Requirements Engineering Training Program
Statistical Games Large Lots (Waterfall) x Small Lots (JIT)
Prof. Luiz Cláudio Parzianello [
[email protected]]
RESULTS
Group ID
1st Experim ent
Time to deliver the first requirement:
s
Large Lots
Time to deliver the whole project:
s
2nd Experim ent
Time to deliver the first requirement:
s
Small Lots
Time to deliver the whole project:
s
ANALYSIS
Working with SMALL LOTS is LARGE LOTS!
,
times faster than working with
With SMALL LOTS, the first requirement is delivered by LARGE LOTS time! Copyright 2009 Surya Digital Management
%
of the