SUPPLY CHAIN MANAGEMENT OF GMI ZARHAK MOULDERS BY GROUP 4
INTRODUCTION STARTED
IN
1996. ISO 9000 AND 2001 CERTIFIED COMPANY. MANAGEMENT PRINCIPLES OF JUST IN TIME, TOTAL PRODUCTION MANAGEMENT AND KAIZEN.
PRODUCTS Water
tanks Barrels Dustbins Diesel fuel tanks VOLVO PT240 Pallets Engine crates
SUPPLY CHAIN CUSTOMER ORDER
QUALITY CHECK
DESIGN
TRANSPORT
RAW MATERIALS
PRODUCE/ MANUFACTURE
DISTRIBUTE
CUSTOMER
CUSTOMER ORDER PRODUCT
AVAILABLE THAN MAKE PROFILE OF THE CUSTOMER. CUSTOMER’S NAME, CONTACT NO., EMAIL ID, ADDRESS, DELIEVERY DATE. ORDERING DONE THROUGH SES(SOFTWARE).
DESIGN AND DEVELOPMENT RESPONSIBLE
FOR MAKING NEW PRODUCTS FOR CUSTOMER. TAKES HELP FROM SALES AND PRODUCTION DEPARTMENT. DESIGN REGISTER BOOK IS MAINTAINED WHICH CONTAINS PROJECT NO., CUSTOMER NAME, PROJECT NAME, PART NAME, REVISION AND A PROJECT FILE NUMBER.
RAW MATERIALS PURCHASE LOOKS
AFTER PURCHASING OF RAWMATERIALS, GAS, DIESEL, PLANT AND MACHINERY EQUIPMENT. IF IT REACHES THE REORDER LEVEL THE PURCHASE DEPARTMENT RECEIVES A MESSAGE AND THE REQUIRED HAS TO BE ORDERED. THE MAIN RAW MATERIAL IS THE PLASTIC POWDER LINEAR LOW DENSITY POLY ETHYLENE LLDPE.
SUPPLIERS RELAINCE IND FLAMINGO JUTEX AUDULT KARE SIGURAD
LTD
ENTERPRISES KADOSH GAS JOSHI PP MOHIDIN MAYUK CHIMICALS UNITED INDUSTRY SUPPER TRADDING
PRODUCTION/MANUFACTURI NG Mould is going for cooling
Heating M/C
Cooling zone
2
Loading & unloadin g
3
1
4
QUALITY CHECK THREE TESTS 2. DROPPED FROM CERTAIN HEIGHT. 3. WATER PRESSURE. 4. LEAD TEST-BY PUTTING LOAD. AFTER PASSING TANK IS APPROVED.
TRANSPORT THREE
PERSONAL VEHICLES. TIMING 8:30AM TO 5:30 PM. THEY ALSO HAVE DEALERS ALL AROUND GOA.
REACHES THE CUSTOMER
THANK U BY GROUP 4