South Grand Great Streets Open House Presentation

  • Uploaded by: nextSTL.com
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View South Grand Great Streets Open House Presentation as PDF for free.

More details

  • Words: 1,111
  • Pages: 40
South Grand: From Good to Great

St. Louis Great Streets Initiative

South Grand Open House: Design Concepts to Move Your Street from Good to Good to Great Monday, March 31st, 2008

presented by

CH2M HILL

South Grand: From Good to Great

Presentation Agenda

St. Louis Great Streets Initiative

• The Regional Initiative • South Grand – What We Have Learned – Discussion of Design Concepts – Balancing the Tradeoffs

• How You Can Provide Input

St. Louis Great Streets Initiative

South Grand: From Good to Great

The Regional Initiative

St. Louis Great Streets Initiative

South Grand: From Good to Great

What Are Great Streets?

What Are Great Streets?

St. Louis Great Streets Initiative

South Grand: From Good to Great



They reflect the character of their communities



They allow people to walk safely and comfortably



They contribute to local economic vitality



They are multimodal and accessible for all users



They enhance the sense of place along the street



They are “green” and environmentally sustainable

South Grand: From Good to Great

East-West Gateway’s Vision

St. Louis Great Streets Initiative

• Our streets can be greater community assets if we think anew about how we plan and design them • They are more than just storm sewers for automobiles

Four-Part Initiative

St. Louis Great Streets Initiative

South Grand: From Good to Great

• • • •

National Symposium Great Streets Web Guide Web Guide Workshop Demonstration Projects – South Grand, out of nearly 40 applicants, was selected as 1 of 4 demonstration projects currently being conducted in the region

St. Louis Great Streets Initiative

South Grand: From Good to Great

South Grand: What We Have Learned

St. Louis Great Streets Initiative

South Grand: From Good to Great

South Grand Is Already a Good Street

South Grand: From Good to Great

What is Preventing South Grand Grand from Becoming Great?

St. Louis Great Streets Initiative

• Through study, observation, and collaboration with local leaders, we we have learned a lot

St. Louis Great Streets Initiative

South Grand: From Good to Great

High speed of traffic on Grand creates a variety of challenges

St. Louis Great Streets Initiative

South Grand: From Good to Great

Wide pedestrian crossing distances distances without pedestrian intervals at signals

St. Louis Great Streets Initiative

South Grand: From Good to Great

Pedestrian Lighting is Lacking

South Grand: From Good to Great

Parking Supply Issues

St. Louis Great Streets Initiative

• Not enough? Perhaps • Off-street safety and supply are two key key elements of this problem

St. Louis Great Streets Initiative

South Grand: From Good to Great

Aging Infrastructure

South Grand: From Good to Great

Three Key Elements Rose to the the Top of the List

St. Louis Great Streets Initiative

• Pedestrian Environment • Parking Supply and Function • Infrastructure Upkeep/Upgrade – sidewalks, trees, lighting, furnishings, etc. Design concepts will be developed and evaluated based on these three “key elements”

St. Louis Great Streets Initiative

South Grand: From Good to Great

South Grand: Discussion of Design Concepts

South Grand: From Good to Great

3 Concepts Presented Tonight

St. Louis Great Streets Initiative

• “4-Lane Basic Enhancement” • “4-Lane Enhancement Plus” • “3-Lane Basic Enhancement”

Many Elements Common to All Three Concepts

St. Louis Great Streets Initiative

South Grand: From Good to Great

• • • • • • •

Lighting Improvements Landmark at Center of District Signal re-timing for lower speed Pedestrian intervals at signals Site furnishing packages Tree pruning and infill General infrastructure repair and replacement

St. Louis Great Streets Initiative

South Grand: From Good to Great

4-Lane Basic Enhancement

St. Louis Great Streets Initiative

South Grand: From Good to Great

Key Features • Pedestrian – curb bulb-outs at intersections; crosswalks at every block; signal timing adjusted to encourage lower travel speeds and to provide pedestrian intervals • Parking – existing parking configuration on Grand is maintained • Infrastructure – reconstruction of sidewalks and tree wells; textured pavement and pavers at key locations; pedestrian scale white lighting; enhanced landscaping

St. Louis Great Streets Initiative

South Grand: From Good to Great

4-Lane Basic Enhancement

St. Louis Great Streets Initiative

South Grand: From Good to Great

4-Lane Basic Enhancement

St. Louis Great Streets Initiative

South Grand: From Good to Great

4-Lane Basic Enhancement

St. Louis Great Streets Initiative

South Grand: From Good to Great

4-Lane Enhancement Plus

St. Louis Great Streets Initiative

South Grand: From Good to Great

Key Features • Pedestrian – curb bulb-outs at intersections; trees moved off of sidewalk; signal timing adjusted to encourage lower travel speeds and to provide pedestrian intervals • Parking – parking reduced by moving trees from sidewalk to parking lane between stalls (~50% reduction of curbside supply on Grand) • Infrastructure – reconstruction of sidewalks; trees moved to curb lane between parking stalls; textured pavement and pavers at key locations; pedestrian scale white lighting; enhanced landscaping Red font = elements unique to this concept

St. Louis Great Streets Initiative

South Grand: From Good to Great

4-Lane Enhancement Plus

St. Louis Great Streets Initiative

South Grand: From Good to Great

4-Lane Enhancement Plus

St. Louis Great Streets Initiative

South Grand: From Good to Great

4-Lane Enhancement Plus

St. Louis Great Streets Initiative

South Grand: From Good to Great

3-Lane Basic Enhancement

St. Louis Great Streets Initiative

South Grand: From Good to Great

3-Lane is the Same as the 4-Lane Basic Enhancement • Only difference is that it would be restriped for 3 lanes plus bicycle lanes on each side • Could easily go back to 4 lanes if it was attempted and not liked

St. Louis Great Streets Initiative

South Grand: From Good to Great

3-Lane Basic Enhancement

St. Louis Great Streets Initiative

South Grand: From Good to Great

3-Lane Basic Enhancement

St. Louis Great Streets Initiative

South Grand: From Good to Great

3-Lane Basic Enhancement

St. Louis Great Streets Initiative

South Grand: From Good to Great

South Grand: Balancing the Tradeoffs

St. Louis Great Streets Initiative

South Grand: From Good to Great

Picking a Concept Will Mean Compromise • Every concept has tradeoffs • We must recognize that we cannot cannot achieve all things • We must decide what we value most most and choose accordingly

Comparison Matrix

St. Louis Great Streets Initiative

South Grand: From Good to Great

St. Louis Great Streets Initiative

South Grand: From Good to Great

How You Can Provide Input

South Grand: From Good to Great

Please Fill Out the Survey!

St. Louis Great Streets Initiative

• Comment tables at the back • Please talk to one of the staff if you have any questions • Your input is very important

St. Louis Great Streets Initiative

South Grand: From Good to Great

Questions?

Related Documents