.05
CDF-20M-3T-05
Implemented
ROCS-05-06855/12 LGU CDF-1T-20M-08 .14.05 ROCS-08-06200/ 08.21.08
LGU
LGU
Waiting for the NCA
7
Iba
Cananga-an
Capinonan
1. Completion of 300,000.00 Multi-purpose Bldg. (Brgy Office)
CDF- Sen. Villar-04
A-05-02689/ 07.01.05
DPWH I- DEO
2. Construction of 3,000,000.00 Water System 1.Construction of 500,000.00 Hanging Bridge (Pulangui River) 2. Const. of Farm to 2,000,000.00 Market Road
CDF-20M-3T-08 A-08-06303/ 08.27.08 CDF-30M-2T-04 A-04-03888 / 12.13.04 DA-5M-08 A-08-02485/ 03.12.08
DPWH I- DEO
1. Purchase of lot for 250,000.00 National High School 2.Rehabilitation of Capinonan 400,000.00 Communal Irrigation System
BARANGAY
PROJECT
AMOUNT
Contractor
TURNED-OVER
Implemented
DPWH I- DEO
Contractor
TURNED-OVER 05.02.07
DPWH I- DEO
MOA w/ LGU
on the process of preparing the MOA
CDF-05
LGU
Barangay Government
Implemented
NIA-5M-06
NIA
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT AND DATE AGENCY IMPLEMENTOR ISSUED
Implemented
STATUS
8
Anlugan
Paradise
Poblacion Freedom
Construction of 300,000.00 Add’l. Water System
CDF-30M-2T-04 A-04-03888 / 12.13.04
Repair of Classroom E/S 160,000.00
AVE Party List
1. Spring Development of Brgy. Proper
1. CDF- Sen. Angara-04
200,000.00
2.Completion of Hanging Footbridge 80,000.00 at Bobonawan Spring Development 50000.00 at Sitio Buso Playing Device for 55000.00 Day Care Centers
SARO No. B-07-04243 1. A-04-04628 / 12.15.04
DPWH I- DEO
Contractor
DPWH I-DEO
TURNED-OVER 04.04.06
Implemented
1.DPWH I- DEO
1. Admin.
TURNED-OVER 04.04.06
2. DSWD-Reg.X
2. DSWD-Reg.X
2. Project Completed
DPWH I- DEO
Admin.
Project Completed
DSWD-Reg.X
DSWD-Reg.X
TURNED-OVER 04.04.06
2. DSWD-CO-04 2. .N/A
CDF- Sen. Angara-04 DSWD-CO-04
A-04-04628 / 12.1504 N/A
Mandahican
BARANGAY
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT AND DATE AGENCY IMPLEMENTOR ISSUED
STATUS
9
Lambagan
Building Capabilities 120,000.00 of % Women Organizations to (125 women Implement and microrentrepreneurs) Sustain SEA-K ( Sinanglanan, San Martin, Malaybalay, Imbatug, Cabulohan, Lambagan, Cabanglasan) Additional funds for microlending (Sinanglanan, San Martin, Imbatug, 279,000.00 Cabulohan Lambagan) Construction of Multi-purose Bldg. (Brgy Office)
DSWD REG X
LMI
Completed
DSWD REG X
LMI
Implemented
500,000.00 CDF-1T-10M-07 A-07-07323/10.18.0 DPWH-I-DEO 7
Turned Over/ 12.10.08
10
BARANGAY
Imbatug
PROJECT
AMOUNT
Completion of Brgy 500,000.00 Office
SOURCE OF FUNDING CDF- 3T-05
SARO NUMBER IMPLEMENTING PROJECT STATUS AND DATE AGENCY IMPLEMENTOR ISSUED DPWH I- DEO Project Completed as per amount program
Building Capabilities 120,000.00 of % Women (125 Organizations to microentrepreneurs) Implement and Sustain SEA-K ( Sinanglanan, San Martin, Malaybalay, Imbatug, Cabulohan, Lambagan, Cabanglasan) Additional funds for microlending (Sinanglanan, San Martin, Imbatug, 279,000.00 Cabulohan (125 Lambagan) microentrepreneurs)
DTI-Bukidnon
Completed
DTI-Bukidnon
Implemented
DPWH-I-DEO
Project Completed
Completion of Brgy office 300,000.00 CDF-1T-10M-07 A-07-07323/ 10.18.07 Cabulohan
11
BARANGAY
Mauswagon
Dalacutan Jasaan
Mandaing
PROJECT
AMOUNT
Construction of 200,000.00 Squash Sotrage Bldg for Capinon, Freedom, Mauswagon Multipurpose Cooperative
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT STATUS AND DATE AGENCY IMPLEMENTOR ISSUED CDF-20M-3T-05 ROCS-05-06855/ LGU LGU TURNED-OVER 12.14.05 10.21.06
Construction of Multi-purpose Bldg. 1,000,000.00
CDF-20M-1T-08
Construction of Footbridge
DA-5M-08 A-08-02485/ DPWH I- DEO (thru the initiative 03.12.08 of Cong. Guingona) CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO 12.14.04
500000.00
Construction of 500000.00 Add’l. Water System for Mandaing Proper
A-08-06303/ 08.27.08
DPWH I- DEO
Pre-implementation activity MOA w/ LGU
On the process of preparing the MOA
Admin.
TURNED-OVER 04.04.06
12
MUNICIPALITY OF SAN FERNANDO BARANGAY
LGU Halapitan
PROJECT
Financial assistance to 2500000.00 LGU Construction of Flood 500,000.00 Control project at Halapitan National High School Nala Communal Irrigation System (New Project)
Kalagangan
AMOUNT
Promoting Farm Enterprise through goat production (Namnam, Magkalungay, Halapitan, Malayanan, Cayaga 1. Construction of Covered Court
500,000.00
SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED CDF-1T-20M-0 ROCS-08-06200/ LGU 8 08.21.08 CDF-20M-3T-0 A-05-06489/ DPWH I- DEO Contractor TURNED-OVER 5 12.12.05 08.11.06
NIA-5M-06 (thru the initiative of Cong. Guingona)
NIA
Implemented
DSWD REG X
LMI
Implemented
DPWH I- DEO
Contractor
Phase I Completed * waiting for additional fund for continuation
LMI
Completed
511,567.10 (6 community based operation)
1,500,000.00
2. Micro-lending Project 144,000.00 of Nagkahiusang (223 microKababayen-an sa entrepreneurs) Kalagangan
CDF-10M-2T
A-05-03889/ 08.25.05
13
BARANGAY
Namnam Bonacao
Tugop
Little Baguio Durian
Cabuling
Sacramento Valley
PROJECT
AMOUNT
Construction of Sumpitan 10000000.00 Bridge Constriction of spillway 1000000.00 for Namnam River
SOURCE OF SARO NUMBER IMPLEMENTING PROJECT FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED CDF-30M-2T-0 A-04-03888 / DPWH I- DEO Contractor 4 12.13.04 CDF-20M-3T-0 ROCS-05-06929/ DPWH I- DEO Contractor 5 12.14.05
Construction of Multipurpose Bldg. (Day Care Center)
400,000.00
Electrification
991,007.00
NEA-04
Construction of Canal
150,000.00 882,613.00
CDF-30M-2T-0 A-04-03888 4 NEA-04 N/A
2. Construction of Multi- 500,000.00 purpose Pavements
CDF-20M-1T-0 A-08-06303/ 8 08.27.08
DPWH I- DEO
Water System Dev’t. Project
CDF-30M-2T-0 A-04-03888 4
DPWH I- DEO
1. Electrification
CDF-30M-2T-0 A-04-03888 4
DPWH I- DEO
Contractor
STATUS
TURNED-OVER 04.31.07 Project Completed as per program -included in the appropriation of the on-going const. of Valencia-Talaingod Road of the DPWH Project Phase I Completed * waiting for additional fund for continuation
500000.00
N/A
FIBECO
DPWH I- DEO FIBECO
FIBECO
COMPLETED
Contractor FIBECO
TURNED-OVER 09.29.05 COMPLETED Pre-implementation activity
Admin.
TURNED-OVER 04.06.06 14
Sto. Domingo
BARANGAY
Malayanan
PROJECT
Construction of Farm to Market Road
AMOUNT
1,000,000.00
Construction of Farm to 1,000,000.00 Market Road
SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED DAR Funded E-05-07630/ DPWH I- DEO Lease Contract with Completed project 12.29.05 LGU *waiting for additional fund for continuation DA-07
DPWH I- DEO
Project On-going
Implemented
Kibongkog
San Jose Magkalungay
Promoting Farm based enterprise through Goat Production (Namnam, Magkalungay,Halapitan, Malayanan, Cayaga Construction of Water System
700,000 (6 community based organizations
150,000.00
CDF- Sen. Angara -04
Promoting Farm Enterprise through goat production (Namnam, Magkalungay,cayaga Halapitan, Malayanan,
511,567.10 (6 community based operation)
CDF-05
A-04-04628 / 12.15.04
DSWD-REG X
LMI
DPWH I- DEO
Admin
TURNED-OVER 04.06.06
DSWD REG X
LMI
On-going
15
Dao Nacabuklad
BARANGAY
Construction of Health 500000.00 Center Const. of Farm to Market 700000.00 Road
PROJECT
AMOUNT
CDF-1T-10M-0 A-07-07323/ 7 10.18.07 DAR-07
DPWH-I-DEO
Project completed
DPWH-I-DEO
Lease contract with Project Completed LGU of San Fernando
Mabuhay
Construction of Bridge
2000000.00
Matupe
Electrification
1110424.00
SOURCE OF SARO IMPLEMENTIN PROJECT FUNDING NUMBER AND G AGENCY IMPLEMENTOR DATE ISSUED CDFROX-04-251 / DPWH I- DEO Admin 5M-2T-04 11.18.04 NEA-04 N/A FIBECO FIBECO
Iglugsad Candelaria Palacpacan
Electrification
1006200.00
DOE
Cayaga
Promoting Farm Enterprise 511,567.10 through goat production (6 community (Namnam, Magkalungay, based operation) Halapitan, Malayanan, Cayaga
Bulalang
Completion of Water System 150000.00
CDF- Sen. Angara-04
Kawayan
1. Rehabililitation of Communal Irrigation system 2. Const. of Farm to Market Road
600,000.00
NIA-5m-06
700,000.00
DAR-07
N/A
FIBECO
FIBECO
DSWD-Reg.10
A-04-04628 / 12.15.04
DPWH I-DEO
STATUS
TURNED-OVER 04.06.06 COMPLETED
Project Completed Completed
Admin.
Project Completed -ready for turn-over
Implemented
DPWH-I-DEO
-Project completed as per amount programmed
16
CITY OF VALENCIA BARANGAY
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
IMPLEMENTING AGENCY
PROJECT IMPLEMENTOR
STATUS
17
LGU
1.Turn-over of Guns
N/A
PNP-CO
2. Financial Assistance 200,000.00 to LGU-DA
CDF-10M-1T-05
3.Financial Assistance to LGU for the projects 1,000,000.00 of DepEd Interim Division of Valencia
CDF-20M-3T-05
Turned-over LGU
DA-Valencia
Implemented
LGU
DepEd Valencia
Turned-over
LGU
Valencia City Fire Department
Turned-over
includes various projects of schools under Valencia Interim also;
a. Repair of guest house b. 2 units computer c. 3 iarcon units d. 1 unit photocopier machine
4.Financial Assistance to LGU( Valencia City Fire Department) for Purchase of Fire Extinguisher for 31 barangays of Valencia 700,000.00
CDF-20M-3T-05
18
BARANGAY
LGU
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
IMPLEMENTING AGENCY
PROJECT IMPLEMENTOR
STATUS
5. Installation of Fire 300,000.00 Hydrants to selected areas (Purok 3,5,7,11,12 and Hagkol) and Purchase of Two-way radios
CDF-20M-3T-05
LGU
Valencia City Water District
Turned-over
6. Financial Assistance to LGU Valencia for the 150,000.00 livelihood projects of Valencia Bukidnon Achievers Multipurpose Cooperative
CDF-20M-3T-05
LGU
Valencia Bukidnon Achievers Multipurpose Cooperative
Turned-over
LGU
Valencia Post Office
Turned-over
LGU
Valencia City Chamber Turned-over of Commerce & Industry
CDF-20M-3T-05 7. Financial assistance to LGU Valencia for the Philippine Postal 150,000.00 Corporation 8. Financial Assistance to LGU Valencia for the livelihood projects of Valencia City Chamber of 300,000.00 Commerce & Industry Livelihood proj
CDF-20M-3T-05
19
BARANGAY
PROJECT
9. Livelihood project for Market Vendors Assoc. of Valencia
AMOUNT
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
IMPLEMENTING AGENCY
PROJECT IMPLEMENTOR
STATUS
291,000,000
CDF-1T-07
DTI BUK
Turned-over/ 08.01.08
10. Livelihood project 291,000,000 for Valencia Muslim Vendors Association
CDF-1T-07
DTI BUK
Turned-over/ 09.10.08
CDF-1T-07
DTI BUK
Turned-over/ 08.01.08
CDF-1T-07
DTI BUK
Turned-over/ 08.01.08
Se. Villar-08
LGU
Turned-over/ 08.01.08
LGU
Waiting for the NCA
11. Livelihood project for Valencia Water 291,000,000 District Employees Multi-purpose Cooperative 12. Livelihood project for New Life Ministry 200,000.00 Foundation Inc. 13. Financial assistance to LGU for the Fire Victims of Valencia 500,000.00 Public Market 14. Financial assistance to LGU 1,000,000.00
CDF-1T-20M-08
ROCS-08-06200/ 08.21.08
20
BARANGAY
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
IMPLEMENTING AGENCY
PROJECT IMPLEMENTOR
STATUS
21
Poblacion
1.Well Drilling at New 2,000,000.00 Deep Well Site (near Alemars Area)
CDF-30M-2T-04 ROCS-04-04186 / 12.14.04
DPWH-I-DEO
MOA w/ Valencia Water District
Project Completed Project Completed
CDF-20M-3T-05 2.Completion of Valencia City Central Elementary School Multi-purpose Bldg
500,000.00
A-05-06489/ 12.12.05 DPWH-I-DEO
CDF-3T-05
Contractor
Implemented
3.Valencia NHS35,000.00 Installation of EMIS & NDEP Drop-in Centers
DepED-Valencia
CDF-3T-05 4.Valencia City Central School- Educational 30,000.00 Instruction Facilities for visually impaired pupils 5.Construction of Multi-purpose Bldg for Purok 17-C Poblacion 250,000.00
Implemented DepEd-Valencia
CDF-20M-1T-08 A-08-06303 DPWH I- DEO
Preimplementation activity
22
BARANGAY
Sinayawan
PROJECT
AMOUNT
1. Construction of 500,000.00 Multi-purpose Bldg. (Covered Court) Phase I 2. Construction of 500,000.00 Multi-purpose Bldg (Phase II) 3.Marketing Support to 150,000.00 organic rice producers in Valencia (MAKAKABUS) 4.PRIME- promoting Entrepreneurship and market enhancement program-capacity Building for PO’s
IMPLEMENTING SARO NUMBER PROJECT AGENCY IMPLEMENTOR AND DATE ISSUED CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor 12.13.04
SOURCE OF FUNDING
CDF-20M-3T-05
STATUS
Phase I Completed
Phase II Completed Completed
A-05-06489/ 12.12.05 DPWH I- DEO 38 women and men rice farmers
3 FARMERS ORGANIZATIO N
Implemented
344,000.00 Sinayawan and AFARBAMMCO CDF-3T-05 Implemented
5.Sinayawan CESPerimeter Fence
35,000.00
CDF-20M-1T-08 A-08-06303/ 08.27.08
Bagontaas
3. Construction of Covered Court (PhaseIII) Construction of Bgy. Office
1,000,000.00
1700000.00
Preimplementation activity
DPWH I- DEO
CDF-10M-2T
A-05-03889/ 08.25.05 DPWH I-DEO
Contractor
Phase I Completed
23
BARANGAY
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
IMPLEMENTING
AGENCY
PROJECT
STATUS
IMPLEMENTOR
24
Guinoyuran
1. Construction of 850,000.00 Concrete Flood Control
CDF- 5M-2T-04 ROX-04-251 / 11.18.04
2. Construction of Multi-purpose Building 500,000.00 (Covered Court)
DPWH-CO-04 (Minority)
A-04-04701 / 12.15.04
DPWH I- DEO
Contractor
DPWH I- DEO
Contractor
3. Construction of Solar Drier at Sitio Lake Apo
3.TURNED-OVER 04.03.06
CDF-05 100,000.00 4. Livelihood program for federation of Sitios & purok leaders of Guinoyuran 50,000.00
1.TURNED-OVER 04.03.06 2.Phase II Completed *waiting for additional fund for completion
A-05-02689/ 07.01.05
DPWH I- DEO
Contractor -Implemented
CDF-05 DSWD REG X
5. Purchase of 1 computer set for Guinoyuran ES
LMI
Turned-over Sen. Villar 50,000.00
25
BARANGAY
Guinoyuran
PROJECT
AMOUNT
SOURCE OF FUNDING
IMPLEMENTING AGENCY
6. Procurement of monoblock chairs for Guinoyuran NHSAnnex
100 pcs.
7. Capability Building for Cum Livelihood assistance to Women’s Association for its garment production project (Lake Apo womens)
50,000 plus CDF-05 additional 50,000 as loan
DSWD REG X
- additional 100,000 CDF-1T-07
DTI Buk
8. Magsal ES- Const. of Covered Court 10,000.00
CDF-05 Youth project c/o Deewai
SARO NUMBER AND DATE ISSUED
DSWD REG X
STATUS
Turned-over
LMI Implemented
Preimplementation activity
DepEd Valencia
DepEd Valencia
Implemented
DepEd Valencia
DepEd Valencia
Implemented
CDF-3T-05
9. Guinoyuran ES 50,000.00
PROJECT IMPLEMENTOR
CDF-3T-05
10.Cabanbanagan ES
Implemented 30,000.00
CDF-3T-05
DepEd Valencia
DepEd Valencia
26
BARANGAY
Batangan
Tongan-Tongan
PROJECT
AMOUNT
1. Community 91,000.00 Electrification (Purok6) 2. BatanganCESConst. of Covered Court ARC Greenfields (Irrigation Service Facilities & Service Roads) Lopez & Sto. Nino Area
IMPLEMENTING SARO NUMBER PROJECT STATUS AGENCY IMPLEMENTOR AND DATE ISSUED 1.DSWD-CO-04 N/A 1.DSWD-Reg.X DSWD-Reg.X Project Completed
SOURCE OF FUNDING
CDF-3T-05
Implemented
100,000.00 5,411,742.66
Loan/ LGU/ DAR N/A
DAR-LGU
LGU
DSWD-Reg.X
DSWD-Reg X
DSWD-CO-04 Improvement of Solar 70,000.00 Drier at Purok 3 Curvada Tongan-tongan Woodworking Project
Mabuhay
200,000.00 (33 rural workers) Const. of Multi-purpose 1000000.00 Bldg. (Covered Court)
Project Completed as per program
TURNED-OVER 04.03.06
Implemented CDF-10M-2T
A-05-03889/ 08.25.05
DPWH I- DEO
Contractor
Phase I Completed
27
BARANGAY
PROJECT
AMOUNT
Laligan
1. Construction of Water System
500,000.00
Kahaponan
Day Care Facilities (Charity DCC)
15,000.00
Construction of Multi- 1,000,000.00 purpose Bldg. (Covered Court)
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT STATUS AND DATE AGENCY IMPLEMENTOR ISSUED CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Admin. TURNED-OVER 12.14.04 09.23.05
DSWD-CO-04
N/A
DSWD-Reg.X
CDF-1T-10M07
A-07-07323/ 10.18.07 DPWH I-DEO
DSWD-Reg.X
TURNED-OVER 11.25.05
-Project Completedready for turn-over Signing of MOA
Mailag
Livelihood project for 120,000.00 AFARBAMCO Construction of Multi- 300,000.00 purpose Bldg. (Senior Citizen Bldg.)
CDF-1T/2T-07
DTI-BUK
CDF-30M-2T-04 A-04-03888 / 12.13.04
DPWH I- DEO
Mailag ES- Renovation of Classrooms 50,000.00
CDF-3T-05
Continuation of Multipurpose Bldg. (Senior Citizen Bldg.) 500,000.00
Contractor
Phase I completed *waiting for additional fund for continuation Implemented
CDF-20M-1T-08 A-08-06303/ 08.27.08 DPWH I- DEO
Pre-implementation activity
28
BARANGAY
Catumbalon
Lumbo
Mt. Nebo
PROJECT
AMOUNT
1. Expansion of Brgy. 300,000.00 Water System at P5 2. Catumbalon ESPerimeter Fence Construction of 1 Classroom
SOURCE OF FUNDING
SARO NUMBER IMPLEMENTING PROJECT STATUS AND DATE AGENCY IMPLEMENTOR ISSUED 1.CDF-30M-2T-0 1. ROCS-04-04186 / 1.DPWH I- DEO 1. Admin. TURNED-OVER 4 12.14.04 09.23.05
30,000.00
CDF-3T-05
450000.00
DepEdSecretary’s Discretionary Fund CDF-30M-2T-04 A-04-03888 / 12.13.04
Construction of Multi- 1,000,000.00 purpose Bldg. (Covered Court)
Implemented DPWH I-DEO
Contractor
Project Completed
DPWH I- DEO
Contractor
Phase I Completed
1. Admin
Pre-implementation activity Phase I-Completed
CDF-20M-1T-08
Tugaya
Continuation of 1,000,000.00 Covered court Construction of Water 500,000.00 System Construction of 1 Classroom
450,000.00
Construction of Multi- 1,000,000.00 purpose Bldg.
A-08-06303/ 08.27.08 DPWH I- DEO CDF-30M-2T-04 ROCS-04-04186 / 12.14.04
1.DPWH I- DEO
Project Completed
DepEd- Secretary’s Discretionary Fund
DPWH-I-DEO
CDF-20M-1T-08
Pre-implementation activity A-08-06303/ 08.27.08
29
BARANGAY
Dagat Kidavao Maapag
PROJECT
AMOUNT
Electrification of Purok 500000.00 Katipunan Construction of Multi- 500,000.00 purpose Bldg.
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
CDF-1T-15M 07 (Soft) CDF-30M-2T-04 A-04-03888 / 12.13.04
IMPLEMENTING AGENCY
PROJECT IMPLEMENTOR
NEA
FIBECO
DPWH I- DEO
Contractor
STATUS
Waiting for the SARO Phase I Completed *waiting for additional fund for continuation
CDF-3T-05
Colonia
Maapag ES- Const. of 50,000.00 Stage 1.Day Care Facilities 30,000.00 (Alpha DCC, Omega DCC)
Implemented
1. DSWD-CO-04 1. N/A
1.DSWD-Reg.X
1.DSWD-Reg.X
CDF-3T-05
Lilingayon
2. Colonia ES- School 50,000.00 Covered Court Construction of School 450,000.00 Building 1 Classroom
Legal assistance of water dispute
CDF- Sen. Angara-04
TURNED-OVER 11.25.06 Implemented
A-04-04628 / 12.15.04
DPWH I- DEO
MOA w/ LGU
Project Completed -ready for turnover Decision turnedover
30
Nabag-o
1. Construction of Multi-purpose Bldg
500,000.00
(Barangay Office)
2. Nabag-o ES- Const. 30,000.00 of Cemented Pathway & Flower Boxes 3. Construction of Multi-purpose Bldg 500,000.00 (Barangay Office-Phase II)
CDF-20M-3T-05 A-05-06489/ 12.12.05 1.DPWH I- DEO CDF-3T-05
SOURCE OF FUNDING
Sugod
1. Construction of Covered Court
1,500,000.00
1.CDF-10M-2T
Barobo San Isidro
Pinatilan ES- Repair of 30000.00 H.E. Bldg. Purchase of 1 computer set for Barobo ES Completion of Multi- 400000.00 purpose Bldg.
Project completed DPWH-I-DEO
AMOUNT
Pinatilan
DepEd Valencia
CDF-1T-10M-07 A-07-07323/10.18.07
PROJECT
Concepcion
Phase I Completed Implemented
DepEd-Valencia
BARANGAY
2. Sugod E/S Perimeter 40,000.00 fence Electrification Project 1000000.00
Contractor
SARO NUMBER AND DATE ISSUED 1. A-05-03889/ 08.25.05
IMPLEMENTING PROJECT STATUS AGENCY IMPLEMENTOR 1. DPWH I-DEO
CDF-3T-05
DepEd-Valencia
CDF-2T-5M-07 (Soft) CDF-3T-05
NEA
Sen. Villar
1. Contractor
Implemented Fibeco
DepEd-Valencia
DepEd Division of Bukidnon CDF-1T-10M-07 A-07-07323/ 10.18.07 DPWH-I-DEO
Phase I Completed *waiting for additional fund for continuation
Waiting for SARO Implemented
DepEd Division of Bukidnon
Turned-over Project completedready for turn-over 31
BARANGAY
Lourdes
PROJECT
AMOUNT
1Construction of 500,000.00 Multi-purpose Bldg. (Covered Court)Phase I Continuation of the Construction of 500,000.00 Multi-purpose Bldg (Phase II)
SOURCE OF FUNDING
SARO IMPLEMENTIN PROJECT NUMBER AND G AGENCY IMPLEMENTOR DATE ISSUED .CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor 12.13.04
CDF-20M-3T-05 A-05-06489/ 12.12.05
DPWH I- DEO
STATUS
Phase I Completed
Phase II completed
CDF-20M-1T-08 Continuation of the Construction of 1,000,000.00 Multi-purpose Bldg (Phase III)
A-08-06303/08.27 DPWH I- DEO .08
Preimplementation activity
Sinabuagan
32
Vintar
San Carlos
BARANGAY
Lurogan
1. Completion of 250,000.00 Multi-purpose Bldg.
1.CDF- Sen. Villar-04
2. Electrification of 500,000.00 Purok 9 & Purok 10 San Carlos ES30,000.00 Repair of 1 CL Construction of Water 500,000.00 Syem
PROJECT
AMOUNT
1.DPWH I-DEO Contractor
TURNED-OVER
CDF-1T-15M-07 (Soft) CDF-3T-05
NEA DepEd Valencia
Waiting for the SARO Implemented
CDF-1T-10M-07 A-07-07323/ 10.18.07
DPWH-I-DEO
Project Completed
SOURCE OF FUNDING
Lurugan ESRepainting of 3 CL
20,000.00
CDF-3T-05
Kilangi ESEnergization of School
20,000.00
CDF-3T-05
1. A-05-02689/ 07.01.15
SARO IMPLEMENTIN NUMBER AND G AGENCY DATE ISSUED DepEd Valencia
FIBECO
PROJECT IMPLEMENTOR
STATUS
Implemented
Implemented DepEd Valencia
33
CITY OF MALAYBALAY BARANGAY
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
IMPLEMENTING AGENCY
PROJECT IMPLEMENTOR
STATUS
34
LGU
1.Construction of DepEd Training Center
500,000.00
CDF-10M-2T-05 A-05-03889/ 08.25.05
2.Construction of Malaybalay Diversion Road
1.5M
CDF-10M-1T-05 A-05-01415/ 03.09.05
DPWH-I-DEO
Contractor
Project Completed as per amount programmed
DPWH-I-DEO
By Admin
Project Completed as per amount programmed
DPWH-I-DEO
By Admin
Project Completed as per programmed
LGU
Association of Turned-over Barangay Captains (ABC)of Malaybalay Turned-over
LGU
LGU
CDF-10M-2T-05 3.Construction of 300,000 Multi-purpose Bldg (Girl Scouts of the Phil.) 4.Turn-over of Guns N/A 5.Financial assistance to LGU for 300,000.00 installation of fire extinguishers to all barangays 6.Financial assistance for DPWH-1st 1,400,000.00 District Engineering (1M goes to the Office vehicle, the remaining 400k goes to the Crisis
PNP-CO
A-05-03889/ 08.25.05
CDF-05
CDF-05
Turned-over
Intervention Program & Livelihood
35
BARANGAY
LGU
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
IMPLEMENTING AGENCY
7.Hinabol Handicraft 50,000.00 Production by FEDWOMB Malaybalay chapter 8. Financial assistance to LGU 9. Financial assistance to LGU
500,000.00
PROJECT IMPLEMENTOR LMI
CDF-1T-15M-07
STATUS
Implemented
LGU
Waiting for the SARO
LGU
Implemented
DPWH
Completed as per amount programmed but DepEd request for additional funding
CDF-2T-5M-07 750,000.00
10. Const. of SPED bldg. 4,000,000.00
-through the initiative of Cong. Guingona
CDF-1T-15M-07 11. Support to Lindungawan 300,000.00 Marketing Outlet for OTOP Buk products and potential products from SMEs: Indigenous Peoples Apostolate (IPA)
Check turned-over DTI-Buk
36
BARANGAY
LGU
PROJECT
12. Construction of Training Center of DepEd Division, Bukidnon
AMOUNT
1,000,000.00
SOURCE OF FUNDING
SARO IMPLEMENTING NUMBER AND AGENCY DATE ISSUED CDF-20M-1T-08 A-08-06303/ DPWH I-DEO 08.27.08
PROJECT IMPLEMENTOR
STATUS
Pre-implementation activity
CDF-20M-1T-08 13. Construction of Alumni Center & Museum of BSU
Managok
3,500,000.00
A-08-06303/ 08.27.08
DPWH I-DEO
Pre-implementation activity
CDF-1T-20M-08
14.Financial 4,200,000.00 assistance to LGU for implementation of various programs & projects Construction of 450,000.00 Public Market
ROCS-08-06200/ LGU 08.21.08
CDF-30M-2T-04 ROCS-04-04186 / DPWH I-DEO 12.14.04
NCA received
Contractor
TURNED-OVER 04.07.06
LGU-Malaybalay
LGU-DSWD
Implemented
LGU-Malaybalay
Barangay Government Implemented
CDF-20M-3T-05 Social Microcredit and Savings Mobilization (Womens)
100,000.00
Sen. Villar-06
Spring Dev’t for Sitio 50,000.00 Binatunan
37
Linabo
BARANGAY
Violeta
1. Rehabilitation of 200,000.00 Paiwaig Communal Irrigation System 2. Construction of 2,000,000 Water System 3. Const. of Spillway 2,500,000
PROJECT
AMOUNT
1. Construction of 1. 150,000.00 Multi-Purpose Bldg for Purok 2
NIA-5M-06
NIA
Implemented
CDF-1T-10M-07 A-07-07323/ DA-5M-08 10.18.07 A-08-02485/03.12 DPWH I-DEO .08 SOURCE OF FUNDING
SARO IMPLEMENTING NUMBER AND AGENCY DATE ISSUED 1.CDF-10M-1T-0 1.A-05-01415/ 1. DPWH I- DEO 5 03.09.05
Implemented Signing of MOA
PROJECT IMPLEMENTOR By Admin
STATUS
TURNED-OVER 04.07.06 -with certificate of acceptance
2.Construction of 2. 150,000.00 Multi-Purpose Bldg for Purok 3
2.CDF-10M-1T-0 2.A-05-01415/ 5 03.09.05
3.Construction of 3. 150,000.00 Multi-Purpose Bldg for Purok 4
3.CDF-10M-1T-0 3.A-05-01415/ 5 03.09.05
4.Construction of 4. 150,000.00 Multi-Purpose Bldg for Purok 5
4.CDF-10M-1T-0 4.A-05-01415/ 5 03.09.05
2. 1. DPWH I- DEO
By Admin
TURNED-OVER 04.07.06 -with certificate of acceptance
3. 1. DPWH I- DEO
By Admin
TURNED-OVER 04.07.06 -with certificate of acceptance
4. 1. DPWH I- DEO
By Admin
TURNED-OVER 04.07.06 -with certificate of acceptance
38
Dalwangan
BARANGAY
Rehabilitation of 500,000.00 New Ilocos Communal Irrigation System
NIA-5M-07
NIA
Construction of Water System
2,000,000.00
CDF-1T-10M-08 A-07-07323/ 10.18.07
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO IMPLEMENTING NUMBER AND AGENCY DATE ISSUED
Implemented
Implemented
PROJECT IMPLEMENTOR
STATUS
39
Apo Macote
Construction of Farm 1,000,000.00 to Market Road Apo Macote-Malayanan Construction of Farm to Market Road Apo 1,000,000.00 Macote-Malayanan
Social Microcredit and Savings Mobilization (Womens)
100,000.00
Construction of Water System
DAR Funded project
E-05-07630/ 12.29.05
DPWH I- DEO
Lease contract with the LGU of San Fernando
Phase I Completed
DA Funded project
DPWH I- DEO
Lease contract with the LGU of San Fernando
Project On-going
CDF-20M-3T-05
DPWH I- DEO
LGU-Malaybalay
Implemented
CDF-20M-1T-08 850,000.00
A-08-06303/ 08.27.08
DPWH I- DEO
Pre-implementation activity
40
BARANGAY
PROJECT
AMOUNT
SOURCE OF FUNDING
Bangcud
Construction of Bridge at Purok 7
1,000,000.00
CDF-10M-2T
Social credit and microentrepreneurship (Bangcud, Aglayan,
300,000.00
Sen. Cayetano
SARO IMPLEMENTING NUMBER AND AGENCY DATE ISSUED A-05-03889/ DPWH I- DEO 08.25.05 DSWD REG X
PROJECT IMPLEMENTOR
STATUS
Contractor
Phase I Completed
LMI
Implemented
Laguitas, Magsaysay)
Construction of 1,900,000.00 Bridge at Purok 7 – Phase II
CDF-20M-1T-08 A-08-06303/ 08.27.08
DPWH-I-DEO
Pre-implementation activity
41
San Martin
1. Construction of 1 unit Classroom at San Martin Elem. Sch.
2. Building Capabilities of % Women Organizations to Implement and Sustain SEA-K (Sinanglanan, San Martin, Imbatug, Cabulohan, Lambagan)
450,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO 120,000.00 12.14.04 (125 microentrepreneurs 279,000.00 Plus 50,000
3. Additional funds for microlending (Sinanglanan, San Martin, Imbatug,
Contractor
Project Completed as per program * waiting for additional fund
DSWD- REG X
LMI
Completed
DSWD-REG X
LMI
On-going
PROJECT IMPLEMENTOR
STATUS
Cabulohan Lambagan)
BARANGAY
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO IMPLEMENTING NUMBER AND AGENCY DATE ISSUED
Indalasa
42
Simaya
Construction of 500,000.00 Multi-Purpose Bldg. (Barangay Office)
CDF-30M-2T-04 A-04-03888 / 12.13.04
Rehabilitation of Sawaga-Simaya CIS 1,000,000.00 (LASSCIA)
NIA-5M-06 (thru the initiative of Cong. Guingona)
Implemented
CDF-05
Implemented
Livelihood project for LASSCIA Miglamin Busdi
Construction of Spillway (Busdi River)
1,000,000.00
1,000,000.00
CDF-30M-2T-04 A-04-03888 / 12.13.04 CDF-20M-3T-05
DPWH I- DEO
Contractor
DA Region X
DA-LGU of Malaybalay
DPWH I- DEO
Contractor
Project Completed as per amount program *waiting for additional fund for continuation
TURNED-OVER
Check issued
Financial assistance 150,000 to LGU for the Tribal Council ofSitio Bendum, Busdi, Malaybalay,City
43
BARANGAY
Sto. Nino Maligaya Kibalabag Imbayao Mapayag Capitan Angel Caburacanan Casisang
Barangay 9
Barangay 1
PROJECT
AMOUNT
SOURCE OF FUNDING
Construction of Water System
1000000.00
CDF-20M-3T-
Electrification
1890289.00
NEA-04 / LGU
SARO IMPLEMENTING NUMBER AND AGENCY DATE ISSUED A-05-06489/12.12 DPWH I- DEO .05 N/A
BUSECO
Construction of 300000.00 Multi-purpose Bldg.
CDF-1T-10M-07 A-07-07323/ 10.18.07
DPWH I- DEO
Books for 5 DCC (P2,5,8,9,10)
1. DSWD-C0-04 1. N/A
1.DSWD
50,000.00
Purchase of computers *** Financial assistance 10000.00 for Terminal Vendors Assoc. Construction of 500000.00 Multi-purpsose Bldg.
PROJECT IMPLEMENTOR
STATUS
By Admin
Project Completed
1. BUSECO
COMPLETED Project Completed
1.DSWD
2.CICT
TURNED-OVER/ 01.23.06 2. Turned-over Check issued
CDF-1T-10M-07 A-07-07323/ 10.18.07
DPWH I- DEO
By admin
Project completed
Silae
44
BARANGAY
Barangay 11
Barangay 3 Barangay 7
Can-ayan Barangay 2
Barangay 4
PROJECT
AMOUNT
SOURCE OF FUNDING
SARO NUMBER AND DATE ISSUED
Land problem of Brgy 10 & Brgy 11 (BATMIRNA & MIRNABE)
PROJECT IMPLEMENTOR
STATUS
Legislative Office of Manila in coordination with Mayor Flores
Their case has already been settled at the DENR Central Office for action
DPWH I- DEO
Phase I Completed
DPWH I- DEO
10000.00
Pre-implementation activity Implemented
50000.00
Implemented
Construction of 500,000.00 Multi-purpose Bldg Continuation of Multi-purpose Bldg Repair of Water System at Sitio Kiito Purchase of Gas Range & Oven, meat grinder & 50 pcs monobloc Completion of Elevated Sidewalk
IMPLEMENTING AGENCY
1,000,000.00
150000.00
CDF-20M-3T-05 A-05-06489/ 12.12.05 CDF-20M-1T-08 A-08-06303/ 08.27.28
CDFSen.Villar-04
A-05-02689/ 07.01.05
DPWH I- DEO
Contractor
Project Completed
45
BARANGAY
Sinanglanan
Kulaman Sumpong Barangay 5 Zamboanguita
PROJECT
AMOUNT
1.Installation of 500,000.00 Water System for P7 and P8
SOURCE OF FUNDING
SARO IMPLEMENTING NUMBER AND AGENCY DATE ISSUED CDF-30M-2T-04 ROCS-04-04186 / DPWH I-DEO 12.14.04
PROJECT IMPLEMENTOR Admin
STATUS
TURNED-OVER 01/13/06
2. .Building Capabilities of % Women Organizations to Implement and Sustain SEA-K (Sinanglanan, San Martin, Imbatug, Cabulohan, Lambagan) 3.Additional funds for microlending (Sinanglanan, San Martin, Imbatug,Cabulohan Lambagan) Construction of Spillway
120,000.00 (125 microentrepreneurs)
DTI-Bukidnon
Completed
279,000.00 Plus 50,000
DSWD REG X
Implemented
Construction of Public Market
-additional 100,000
CDF-1T-07
DTI-Buk
Pre-construction activity
1000000.00
CDF-1T-10M-07 A-07-07323/ 10.18.07
DPWH I- DEO
For implementation
500000.00
CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO 12.14.04
Contractor
Phase I Completed *waiting for additional fund for continuation 46
BARANGAY
PROJECT
Barangay 10
Land problem of Brgy 10 & Brgy 11 (BATMIRNA & MIRNABE)
Aglayan
Purchase of 2 computer units for Aglayan ES
AMOUNT
SARO NUMBER AND DATE ISSUED
IMPLEMENTING AGENCY
PROJECT IMPLEMENTOR
Legislative Office of Manila in coordination with Mayor Flores
50,000.00
Financial assistance 500,000.00 to Malaybalay Livestock Market Assoc.
San Jose
SOURCE OF FUNDING
Financial assistance for Lantapan Habal- 40,000.00 habal Waiting shed Construction of 1000000.00 Water System
STATUS
CDF-20M-3T-05
Their case has already been settled at the DENR Central Office for action Turned-over
Sen. Magasaysay-07
Turned-over
Sen. VillarBarangay Aglayan CDF-20M-3T-05 A-05-06489/ 12.12.05
DPWH I- DEO
Ready for turnover Project Completed
Barangay 8 Barangay 6
47
BARANGAY
Manalog Mapulo Laguitas Patpat Magsaysay
St. Peter Cabangahan Kalasungay
PROJECT
AMOUNT
Electrification
2575902.00
Construction of Water System
1000000.00
SOURCE OF FUNDING
CDF-20M-3T-
SARO IMPLEMENTING NUMBER AND AGENCY DATE ISSUED N/A BUSECO A-05-06489/12.12 DPWH I- DEO .05
Social Microcredit 300,000 and Savings Mobilization (Womens) 80 women (Bangcud, Aglayan, microentrepreneurs Laguitas, Magsaysay)
Financial assistance 250,000.00 to LGU for the projects of Barangay Kalasungay Tribal
DSWD REG X
CDF-20M-3T-05
LGU
PROJECT IMPLEMENTOR
STATUS
BUSECO
COMPLETED
By Admin
Project Completed
LMI
Implemented
Check issued to the recipients
48
SOFT PROJECTS PROJECT
SCHOLARSHIP
BARANGAY
AMOUNT
SOURCE OF FUNDING
1.450,000.00
1.CDF-5M-2T-04
3. 12,000.00
3.CDF-30M-2T04
4. 550,000.00
4.CDF-10M-1T-05 5.CDF-10M-1T-05
5. 300,000.00 6.CDF-10M-1T-05 6. 300,000.00
7. CDF-20M-3T-05 CDF-20M-3T-05
7. 740,000.00 CDF-20M-3T-05
SARO NUMBER NCA NUMBER IMPLEMENTIN PROJECT STATUS AND DATE AND DATE G AGENCY IMPLEMENTOR ISSUED ISSUED 1. ROX-04237/ 1. 232159-4 Bukidnon State Bukidnon State Implemented 11.09.04 College College 3.ROCS-05-00263/ 3.232535-2/03.29. CHED-REGION II CHED-REGION II 02.04.05 05
Bukidnon State 4.ROCS-05-01386/ 258738-4/09.24.0 College 03.07.05 5 CMU 5. ROCS-05-01387/ 5. 258559-0 03.07.05 08.15.05 TESDA6. ROCS-05-01388/ 6. BUKIDNON 03.07.05 258740-6/09.24.0 5 Bukidnon State 7. College ROCS-05-06857/12 7. 321959-1/ .14.05 02.14.06 CMU
Bukidnon State College
Implemented
CMU
Implemented
TESDA-BUKIDNON Implemented Bukidnon State College CMU
8. 260,000.00
9. 260,900
8.321958-0/ ROCS-05-06857/12 02.14.06 .14.05 321957-6/ ROCS-05-06857/12 02.14.06 .14.05
TESDABUKIDNON
Implemented
TESDA-BUKIDNON
Implemented
Implemented
Implemented
49
PROJECT
SCHOLARSHIP
BARANGAY
AMOUNT
SOURCE OF FUNDING
217,500.00
CDF-1T-07
400,000.00
CDF-1T-07
1,182,500.00
CDF-1T-07
800,000.00
CDF-1T-20M-08
SARO NUMBER NCA NUMBER IMPLEMENTIN PROJECT STATUS AND DATE AND DATE G AGENCY IMPLEMENTOR ISSUED ISSUED ROCS-07-08752/ TESDATESDA-BUKIDNON Waiting for the NCA 11.09.07 BUKIDNON CMU ROCS CMU Waiting for the NCA BSU BSU Waiting for the NCA ROCS-08-06201 08.21.08
BSU
Waiting for the NCA
50
CIDSS
1. 200,000.00
1.CDF-5M-2T-04
2. 1,874,000.00
2.CDF-30M-2T-04 2. B-04-04370/ 2. 232146-5 12.15.04 3. CDF-10M-1T-05 3.ROCS-05-01385/ 3. a. 321779-3 03.07.05 (2M) 02.14.06 b.259282-2 4. CDF-10M-2T-05 (2.5M) 10.19.05
3. 4,500,000.00
4. 1,800,000.00
1. B-04-03513/ 12.10.04
1. 232146-5
1. DSWDREGION –X
1. DSWD- REGION 1.IMPLEMENTED –X
2. DSWDREGION –X
2. DSWD- REGION 2. IMPLEMENTED –X
3. DSWDREGION –X
3. DSWD- REGION 3. IMPLEMENTED –X
4. ROCS-05-03371/ 4. a. 259116-4 4. a. DSWD08.01.05 (1M) 02.014.06 CENTRAL * from the 1M, OFFICE 600,000 has been realigned to DSWD Region X for the payment of BSC scholarship, so the remaining amount left is 400,000 (800,000) 10.19.05 b.259281-1
4. a.DSWD4.a. IMPLEMENTED CENTRAL OFFICE
b. DSWDb. DSWD-
PROJECT
BARANGAY
AMOUNT
SOURCE OF FUNDING
SARO NUMBER NCA NUMBER IMPLEMENTIN AND DATE AND DATE G AGENCY ISSUED ISSUED
b. IMPLEMENTED
PROJECT IMPLEMENTOR
STATUS
51
CIDSS
LIVELIHOOD
Establishment & protection of forest and watersheds (Pantaron Range)
b.259281-1 ROCS-07-08749/ 11.09.07
b. DSWDDSWD-REG X DSWD-Central Office (500k)
b. DSWDDSWD-REG X DSWD-Central Office
b. IMPLEMENTED For Implementation
DSWD-REG X DSWD-Central Office
For Implementation
5,382,500.00
CDF-1T-07
2,250,00.00
CDF-2T-07
ROCS-07-08758/ 11.09.07
DSWD-REG X DSWD-Central Office (250k)
1,500,000.00
CDF-1T-20M-08
ROCS-08-06201/ 08.21.08
DSWD-REG X
Waiting for NCA
5,792,500.00
CDF-1T/2T-07
DTI-Bukidnon
Implemented
3,500,000.00
CDF-1T-20M-08
DTI-Bukidnon
NCA received
1,000,000.00
CDF-1T-07
DENR REG X
On-going
1,000,000.00
CDF-1T-20M-08
ROCS-08-06199/ 369261-4 08.21.08 10.30.08 ROCS-07-8754/ 11.09.07
ROCS-08-06203/ 369265-1 08.21.08 10.30.08
NCA received
Prepared by: Jing Agripo
* note -Projects funded by other agencies were all the initiative of Cong. Guingona
52