pdf, 55 pages, 733 kb download : www.artikel-software.com/blog purpose scope responsibilities, strength, and air content cement aggregates admixtures pozzolans miscellaneous materials water sampling and testing of materials delivery and storage of materials grade control subgrade, base, forms, and string lines batching and mixing placing. field test specimens finishing curing grade and surface -smoothness requirements tolerances in pavement thickness repairs of defective pavement slabs joints pavement protection measurements appendix a: references appendix b: thin bonded rigid overlays for rigid pavements appendix c: steel-fiber- reinforced concrete appendix d: roller-compacted concrete pavements; design and construction