The Boiler Fabrication Company had 2 working areas that was office building and workshop. On 2012 and 2015, workshop area had a fire. This was caused electric short circuit and negligence of work so a company had material loss and six people wounded. Based on these conditions, then the need of evaluasion and ERP application design with active fire protection system On office building and workshop. The metode in these research used ERP calculations based of SFPE 5th edition 2016 and NFPA 101 Life Safety Code on 2018. The design of detector and alarm evaluated basedes NFPA 72 on 2016. The design of APAR evaluated basedes NFPA 10 on 2018. The design of hidran evaluated basedes NFPA 14 on 2016. Besides that research had been designing ERP applications and an android-based active fire protection system also for prevention and anticipation in case of an emergency so the worker could be evacuation safely. Based on evaluation result in company working area had been finding some incompatibility between existing condition with related standard and workshop area had the highest potential danger was moderate danger according to NFPA 10 on 2018. Then made an android based calculation application that includes ERP and active fire protection system. The workers could use this application on smartphone, so made it easier to do the calculation and redesign with the result of the evacuation route, layout of active fire protection system and calculations for the number of alarm, detectors, APAR in the company. From the results calculations got that the workshop need 4 unit exit and 2 exit. The total evacuation time from the workshop was for 2,72 minutes. For the need of active fire protection system at workshop also not there, so that needed 120 detector, 3 alarm, and 3 APAR. While for the hydrant installation on the company required 3 hydrant pillar with a debit of 500 gpm and the need for minimum water volume that must be provided for 73,5 m3.

Related Documents


More Documents from "Mamta"