Estimate Cost (Equipment & Manpower) Embankment and Surcharge from Sta 19+700 ~ Sta 20+200 Using ingredient

Renting price (VND)

Shift / Man day

EstimateCost

a. Equipment: Excavator 0.7m3

20.84

1,595,000

33,246,792

Bulldozer D40

116.01

1,100,000

127,614,090

Pneumatic tyre roller 25 ton

227.34

1,100,000

250,072,526

4.75

1,650,000

7,842,384

Dump truck (10 ton)

53.00

1,100,000

58,299,137

Tank truck (5.0m3)

73.12

880,000

64,347,765

1,190.75

96,800

115,264,451

2,466.99

71,500

176,389,930

Grader (110 Hp)

b. Manpower: Skill worker Unskill worker

#REF!

#REF!

Total (Equipment & Manpower)

s

#REF!

0

EQUIPMENT & MANPOWER NEEDS FOR TO WORK EMBANKMENT From Sta 19+700 ~ Sta 20+200 No. 1

2

3

4

5

Code BH.1141

BJ.1132

BK.5113

BK.4111

AD.1111

Item Excavation bed road (Grade No.2) Đào móng nền đường ( cấp 2) Máy đào ô tô tự đổ Máy ủi Công nhân k lành nghề Dispose unsuitable soil Vứt bỏ đất không thích hợp Sand filling for bed road (K=95%) Cát lấp cho nền đường Máy ủi Máy san đất, máy ủi DĐầm bánh lốp Xe bồn ( ô tô xitec) Công nhân lành nghề Surcharge filling (K=90%) San lắp cát

Using ingredient

Unit 100m3

a. Machine: Excavator( 0.8m3) Dump truck (10 ton) Bulldozer (110 Hp) b. Manpower: Unskill worker

VB.3120

a. Machine: Bulldozer (110 Hp) Grader (110 Hp) Pneumatic tyre roller Tank truck (5.0m3) b. Manpower: Skill worker a. Machine: Bulldozer (110 Hp) Pneumatic type roller b. Manpower: Unskill worker

Site clearing

Spread geotextile b. Manpower: Skill worker Using ingredient

Shift/Man day

a. Equipment: Excavator (0.8m3) Bulldozer (110 Hp) Pneumatic tyre roller Grader (110 Hp) Dump truck (10 ton) Tank truck (5.0m3) b. Manpower: Skill worker Unskill worker

Quantity

Machine & Manpower needs

59.22

shift shift shift

0.352 0.555 0.06

md

16.320

20.84 32.87 3.67 0.00 966.42 59.22

a. Machine: Dump truck (10 ton)

a. Machine: Bulldozer (140 Hp) b. Manpower: Unskill worker 6

Norm

20.84 116.01 227.34 4.75 53.00 73.12 1,190.75 2,466.99

shift 100m3

0.340

shift shift shift shift

0.130 0.01 0.300 0.200

md 100m3

2.000

shift shift

0.13 0.25

md 100m2

3.160

shift

0.02

md 100m2

0.08

md

1.18

20.13 365.61 47.53 4.75 109.68 73.12 0.00 731.22 466.88 58.83 117.65 0.00 1,475.36 336.20 5.98 0.00 25.21 389.43 459.52

VOLUME OF EMBANKMENT & SURCHARGE Sta 19+740 ~ Sta 20+200 Distance No.

Station

Left side

(m)

Area (m ) Excavation

1

18.41

19+ 700

Right side Width (m)

2

Embankment

Area (m )

Surcharge Site clearing Geotextile

25.27

45.74

Excavation 2.55

Embankment 51.28

Left side Width (m)

2

Surcharge Site clearing Geotextile

19+ 720

3

19+ 740

4

19+ 760

5

19+ 780

0

0

0

15.128

26.683

46.212

28.540

11.752

27.965

48.815

4.111

29.178

51.129

4.79

49.63

70.04

31.310

5.085

15.024

15.886

17.640

20.00

30.140

33.090

10.916

40.573

70.044

43.810

47.020

31.950

35.490

8.918

41.412

70.044

44.050

47.410

20 20 20 20 6

19+ 800

1.775

34.918

52.020

32.660

36.990

8.002

28.501

48.672

30.650

19+ 820

3.504

35.797

53.517

33.290

37.390

3.540

30.496

39.527

35.270

19+ 840

2.895

34.912

54.824

34.140

38.400

1.784

34.548

38.910

37.150

19+ 860

10

19+ 880

11

19+ 900

12

19+ 920

6.210

33.737

56.536

34.720

38.630

1.716

34.580

37.657

36.010

43.520

9.751

31.557

58.156

35.200

39.050

1.486

36.080

36.734

36.960

44.760

6.089

31.482

57.005

36.010

39.830

2.786

28.207

30.465

35.220

42.140

7.200

31.113

56.102

35.930

39.340

4.188

25.496

31.159

35.140

40.910

20 20 20 20 13

19+ 940

8.654

31.633

57.257

36.830

40.380

3.831

25.349

29.734

35.220

19+ 960

8.756

31.442

55.889

37.490

41.050

4.411

26.802

31.608

35.230

19+ 980

11.047

34.142

64.418

37.840

41.290

8.688

26.198

33.045

35.130

20+ 000

17

20+ 020

18

20+ 040

19

20+ 060

13.424

34.314

65.164

38.670

42.340

8.339

20.594

31.360

33.720

39.460

11.891

34.862

65.064

38.580

42.150

7.591

22.679

30.590

34.190

39.610

17.238

33.620

70.538

37.800

41.090

9.261

22.628

30.115

34.090

39.140

13.993

33.738

64.740

38.060

41.720

10.746

20.880

30.142

32.930

37.850

20 20 20 20 20

20+ 080

9.492

36.189

64.726

38.200

42.350

0.940

34.180

30.321

36.310

20+ 100

3.942

39.176

64.258

38.670

42.740

4.014

43.864

31.144

37.600

20+ 120

4.472

35.797

63.415

38.490

42.320

2.892

46.595

30.728

36.560

20+ 140

24

20+ 160

25

20+ 180

26

20+ 200

0.000

51.205

62.221

39.370

44.220

0.366

55.407

29.779

38.390

49.610

0.000

57.348

61.041

39.720

45.500

0.000

101.890

29.467

44.760

62.120

0.000

58.159

60.091

40.000

46.610

0.000

79.052

24.442

43.650

62.100

0.000

71.506

59.870

42.150

51.530

0.000

68.812

23.685

42.020

59.030

20 20 20 Total Volume

0.00

73.32

1,009.02

1,400.89

0.00

151.28

266.83

462.12

285.40

313.10

98.70

646.49

859.30

176.40

268.80

546.48

950.27

586.80

644.00

160.01

555.97

859.30

614.50

158.63

571.43

999.44

620.90

685.80

198.34

819.85

1,400.88

878.60

58.86

640.96

1,031.49

646.10

724.80

169.20

699.13

1,187.16

747.00

52.79

707.15

1,055.37

659.50

743.80

115.42

589.97

881.99

659.20

63.99

707.09

1,083.41

674.30

757.90

53.24

650.44

784.37

724.20

91.05

686.49

1,113.60

688.60

770.30

35.00

691.28

765.67

731.60

159.61

652.94

1,146.92

699.20

776.80

32.02

706.60

743.91

729.70

158.40

630.39

1,151.61

712.10

788.80

42.72

642.87

671.99

721.80

132.89

625.95

1,131.07

719.40

791.70

69.74

537.03

616.24

703.60

158.54

627.46

1,133.59

727.60

797.20

80.19

508.45

608.93

703.60

174.10

630.75

1,131.46

743.20

814.30

82.42

521.51

613.42

704.50

198.03

655.84

1,203.07

753.30

823.40

130.99

530.00

646.53

703.60

244.71

684.56

1,295.82

765.10

836.30

170.27

467.92

644.05

688.50

253.15

691.76

1,302.28

772.50

844.90

159.30

432.73

619.50

679.10

291.29

684.82

1,356.02

763.80

832.40

168.52

453.07

607.05

682.80

312.31

673.58

1,352.78

758.60

828.10

200.07

435.08

602.57

670.20

234.85

699.27

1,294.66

762.60

840.70

116.86

550.60

604.63

692.40

134.34

753.65

1,289.84

768.70

850.90

49.54

780.44

614.65

739.10

84.14

749.73

1,276.73

771.60

850.60

69.06

904.59

618.72

741.60

44.72

870.02

1,256.36

778.60

865.40

32.58

1,020.02

605.07

749.50

0.00

1,085.53

1,232.62

790.90

897.20

3.66

1,572.97

592.46

831.50

0.00

1,155.07

1,211.32

797.20

921.10

0.00

1,809.42

539.09

884.10

0.00

1,296.65

1,199.61

821.50

981.40

0.00

1,478.64

481.27

856.70

3,610.53

17,547.14

28,118.84

17,067.50 18,980.90

2,311.17

19,014.09

18,569.64

16,837.40

45.200

20 23

0.00

46.490

20 22

457.38

43.430

20 21

252.74

40.450

20 16

184.05

41.070

20 15

Embankment Surcharge Site clearing

41.030

20 14

Surcharge Site clearing Geotextile Excavation

44.960

20 9

Embankment

Area (m2)

41.670

20 8

Volume (m ) 3

34.280

20 7

Area (m ) 2

70.05

20 2

Excavation

Right side

Volume (m ) 3

Distance No.

Station

Left side

(m)

Area (m2) Excavation

19+800.00

Embankment

Right side Width (m)

Surcharge Site clearing Geotextile

Area (m2) Excavation

Embankment

Left side Width (m)

Surcharge Site clearing Geotextile

Excavation

Right side

Volume (m3)

Area (m2)

Embankment

Surcharge Site clearing Geotextile Excavation

Volume (m3)

Area (m2)

Embankment Surcharge Site clearing

NKMENT & SURCHARGE 0 ~ Sta 20+200 Right side

Total of both side Area (m )

Volume (m3)

2

Geotextile

Excavation

Embankment

Area (m2) Surcharge

Site clearing Geotextile

0.00

257.37

1,261.76

1,858.27

200.00

249.98

913.32

1,321.42

670.20

428.81

1,102.45

1,809.57

1,201.30

1,314.20

944.30

356.97

1,391.28

2,400.32

1,499.50

1,630.10

816.90

228.06

1,340.09

2,218.65

1,393.10

1,541.70

759.50

168.21

1,297.12

1,937.36

1,318.70

1,503.30

866.30

117.23

1,357.53

1,867.78

1,398.50

1,624.20

884.80

126.05

1,377.77

1,879.27

1,420.20

1,655.10

882.80

191.63

1,359.54

1,890.83

1,428.90

1,659.60

869.00

201.12

1,273.26

1,823.60

1,433.90

1,657.80

830.50

202.63

1,162.98

1,747.31

1,423.00

1,622.20

819.40

238.73

1,135.91

1,742.52

1,431.20

1,616.60

821.00

256.52

1,152.26

1,744.88

1,447.70

1,635.30

815.20

329.02

1,185.84

1,849.60

1,456.90

1,638.60

799.10

414.98

1,152.48

1,939.87

1,453.60

1,635.40

790.70

412.45

1,124.49

1,921.78

1,451.60

1,635.60

787.50

459.81

1,137.89

1,963.07

1,446.60

1,619.90

769.90

512.38

1,108.66

1,955.35

1,428.80

1,598.00

812.80

351.71

1,249.87

1,899.29

1,455.00

1,653.50

899.20

183.88

1,534.09

1,904.49

1,507.80

1,750.10

916.90

153.20

1,654.32

1,895.45

1,513.20

1,767.50

948.10

77.30

1,890.04

1,861.43

1,528.10

1,813.50

1,117.30

3.66

2,658.50

1,825.08

1,622.40

2,014.50

1,242.20

0.00

2,964.49

1,750.41

1,681.30

2,163.30

1,211.30

0.00

2,775.29

1,680.88

1,678.20

2,192.70

20,274.90

5,921.70

36,561.23

46,688.48

33,619.50

38,942.70

Right side

Total of both side Area (m2) Geotextile

Volume (m3) Excavation

Embankment

Area (m2) Surcharge

Site clearing Geotextile

Related Documents

Manpower
June 2020 9
Manpower
November 2019 20
Shift
June 2020 18