PRESUPUEST N° O CLIENTE LIMA SURCO LUGAR AREA

PRESUPUESTO REPARCION DE SERVICIOS HIGIENICOS

ITEM 02 02.01

FECHA

DESCRIPCIÓN

UND

3/2/2019

METRADO PRECIO PARCIAL

RED DE ALCANTARILLADO OBRAS PROVICIONALES

4,800.00

02.01.01

TRANSPORTE DE MATERIALES Y EQUIPOS

GLB

1.00

02.01.02

CARTEL DE OBRA 3.60 X 2.40M (EST)

GLB

1.00

1,500.00 1,500.00

02.01.03

CASETA PARA OFICINA Y GUARDIANIA

GLB

1.00

2,500.00 2,500.00

02.02

800.00

800.00

OBRAS PRELIMINARES

02.02.01

TRAZO Y REPLANTEO PARA LINEAS DE ALCANTARILLADO

02.02.02

TRANQUERA T/BARANDA 1.20 X 1.1M PROV P/SEÑALIZACION-PROTECCION

02.02.03

CINTA PLASTICA SEÑALIZACION P/LIMITE SEGURIDAD DE OBRA

02.02.04

PUENTE DE MADERA PROVICIONAL, PASE PEATONAL SOBRE LA ZANJA

02.02.05

CONO DE FIBRA DE VIDRIO FOSFORECENTE

UND

10.00

45.00

02.03

1,994.63 UND

10.00

M

86.00

UND

5.00

28.40

284.00

1.28

110.08

230.11 1,150.55 450.00

MOVIMIENTO DE TIERRAS

02.03.01

EXCV. DE ZANJA RED DE ALCANTARILLADO

02.03.00.01

EXCAVACION DE ZANJA C/MAQUINA T. SUELTO HASTA 3.00m DE PROF/PROM

ML

86.00

88.61 7,620.46

02.03.00.02

EXCAVACION DE ZANJA MANUAL EN T. SUELTO HASTA 2.00m DE PROF/PROM CONEXIÓN DOMICILIARIA

ML

60.00

60.20 3,612.00

02.03.00.03

CORTE DE PAÑO DE ASFALATO EN VEREDA Y ASFALATO EN VIA PUBLICA

ML

20.00

25.45

509.00

02.03.00.04

ROTURA DE PAÑO DE ASFALATO PERFILADO PICADO

ML

20.00

25.45

509.00

02.03.00.05

REFINE, NIVELACION Y COMPACTACION DE FONDO DE ZANJA TN P/TUB ALCANTARILLADO TUB., DN 200 MM.

ML

86.00

2.80

240.80

02.03.02

EXCV. DE ZANJA CONEXIÓN DOMICILIARIA

02.03.02.01

EXCAVACION DE ZANJA DE CONEXIÓN DOMICILIARIA 10

UND

10.00

180.00 1,800.00

02.03.02.02

CONFORMACION DE CAMA DE APOYO, CON MATERIAL DE PRESTAMO, H=10CM

ML

86.00

78.00 6,708.00

02.03.02.03

PREPARACION DE CAMA DE APOYO

ML

86.00

02.04

NIVELACION Y REFINE

02.04.01

NIVELACION Y REFINE FONDO DE ZANJA

02.05

CONFORMACION DE CAMA DE APOYO

02.05.01

CONFORMACION DE CAMA DE APOYO, CON MATERIAL DE PRESTAMO H=10

02.06

RELLENO DE ZANJA

02.06.01

RELLENO DE ZANJA C/MAT. PRESTAMO SOBRE LA CLAVE DE TUBERIA HASTA H=0.30M

ML

86.00

25.00 2,150.00

02.06.02

RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ. HASTA 2.50M DE PROF

M3

215.00

36.45 7,836.75

02.06.03

RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ. HASTA 1.50M DE PROF/PROM. CONEXIÓN DOMICILIARIA

M3

95.60

29.66 2,835.50

02.07

ELIMINACION DE MATERIAL EXCEDENTE

02.07.01

ELIMINACION DE MATERIAL EXCEDENTE, DIST. MPROM 5KM CARGUIO C/MAQ.

GLB

1.00

2,600.00 2,600.00

02.08

12,491.26

8,977.56

5.46

469.56 433.44

M2

154.80

2.80

433.44 3,227.89

M3

15.48

208.52 3,227.89 12,822.25

2,600.00

TUBERIAS

02.08.01

SUMIN. E INST. DE TUBERIA PVC DESAGUE 200MM CLASE 25

02.08.02

SUMIN. EINSTALACION DE TUBERIA ISO PVC 160 MM PARA DOMICILIARIAS

02.08.03

SUMIN. E INSTALACION DE CACHIMBAS 200X 160MM

02.08.04

ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO4435 DN 200 mm.

02.09

8,133.20 ML

86.00

56.00 4,816.00

ML

60.00

45.00 2,700.00

UND

10.00

55.00

550.00

ML

140.00

0.48

67.20

CAMARAS DE INSPECCION

02.09.01

CONSTRUCCION DE BUZONES 3 UND + MARCO DE BUZON CERTIFICADO

02.10

MARCO Y TAPA

02.10.01

SUMINISTRO DE MARCO DE F°F° Y TAPA DE C°A PARA CAMARA DE INSPECCION

02.11

PRUEBA HIDRAULICA

10,800.00 UND

3.00

3,600.00 10,800.00 1,185.00

UND

3.00

395.00 1,185.00

02.11.01

PRUEBA HIDRAULICA TUBERIA PVC 200mm

GLB

2.00

600.00 1,200.00

02.11.02

PRUEBA HIDRAULICA PARA BUZON TIPO 1

GLB

2.00

600.00 1,200.00

02.12

CONEXIONES DOMICILIARIAS

02.12.01

CONEXIONES DOMICILIARIAS TUBERIAS L=2.00M.

02.13 02.13.01

SUB TOTAL

2,400.00

3,450.00 UND

10.00

345.00 3,450.00

OTROS TRAMITES PARA PERMISOS MUNICIPAL Y DISTRITAL (LIMA-SURCO)

3,700.00 GLB

1.00

3,500.00 3,500.00

02.13.02

DADOS DE ANCLAJE PARA EMPALME A BUZONES NUEVOS DE SERVICIO F'C=140 KG/CM2

COSTO DIRECTO Gastos Generales 8% Utilidad 7% Sub- Total I.G.V. 18% TOTAL PRESUPUESTO

GLB

1.00

200.00

200.00

77,015.23

MUNICIPALIDAD PROVINCIAL DEL SANTA Gerencia de Obras Publicas Sub Gerencia de Proyectos y Estudios Técnicos

ADICIONAL N° 01: MEJORAMIENTO Y CONSTRUCCIÓN DE PISTAS EN EL P.J. DOS DE MAYO, DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA - ANCASH, I- ETAPA"

PAVIMENTO FLEXIBLE - VEREDAS - RED DE ALCANTARILLADO

OBRAS COMPLEMENTARIAS ITEM 01 01.01 01.01.01 01.02 01.02.01 01.03

DESCRIPCIÓN

CANTIDAD LARGO ANCHO

ALTO

PARCIAL TOTAL

UND

RED DE ALCANTARILLADO OBRAS PROVISIONALES TRANSPORTE DE MATERIALES Y EQUIPOS

1.00

1.00

1.00

GLB

121.50

121.50

m

60.14

60.14

133.65

133.65

m2

14.69

m3

OBRAS PRELIMINARES TRAZO, NIVEL Y REPLANTEO CON EQUIPO

1.00

121.50

1.00

121.50

1.10

1.00

121.50

1.10

1.00

121.50

1.10

0.10

13.37

1.00

12.00

1.10

0.10

1.32

01.03.03.01 DESAG. COMPACTADO C/EQUIPO TUBERIAS 01.04 SUMINISTRO E INSTALACION DE TUBERIA 01.04.01

1.00

121.50

1.10

0.30

40.10

40.10

m3

01.04.01.01

1.00

121.50

121.50

133.50

m

1.00

12.00

12.00 133.50

m

1.00

133.50

133.50 9.05

m2

MOVIMIENTO DE TIERRAS EXCAV. CON EQ. ALCANT. TN A=1.50M HPROM=1.20M A 2.50M DN=200M

01.03.01 01.03.01.01 01.03.02

MEJORAMIENTO CON MATERIAL GRANULAR NIVELACION Y REFINE DE FONDO DE ZANJA CONFORMACION DE CAMA DE APOYO CONFORMACION DE CAMA DE APOYO, CON MATERIAL DE

01.03.02.01 PRESTAMO, H=10CM

MECHAS P/ TUBERIA

01.03.03

RELLENO DE ZANJA RELLENO PROTECTOR CON ARENA HASTA H=0.30M S/CLAVE TUB.

ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO4435 DN 200 mm.

01.04.01.02 20 01.05 01.05.01.01

01.06 01.06.01

SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4435 DN200mm Ssimilar item: 01.04.01.02

CAMARAS DE INSPECCION ENCOFRADO Y DESENCOFRADO DE CAMARA DE INSPECCION

PRUEBA HIDRAULICA DE TUBERIA PVC ISO4435 DN 200mm S-20 EN COLECTORES

CONFORMACION DE CAMA DE APOYO, CON MATERIAL DE

02.02.02.01 PRESTAMO, H=10CM RELLENO 02.02.02

RELLENO DE ZANJA C/MAQ. MATERIAL GRANULAR SOBRE LA CLAVE

02.02.02.01 DE LA TUBERIA, H=0.20m

TUBERIAS 02.03 SUMINISTRO E INSTALACION DE TUBERIA 02.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO1452 DN 60MM C02.03.01.01 7.5

02.04 02.04.01 02.05 02.05.01

Perimetro 1.00

3.77

1.30

4.90

1.00

3.77

1.10

4.15

PRUEBA HIDRAULICA

AGUA POTABLE 02 OBRAS PRELIMINARES 02.01 TRAZO Y REPLANTEO PARA AGUA POTABLE 02.01.01 MOVIMIENTO DE TIERRAS 02.02 NIVELACION Y REFINE 02.02.01 NIVELACION Y REFINE DE FONDO DE ZANJA 02.02.01.01 CONFORMACION DE CAMA DE APOYO 02.02.02

02.03.02 02.03.02.01

0.45

1.00

121.50

121.50

121.50

m

1.00

121.50

121.50

121.50

m

1.00

121.50

0.80

97.20

97.20

m2

1.00

121.50

0.80

0.10

9.72

9.72

m3

1.00

121.50

0.80

0.20

19.44

19.44

m3

1.00

121.50

121.50

131.50

m

1.00

10.00

10.00

1.00

121.50

121.50

131.50

m

1.00

10.00

10.00

1.00

121.50

121.50

121.50

m

1.00

121.50

121.50

121.50

m

ALINEAMIENTO Y AJUSTE ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO1452 DN 60MM PRUEBA HIDRAULICA PRUEBA HIDRAULICA DE TUBERIA PVC ISO1452 DN 60MM DESINFECCION DE TUBERIAS DESINFECCION DE TUBERIAS PVC ISO1452 DN 60MM

MUNICIPALIDAD PROVINCIAL DEL SANTA Gerencia de Obras Publicas Sub Gerencia de Proyectos y Estudios Técnicos

ADICIONAL DE OBRA N°01 POR OBRAS COMPLEMENTARIAS Y MAYORES METRADOS CON DEDUCTIVO VINCULANTE: "MEJORAMIENTO Y CONSTRUCCION DE PISTAS EN EL P.J. DOS DE MAYO, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA-ANCASH" I-ETAPA

ADICIONAL DE OBRA 01.00

PAVIMENTACION

01.01

TRABAJOS PRELIMINARES

01.01.01

TRAZO, NIVELACION Y REPLANTEO

PLANO

Descripción

Cantidad

Largo (m)

Ancho (m)

UNID.

M2

Area (m2)

Metrado Parcial

328.03

328.03

PAVIMENTACION FLEXIBLE TIPO I 1.00

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

01.02

328.03

MOVIMIENTO DE TIERRAS

01.02.01

CORTE HASTA NIVEL DE SUBRASANTE

PLANO

Descripción

Cantidad

Largo (m)

UNID.

M3

Area (m2)

Alt. (m)

Metrado Parcial

328.03

0.70

229.62

PAVIMENTACION FLEXIBLE TIPO I 1.00

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

01.02.02

PREPARACION DE SUB-RASANTE C/MOTONIVELADORA

PLANO

Descripción

Cantidad

Largo (m)

Ancho (m)

229.62

UNID.

M2

Area. (m2)

Metrado Parcial

328.03

328.03

PAVIMENTACION FLEXIBLE TIPO I 1.00

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

01.02.03

ELIMINACION DE MATERIAL EXCEDENTE

Gráfico

01.03

01.03.01

UNID.

Descripción

Cantidad

Corte

1.00

Volumen (m3) 229.62

328.03

1.25

M3 Metrado Parcial 287.03

METRADO TOTAL

287.03

COEF. ESP.

Alto (m)

PAVIMENTO FLEXIBLE

MEJORAMIENTO DE SUELO CON MATERIAL GRANULAR EN PAVIMENTO TIPO I: TAM. MAX 2"-4", A-1-b, IP=0, e=30cm

PLANO

Descripción

Cantidad

Largo (m)

Ancho (m)

UNID.

M2

Area (m2)

Metrado Parcial

328.03

328.03

PAVIMENTACION FLEXIBLE TIPO I 1.00

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

01.03.02 PLANO

SUB - BASE DE MATERIAL GRANULAR E= 0.20 M. Descripción

Cantidad

Largo (m)

Ancho (m)

328.03

UNID.

M2

Area (m2)

Metrado Parcial

PAVIMENTACION FLEXIBLE TIPO I 1.00

JR. LIMA. ENTRE PARCELA - JR. LIMA

328.03

METRADO TOTAL

01.03.03

BASE DE AFIRMADO A-1-a, E= 0.20 M.

PLANO

Descripción

Cantidad

Largo (m)

Ancho (m)

328.03

328.03

UNID.

M2

Area (m2)

Metrado Parcial

328.03

328.03

PAVIMENTACION FLEXIBLE TIPO I 1.00

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

01.03.04

IMPRIMACION ASFALTICA MC-30

PLANO

Descripción

Cantidad

Largo (m)

Ancho (m)

328.03

UNID.

M2

Area (m2)

Metrado Parcial

328.03

328.03

PAVIMENTACION FLEXIBLE TIPO I 1.00

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

01.03.05

CARPETA ASFALTICA EN CALIENTE DE 2"

PLANO

Descripción

Cantidad

Largo (m)

Ancho (m)

328.03

UNID.

M2

Area (m2)

Metrado Parcial

328.03

328.03

PAVIMENTACION FLEXIBLE TIPO I 1.00

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

01.04

SEÑALIZACION

01.04.01

PINTADO DE PAVIMENTOS ( LINEA DISCONTINUA) Descripción

Cantidad

Largo (m)

Ancho (m)

UNID.

ML

Vaces

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA

8.00

3.00

24.00

LINEA DE 3 M

6.00

3.00

18.00 METRADO TOTAL

01.04.02

PINTADO DE PAVIMENTOS ( LINEA CONTINUAS) Descripción

Cantidad

Largo (m)

Ancho (m)

42.00

UNID.

ML

Veces

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA

2.00

59.00

118.00

BORDE DE PAVIMENTO

1.00

34.60

34.60 METRADO TOTAL

01.05

328.03

152.60

VARIOS

01.05.01

NIVELACION DE TAPAS DE BUZONES Descripción

Cantidad

Largo (m)

Ancho (m)

UNID.

UND

Veces

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA

2.00

2.00 METRADO TOTAL

2.00

02.00

VEREDAS

02.01

TRABAJOS PRELIMINARES

02.01.01

TRAZO NIVELACION Y REPLANTEO TOPOGRAFICO

PLANO

Descripción

UNID.

M2

Area (m2)

Metrado Parcial

1.00

5.74

5.74

1.00

3.60

3.60

Cantidad

Largo (m)

Ancho (m)

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

02.02

9.34

MOVIMIENTO DE TIERRAS

02.02.01

CORTE SUPERFICIAL MANUAL HASTA 0.20m

PLANO

Descripción

UNID.

M3

Area (m2)

Alto

Metrado Parcial

1.00

5.74

0.20

1.15

1.00

3.60

0.20

0.72

Cantidad

Largo (m)

JR. LIMA. ENTRE PARCELA - JR. LIMA

METRADO TOTAL

02.02.02

EXCAVACION UÑAS DE VEREDAS

PLANO

Descripción

1.87

UNID.

M3

Alto

Metrado Parcial

Cantidad

Largo (m)

Area (m2)

1.00

17.40

0.04

0.70

METRADO TOTAL

0.70

JR. LIMA. ENTRE PARCELA - JR. LIMA

02.02.03

PREPARACION DE SUBRASANTE C/PLANCHA PARA VEREDAS

PLANO

Descripción

Cantidad

Largo (m)

Area (m2)

UNID.

M2

Alto

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA

02.02.04

1.00

5.74

5.74

1.00

3.60

3.60

METRADO TOTAL

9.34

AFIRMADO DE E=4" PARA VEREDAS, IP=0

PLANO

Descripción

Cantidad

Largo (m)

Area (m2)

UNID.

M2

Alto

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA

02.02.05

1.00

5.74

5.74

1.00

3.60

3.60

METRADO TOTAL

9.34

ELIMINACION DE MATERIAL EXCEDENTE

PLANO

Descripción

Cantidad

Largo (m)

UNID.

M2

Area (m2)

Alto

Metrado Parcial

1.87

1.20

2.24

JR. LIMA. ENTRE PARCELA - JR. LIMA

Corte

1.00

Excav. De uñas

1.00

0.70

1.20

METRADO TOTAL

02.03

02.03.01

0.84

3.08

VEREDAS

CONCRETO VEREDA F´C=175KG/CM2 E=4" I/ENC ACABADO 1:2/BRUÑADO/CURADO

PLANO

Descripción

Cantidad

Largo (m)

Area (m2)

UNID.

M2

Alto

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA

02.03.02

1.00

5.74

5.74

1.00

3.60

3.60

METRADO TOTAL

9.34

UÑA DE VEREDAS F´C = 175KG/CM2

PLANO

Descripción

Cantidad

Largo (m)

1.00

17.40

Area (m2)

UNID.

ML

Alto

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA 17.40

METRADO TOTAL

02.03.03

PINTURA EN BORDE DE VEREDA P= 0.30 M

PLANO

Descripción

Cantidad

Largo (m)

1.00

5.50

Area (m2)

17.40

UNID.

ML

Alto

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA 5.50

METRADO TOTAL

02.03.04

JUNTAS DE DILATACION ASFALTICA, E=1", @4.0m

PLANO

Descripción

Cantidad

Largo (m)

1.00

3.60

Area (m2)

5.50

UNID.

ML

Alto

Metrado Parcial

JR. LIMA. ENTRE PARCELA - JR. LIMA 3.60

METRADO TOTAL

03.01 03.01 03.01.01

3.60

SARDINELES DE CONCRETO SARDINEL SUMERGIDO EXCAVACION DE ZANJAS PARA SARDINELES

PLANO

Descripción

Cantidad

longitud(m)

Ancho (m)

UNID.

M3

Alto (m)

Metrado Parcial

SARDINEL SUMERGIDO JR. JOSÉ OLAYA INTERSECCION JR. MARIA PARADO DE BELLIDO

INTERSECCION JR. SAN MARTIN

1.00

6.38

0.25

0.35

0.56

1.00

6.17

0.25

0.35

0.54

1.00

6.45

0.25

0.35

0.56

1.00

6.28

0.25

0.35

0.55

1.00

7.20

0.25

0.35

0.63

1.00

6.72

0.25

0.35

0.59

1.00

7.90

0.25

0.35

0.69

JR. LIMA INTERSECCION JR. LA MARINA PROLON. SANTA CRUZ INTERSECCION JR. LIMA

INTERSECCION JR. SANTA ROSA

1.00

7.08

0.25

0.35

0.62

1.00

5.36

0.25

0.35

0.47

METRADO TOTAL

03.01.02

ELIMINACION DE MATERIAL EXCEDENTE Descripción

Cantidad

Volumen (m3)

Excavacion de zanja

1.00

5.20

Gráfico

03.01.03

Descripción

Cantidad

longitud(m)

UNID.

M3

Alto (m)

Metrado Parcial

COEF. ESP.

1.20

6.24

METRADO TOTAL

6.24

SARDINEL SUMERGIDO ENCOFRADO Y DESENCOFRADO

PLANO

5.20

Ancho (m)

UNID.

M2

Alto (m)

Metrado Parcial

SARDINEL SUMERGIDO JR. JOSÉ OLAYA INTERSECCION JR. MARIA PARADO DE BELLIDO

INTERSECCION JR. SAN MARTIN

2.00

6.38

0.35

4.47

2.00

6.17

0.35

4.32

2.00

6.45

0.35

4.52

2.00

6.28

0.35

4.40

2.00

7.20

0.35

5.04

2.00

6.72

0.35

4.70

2.00

7.90

0.35

5.53

2.00

7.08

0.35

4.96

2.00

5.36

JR. LIMA INTERSECCION JR. LA MARINA PROLON. SANTA CRUZ INTERSECCION JR. LIMA

INTERSECCION JR. SANTA ROSA

0.35 METRADO TOTAL

03.01.04

SARDINELES SUMERGIDO DE CONCRETO DE f'c=175 kg/cm2

PLANO

Descripción

Cantidad

longitud(m)

Area Cad

3.75

41.70

UNID.

M3

Alto (m)

Metrado Parcial

SARDINEL SUMERGIDO JR. JOSÉ OLAYA INTERSECCION JR. MARIA PARADO DE BELLIDO

INTERSECCION JR. SAN MARTIN

1.00

6.38

0.05

0.33

1.00

6.17

0.05

0.32

1.00

6.45

0.05

0.34

1.00

6.28

0.05

0.33

1.00

7.20

0.05

0.38

2.00

6.72

0.05

0.71

2.00

7.90

0.05

0.83

2.00

7.08

0.05

0.74

2.00

5.36

0.05

0.56

JR. LIMA INTERSECCION JR. LA MARINA PROLON. SANTA CRUZ INTERSECCION JR. LIMA

INTERSECCION JR. SANTA ROSA

METRADO TOTAL

03.01.05

SARDINEL SUMERGIDO ACERO DE REFUERZO

PLANO

Descripción

Cantidad

Veces

Longitud(m)

4.50

UNID.

KG

factor

Metrado Parcial

SARDINEL SUMERGIDO acero horizontal 1/4" acero vertical 3/8"

3

1.00

59.54

0.25

44.66

238

1.00

0.45

0.59

63.23

METRADO TOTAL

107.90

03.01.06

JUNTAS DE DILATACION CON TEKNOPOR 1" Y MASTIQUE ASFALTICO

PLANO

Descripción

Cantidad

Veces

Ancho (m)

UNID.

M2

Alto (m)

Metrado Parcial

0.40

0.89

SARDINEL SUMERGIDO

15

0.15

METRADO TOTAL

04.00

ALCANTARILLA (MAYOR METRADO DE CONCRETO POR NO CONSIDERLO)

04.01.

OBRAS DE CONCRETO ARMADO

04.01.01.

CONCRETO F´C=210KG/CM2

PLANO

Descripción

0.90

UNID.

M3 Metrado Parcial

Cantidad

Long (m)

Ancho (m)

Alto (m)

FONDO

2.00

9.00

0.25

1.90

8.55

LOSA

2.00

9.00

2.50

0.25

11.25

PAREDES

2.00

9.00

0.20

1.20

4.32

ALCANTARILLA TIPO CAJON

METRADO TOTAL

24.12

MUNICIPALIDAD PROVINCIAL DEL SANTA Gerencia de Obras Publicas Sub Gerencia de Proyectos y Estudios Técnicos

ADICIONAL DE OBRA N°01 POR OBRAS COMPLEMENTARIAS Y MAYORES METRADOS CON DEDUCTIVO VINCULANTE: "MEJORAMIENTO Y CONSTRUCCION DE PISTAS EN EL P.J. DOS DE MAYO, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA-ANCASH" I-ETAPA

DEDUCTIVO VINCULANTE 01.00 05.02 05.02.03

SARDINELES DE CONCRETO SARDINEL SUMERGIDO SARDINEL PERALTADOS ENCOFRADO Y DESENCOFRADO CARA VISTA

PLANO

Descripción SARDINEL PERALTADO JR. LA MARINA PROLONG. JR. MARIA PARADO DE BELLIDO PROLONG. JR. SAN MARTIN

05.02.04

Cantidad

2.00 2.00

longitud(m)

6.52 6.33

UNID.

Ancho (m)

0.15 0.15 METRADO TOTAL

SARDINELES PERALTADOS DE CONCRETO DE f'c=175 kg/cm2

PLANO

Descripción SARDINEL PERALTADO JR. LA MARINA PROLONG. JR. MARIA PARADO DE BELLIDO PROLONG. JR. SAN MARTIN

05.02.05

SARDINEL PERALTADOS ACERO DE REFUERZO

PLANO

Descripción

Cantidad

1.00 1.00

longitud(m)

6.52 6.33

Alto (m)

Ancho (m)

UNID. Area Cad (m2)

0.03 0.03 METRADO TOTAL UNID.

Cantidad

Veces

Longitud(m)

factor

M2 Metrado Parcial

1.96 1.90 3.90 M3 Metrado Parcial

0.16 0.16 0.30 KG Metrado Parcial

SARDINEL PERALTADO

JR. LA MARINA

51

acero vertical 3/8"

05.02.06

PINTURA EN SARDINEL PERALTADO P= 0.30 M

PLANO

Descripción SARDINEL PERALTADO JR. LA MARINA PROLONG. JR. MARIA PARADO DE BELLIDO PROLONG. JR. SAN MARTIN

1.00

0.10 0.59 METRADO TOTAL UNID.

Cantidad

1.00 1.00

Veces

Ancho(m)

Longitud(m)

6.52 6.33 METRADO TOTAL

3.03 3.03 ML Metrado Parcial

6.52 6.33 12.85