ISTQB CTFL Study Session Section 6
November 2006 Aberdeen Global IT Team
Booz Allen Confidential
1
Overview Introductions Review of Section 6 Practice Quiz Open Forum
Booz Allen Confidential
2
Introductions Name Tenure With Firm Primary Job Function(s) Testing Tools Used
Booz Allen Confidential
3
1. Name the test tool used by programmers to reproduce failures, investigate the state of programs and find the corresponding defect. a.
Configuration management tool
b.
Debugging tool
c.
Unit test framework tool
d.
Stress testing tool
b. Debugging tool Syllabus Section 6.1
Booz Allen Confidential
4
2. Which of the following tools offer support more appropriate for developers? a. Static Analysis tools b. Coverage measurement tools c. Test Comparators d. Modeling tools d. a, b & d Syllabus Section 6.1.3 & 6.1.5
Booz Allen Confidential
5
3. True or false, coverage measurement tools apply to all test activities over the entire software life cycle. a.
True
b.
False
e.
False
Syllabus Section 6.1.2
Booz Allen Confidential
6
4. Identify an objective of a pilot project: a.
Assessment of organizational maturity, strengths and weaknesses
b.
Defining usage guidelines
c.
Identification of opportunities for an improved test process supported by tools
d.
Learn more detail about the tool
d. Learn more detail about the tool Syllabus Section 6.3
Booz Allen Confidential
7
5. A gradual implementation with initial filters to exclude some messages
is an effective approach for what type of testing tools? a.
Test management tools
b.
Static analysis tools
c.
Performance tools
d.
Test execution tools
b. Static analysis tools Syllabus Section 6.2.2
Booz Allen Confidential
8
6. Identify the testing tool(s) that may have special considerations
for use
A. Dynamic Analysis B.
Test execution
C.
Static Analysis
D.
Monitoring a.
A, B & C
b.
C&D
c.
B&C
d.
all of the above
c. B & C Syllabus Section 6.2.2
Booz Allen Confidential
9
7. Identify one or more of the potential benefit(s) of using tools: A.
Objective assessment
B.
Capture tests by recording the actions of a manual tester
C.
Replacement for test design and/or manual testing
D.
Purchasing or leasing a tool a. A & B b. A only c. D d. None of the above
b. A only Syllabus Section 6.2.1
Booz Allen Confidential
10
8. This test tool simulates the environment in which the test object will run: a.
Dynamic analysis tool
b.
Monitoring tool
c.
Coverage management tool
d.
Test harness/unit test framework tool
d. Test harness/unit test framework tool Syllabus Section 6.1.5
Booz Allen Confidential
11
9. Which tool(s) need to interface with other tools or spreadsheets in
order to produce information in the best format for an organization? a.
Monitoring tool
b.
Test management tool
c.
Test comparators
d.
Performance testing tool
b. Test management tool Syllabus Section 6.2.2
Booz Allen Confidential
12
10. Requirements management tools ________. a.
check for consistency
b.
offer quantitative analysis (metrics) related to the tests
c.
aid in understanding the code
d.
may accelerate and improve the development process
h.
Check for consistency
Syllabus Section 6.1.2
Booz Allen Confidential
13
11. Which characteristic identifies a tool that supports performance
and monitoring?
a. Can calculate metrics from the code b. May facilitate the testing of components or part of a system by simulating the environment in which that test object will run. c. Often based on automated repetitive execution of tests, controlled by parameters d. None of the above c. Often based on automated repetitive execution of tests, controlled by parameters Syllabus Section 6.1.6
Booz Allen Confidential
14
12. Which of the following answers reflect characteristics of test management tools?: A.
Logging of test results and generation of progress reports
B.
Improve the efficiency of testing activities by automating repetitive tasks.
C.
Independent version control or interface with an external configuration management tool
D.
Assignment of actions to people (e.g. fix or confirmation test) a.
B&D
b.
A, B & D
c.
A&C
d.
B, C & D
c. A & C Syllabus Section 6.1.2
Booz Allen Confidential
15
13. Performance testing tools need someone with expertise in performance testing to help design the tests and interpret the results a.
True
b.
False
e.
True
Syllabus Section 6.2.2
Booz Allen Confidential
16
14. This is done in a small-scale pilot project, making it possible to minimize impacts if major hurdles are found: a.
Deployment of the test tool
b.
Data-driven approach
c.
Proof-of-concept
d.
None of the above
c. Proof-of-concept Syllabus Section 6.3
Booz Allen Confidential
17
15. Which testing tool supports developers, testers &/or quality assurance personnel in finding defects before dynamic testing? a.
Test Data Preparation tool
b.
Modeling tool
c.
Static analysis tool
d.
Configuration Management tool
c. Static analysis tool Syllabus Section 6.1.3
Booz Allen Confidential
18
16. Success factors for the deployment of the tool within an organization include: a.
Rolling out the tool to the rest of the organization incrementally
b.
Defining usage guidelines, implementing a way to learn lessons from tool use.
c.
Adapting and improving processes to fit with the use of the too
d.
Evaluation against clear requirements and objective criteria
a, b & c Syllabus Section 6.3
Booz Allen Confidential
19
17. The probe effect is the consequence of what type of testing tool? a. Intrusive b.
Performance
c.
Inclusive
d.
Functional
a. Intrusive . Syllabus Section 6.1.1
Booz Allen Confidential
20
18. Which scripting technique uses a more generic script that can
read the test data and perform the same test with different data? a.
Timing approach
b.
Test execution approach
c.
Data-driven approach
d.
Keyword-driven approach
c. Data-driven approach Syllabus Section 6.2.2
Booz Allen Confidential
21
19. Identify the testing tool that may also be referred to as a capture playback tool a. Test harness/unit test framework b. Test execution c. Coverage measurement d. Security e.
a&b
b. Test execution tools Syllabus Section 6.1.5
Booz Allen Confidential
22
20. Mercury Quality Test Professional could be classified under which of the following tools: –
Static Analysis
–
Test Data preparation
–
Test Execution
–
Heuristic
c. Test Execution Syllabus Section 6.1.5
Booz Allen Confidential
23
Open Forum
Booz Allen Confidential
24