TIME SCHEDULE PAKET PEKERJAAN PERUSAHAAN NO. KONTRAK

: : : :

PRESERVASI JALAN BTS.KOTA PALOPO - WOTU PRESERVASI REKONSTRUKSI/REHABILITASI JALAN PT. GENITOV FAJAR HK.02.03/PPK S-01/ADD1/APBN/II/2019

RENCANA WAKTU PEKERJAAN

KONTRAK AWAL NO. MATA PEMBAYARAN

U RAIAN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

TOTAL HARGA (Rp.)

BOBOT (%)

1

2

3

4

5

6=4x5

7

DIVISI I 1.2

FEB 2019 26-04

MARET 2019 05-11

12-18

19-25

APRIL 2019 26-01

02-08

09-15

MEI 2019

16-22

23-29

30-06

07-13

14-20

JUNI 2019 21-27

28-03

04-10

11-17

JULI 2019

18-24

25-01

16-22

AGUSTUS 2019 23-29

30-05

06-12

13-19

SEPTEMBER 2019 20-26

27-02

03-09

10-16

17-23

OKTOBER 2019 24-30

01-06

07-13

14-20

NOVEMBER 2019 21-27

28-03

04-10

11-17

18-25

DESEMBER 2019 26-02

03-09

10-16

17-23

KETERANGAN 24-31

100

Mobilisasi

LS

1.00

104,190,000.00

104,190,000.00

1.23

Manajemen dan Keselamatan Lalu Lintas

LS

0.50

18,660,000.00

9,330,000.00

0.11

1.8.(2)

Pengamanan Lingkungan Hidup

0.409

0.409

0.409 0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

1.17.(1a)

Pengujian PH

Buah

3.00

10,000.00

30,000.00

0.00

0.00

0.00

0.00

1.17.(1b)

Pengujian Oksigen Terlarut (DO)

Buah

3.00

28,000.00

84,000.00

0.00

1.17.(1c)

Pengujian Zat Padat Terlarut (TDS)

Buah

3.00

38,500.00

115,500.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.17.(1d)

Pengujian Zat Padat Tersuspensi (TSS)

Buah

3.00

38,500.00

115,500.00

0.00

0.00

0.00

0.00

1.17.(1e)

Pengujian Biological Oxygen Demand (BOD)

Buah

3.00

55,000.00

165,000.00

0.00

1.17.(1f)

Pengujian Chemical Oxygen Demand (COD)

Buah

3.00

55,000.00

165,000.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.17.(1g)

Pengujian Coliform

Buah

3.00

127,000.00

381,000.00

0.00

1.17.(1h)

Pengujian Destruksi CU, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn

Buah

3.00

430,000.00

1,290,000.00

0.02

0.00 0.01

0.00 0.01

0.00 0.01

1.17.(1i)

Pengujian Sulfurdioksida (SO2)

Buah

3.00

145,000.00

435,000.00

0.01

0.00

0.00

0.00

1.17.(1j)

Pengujian Total Partikulat (TSP) - Debu

Buah

3.00

395,000.00

1,185,000.00

0.01

1.17.(1k)

Pengujian Timah Hitam (Pb)

Buah

3.00

120,000.00

360,000.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.19

Keselamatan dan Kesehatan Kerja

LS

1.00

15,445,000.00

15,445,000.00

0.18

1.21

Manajemen Mutu

LS

0.50

42,500,000.00

21,250,000.00

0.25

154,541,000.00

1.82

JUMLAH - 1

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

SCEDULE RENCANA PRESERVASI REKONSTRUKSI/REHABILITASI JALAN Akhir 01 Juli 2019

0.01 0.02

75

DRAINASE

2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

37.81

30,099.47

1,138,060.79

0.01

2.2.(1)

Pasangan Batu dengan Mortar

M3

17.07

569,825.64

9,726,923.69

0.11

10,864,984.48

0.13

JUMLAH - 2

DIVISI 3

09-15

UMUM

1.8.(1)

DIVISI 2

02-08

0.00

0.00

0.00

0.00 0.03

0.03

0.03

0.03

PEKERJAAN TANAH

3.1.(1)

Galian Biasa

M3

3.1.(7)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

109.67

139,730.16

15,324,207.19

0.18

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

3.1.(8)

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

73.11

135,129.35

37,874.02

9,879,307.13

0.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M2

25,203,514.33

0.30

DIVISI 4

PELEBARAN PERKERASAN DAN BAHU JALAN

DIVISI 5

PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN

601,319,255.11

7.08

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

601,319,255.11

7.08

10,886,300.14

0.13

0.00 0.03 0.02 1.07 0.99

0.00 0.03 0.02 1.07 0.99

0.00 0.03 0.02 1.07 0.99

0.00 0.03 0.02 1.07 0.99

0.00 0.03 0.02 1.07 0.99

0.00 0.03 0.02 1.07 0.99

0.00 0.03 0.02 1.07 0.99

0.00 0.03 0.02 1.07 0.99

0.01 0.12 0.07 3.74 3.45

0.01 0.12 0.07 3.74 3.45

0.01 0.12 0.07 3.74 3.45

0.01 0.12 0.07 3.74 3.45

0.01 0.12 0.07 3.74 3.45

0.01 0.12 0.07 3.74 3.45

0.01 0.12 0.07 3.74 3.45

0.01 0.12 0.07 3.74 3.45

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.31

0.31

0.31

0.31

0.31

0.31

0.31

0.31

207,474.09

JUMLAH - 3

JUMLAH - 4

5.1.(1)

Lapis Pondasi Agregat Kelas A

M3

5.1.(2)

Lapis Pondasi Agregat Kelas B

M3

5.1.(3)

Lapis Pondasi Agregat Kelas S

M3

444,605.86 377,354.28 1,827.47

329,044.67

JUMLAH - 5

DIVISI 6

50

PERKERASAN ASPAL

6.1.(1)

Lapis Resap Pengikat - Aspal Cair/Emulsi

Liter

801.21

13,587.32

6.1.(2a)

Lapis Perekat - Aspal Cair/Emulsi

Liter

7,524.00

6.3.(8)

Bahan anti pengelupasan

Kg

607.76

93,500.00

56,825,560.00

0.67

6.5.(1)

Laston Lapis Aus Asbuton (AC-WC Asb)

Ton

2,603.57

1,254,525.10

3,266,243,914.79

38.47

6.5.(2)

Laston Lapis Antara Asbuton (AC-BC Asb)

Ton

2,536.44

1,188,713.95

3,015,101,615.16

35.52

6,451,213,401.23

75.99

266,478,883.69

3.14

266,478,883.69

3.14

13,577.35

JUMLAH - 6

DIVISI 7

STRUKTUR

7.1.(7a)

Beton Struktur fc’20 Mpa

M3

1,254,534.94

7.3.(1)

Baja Tulangan Polos BjTP 280

Kg

13,794.00

7.3.(2)

Baja Tulangan Sirip BjTP 280

Kg

7.6.(1)

Fondasi Cerucuk, Penyedian dan Pemancangan



7.9.(1)

Pasangan Batu

M3

7.10.(3a)

Bronjong dengan kawat yang dilapisi galvanis

M3

DIVISI 8

PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

8.1.(1)

Cairan Perekat (Epoksi Resin) Penggantian baut biasa Grade B diameter 2,54 cm

1.20

15,202.00 16,289.43 509.76

522,753.62 385,903.57

JUMLAH - 7

8.5.(4b)

102,156,011.14

Kg

104,500.00

Buah

21,195.63

SKh-2.10.b(8)

Perbaikan Pasangan Batu

M3

522,753.62

SKh-2.10.b(4)

Pengecatan Elemen Baja

M2

53,620.60

SKh-2.10.b(5)

Pengecatan Elemen Beton

M2

34,893.26

25

JUMLAH - 8

DIVISI 9. 9.1.(1) 9.1.(2)

PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN Mandor

Jam

20,714.29

Pekerja Biasa

Jam

15,714.29

Dump Truck 3 - 4 m³

Jam

249,700.00

9.1.(8)

Motor Grader Min. 100 PK

Jam

324,500.00

9.1.(4) a

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

9.1.(16)

Penggilas Roda Karet 8 - 10 Ton

Jam

9.1.(17)

Kompresor 4000 - 6500 Ltr/mnt

Jam

9.2.(1)

Marka Jalan Termoplastik

M2

250,800.00 165,000.00 2,382.60

157,048.57

JUMLAH - 9

374,183,926.29

4.41

374,183,926.29

4.41

605,605,859.60

7.13

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.43

0.43

0.43

0.43

0.43

0.43

0.43

0.43

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

2.778 3.596

2.761 6.357

2.761 9.118

2.761 11.879

2.786 14.665

2.786 17.451

2.786 20.237

2.786 23.023

9.584 32.607

9.567 42.174

9.567 51.741

9.567 61.307

9.567 70.874

9.567 80.441

9.567 90.007

9.584 99.591

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 10.1.(4)

Perbaikan Lapis Pondasi Agregat Kelas A

M3

10.1.(8)

Perbaikan Campuran Aspal Panas

M3

10.1.(22)

Pengendalian Tanaman

M2

444,605.86

463.96

SKh-2.10.b(1)

Pembersihan Jembatan

M2

15,586.21

SKh-2.10.a(19)

Pembersihan Drainase



6,735.93

247.61

2,445,805.34

0 JUMLAH - 10 JUMLAH BOBOT RENCANA (%) AKUMULASI RENCANA (%)

605,605,859.60

7.13

8,489,410,824.71

100.00

848,941,082.47

JUMLAH BOBOT REALISASI (%)

9,338,351,907.18

AKUMULASI REALISASI (%)

9,338,351,000.00

0.409 0.409

0.409 0.818

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

0.000 99.591

DEVIASI

Disetujui Oleh; PPK S-01S KPD-TP Dinas Pekerjaan Umum Prov. Sulawesi Selatan

Diperiksa Oleh; PT. PT. WIRANTA BHUANA RAYA (KSO)

Dibuat Oleh; PT. GENYTOV FAJAR

MUHAMMAD ROSYADI, ST., MT. NIP. 1977082320021003

MUHAMMAD TANGNILLA, ST. Supervision Engineer

IGNASIUS YANIAR DIDIN K., ST. General Superintendent

0.000 99.591

0.000 99.591

0.409 100.000

TIME SCHEDULE PAKET PEKERJAAN PERUSAHAAN NO. KONTRAK

: : : :

PRESERVASI JALAN BTS.KOTA PALOPO - WOTU PRESERVASI PEMELIHARAAN RUTIN JALAN PT. GENITOV FAJAR HK.02.03/PPK S-01/ADD1/APBN/II/2019

RENCANA WAKTU PEKERJAAN

KONTRAK AWAL NO. MATA PEMBAYARAN

U RAIAN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

TOTAL HARGA (Rp.)

BOBOT (%)

1

2

3

4

5

6=4x5

7

DIVISI I 1.2

FEB 2019 26-04

MARET 2019 05-11

12-18

19-25

APRIL 2019 26-01

02-08

09-15

16-22

MEI 2019 23-29

30-06

07-13

14-20

JUNI 2019 21-27

28-03

04-10

11-17

18-24

JULI 2019 25-01

02-08

09-15

16-22

AGUSTUS 2019 23-29

30-05

06-12

13-19

SEPTEMBER 2019 20-26

27-02

03-09

10-16

17-23

OKTOBER 2019 24-30

01-06

07-13

14-20

NOVEMBER 2019 21-27

28-03

04-10

11-17

18-25

DESEMBER 2019 26-02

03-09

10-16

17-23

KETERANGAN 24-31

100

UMUM Mobilisasi

LS

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

1.8.(2)

Pengamanan Lingkungan Hidup

1.17.(1a)

Pengujian PH

Buah

1.17.(1b)

Pengujian Oksigen Terlarut (DO)

Buah

1.17.(1c)

Pengujian Zat Padat Terlarut (TDS)

Buah

1.17.(1d)

Pengujian Zat Padat Tersuspensi (TSS)

Buah

1.17.(1e)

Pengujian Biological Oxygen Demand (BOD)

Buah

1.17.(1f)

Pengujian Chemical Oxygen Demand (COD)

Buah

1.17.(1g)

Pengujian Coliform

Buah

1.17.(1h)

Pengujian Destruksi CU, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn

Buah

1.17.(1i)

Pengujian Sulfurdioksida (SO2)

Buah

1.17.(1j)

Pengujian Total Partikulat (TSP) - Debu

Buah

1.17.(1k)

Pengujian Timah Hitam (Pb)

Buah

1.19

Keselamatan dan Kesehatan Kerja

LS

1.21

Manajemen Mutu

LS

SCEDULE RENCANA PRESERVASI PEMELIHARAAN RUTIN JALAN Akhir 31 Desember 2019

JUMLAH - 1

DIVISI 2

75

DRAINASE

2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

2.2.(1)

Pasangan Batu dengan Mortar

M3

JUMLAH - 2

DIVISI 3

PEKERJAAN TANAH

3.1.(1)

Galian Biasa

M3

3.1.(7)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

3.1.(8)

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M2

107.00

139,730.16

14,951,127.65

0.32

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

67.81

207,474.09

14,068,818.24

0.30

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

29,019,945.89

0.63

0.01 0.01

0.01 0.01 0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

0.05 0.02

JUMLAH - 3

DIVISI 4

PELEBARAN PERKERASAN DAN BAHU JALAN

DIVISI 5

PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN

JUMLAH - 4

5.1.(1)

Lapis Pondasi Agregat Kelas A

M3

154.50

444,605.86

68,691,605.80

1.49

5.1.(2)

Lapis Pondasi Agregat Kelas B

M3

88.40

377,354.28

33,358,118.06

0.72

5.1.(3)

Lapis Pondasi Agregat Kelas S

M3

102,049,723.85

2.21

JUMLAH - 5

DIVISI 6

50

PERKERASAN ASPAL

6.1.(1)

Lapis Resap Pengikat - Aspal Cair/Emulsi

Liter

6.1.(2a)

Lapis Perekat - Aspal Cair/Emulsi

Liter

6.3.(8)

Bahan anti pengelupasan

Kg

163.32

93,500.00

15,270,420.00

0.33

6.5.(1)

Laston Lapis Aus Asbuton (AC-WC Asb)

Ton

1,361.01

1,254,525.10

1,707,421,206.45

36.99

6.5.(2)

Laston Lapis Antara Asbuton (AC-BC Asb)

Ton

1,752,820,317.96

37.98

522,753.62

198,411,135.25

4.30

266,478,883.69

198,411,135.25

4.30

2,219.04

13,577.35

JUMLAH - 6

DIVISI 7

STRUKTUR

7.1.(7a)

Beton Struktur fc’20 Mpa

M3

7.3.(1)

Baja Tulangan Polos BjTP 280

Kg

7.3.(2)

Baja Tulangan Sirip BjTP 280

7.6.(1)

Fondasi Cerucuk, Penyedian dan Pemancangan



7.9.(1)

Pasangan Batu

M3

7.10.(3a)

Bronjong dengan kawat yang dilapisi galvanis

M3

DIVISI 8

PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

30,128,691.51

0.65

0.01 0.00 0.31

0.01 0.01 0.00 0.00 0.31 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.01 0.00 0.31

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.02 0.01 1.21

0.04

0.04 0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

Kg

379.55

JUMLAH - 7

8.1.(1)

Cairan Perekat (Epoksi Resin)

8.5.(4b)

Penggantian baut biasa Grade B diameter 2,54 cm

Kg Buah

SKh-2.10.b(8)

Perbaikan Pasangan Batu

M3

SKh-2.10.b(4)

Pengecatan Elemen Baja

M2

SKh-2.10.b(5)

Pengecatan Elemen Beton

M2

25

JUMLAH - 8

DIVISI 9. 9.1.(1)

PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN Jam

821.00

20,714.29

17,006,428.57

0.37

Pekerja Biasa

Jam

821.00

15,714.29

12,901,428.57

0.28

Dump Truck 3 - 4 m³

Jam

62.60

249,700.00

15,631,220.00

0.34

9.1.(8)

9.1.(2) 9.1.(4) a

Mandor

Motor Grader Min. 100 PK

Jam

162.50

324,500.00

52,731,250.00

1.14

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

9.1.(16)

Penggilas Roda Karet 8 - 10 Ton

Jam

8.00

250,800.00

2,006,400.00

0.04

9.1.(17)

Kompresor 4000 - 6500 Ltr/mnt

Jam

8.00

165,000.00

1,320,000.00

0.03

9.2.(1)

Marka Jalan Termoplastik

M2

101,596,727.14

2.20

JUMLAH - 9

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.01 0.01 0.01 0.04

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 10.1.(4)

Perbaikan Lapis Pondasi Agregat Kelas A

M3

48.87

444,605.86

21,727,888.51

0.47

10.1.(8)

Perbaikan Campuran Aspal Panas

M3

744.04

2,445,805.34

1,819,777,003.24

39.43

Pengendalian Tanaman

M2

1,027,328.53

463.96

476,643,747.62

10.33

0.00 0.41 0.11

0.00 0.00 0.41 0.41 0.11 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.00 0.41 0.11

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

0.01 1.23 0.32

SKh-2.10.b(1)

Pembersihan Jembatan

M2

SKh-2.10.a(19)

Pembersihan Drainase

16,816.80

6,735.93

0.03

0.03 0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.960 0.960

0.960 1.920

10.1.(22)



113,276,763.60

2.45

2,431,425,402.97

52.68

4,615,323,253.07

100.00

0 JUMLAH - 10 JUMLAH BOBOT RENCANA (%) AKUMULASI RENCANA (%)

461,532,325.31

JUMLAH BOBOT REALISASI (%)

5,076,855,578.37

AKUMULASI REALISASI (%)

5,076,855,000.00

0.960 2.880

0.960 3.841

0.960 4.801

0.960 5.761

0.960 6.721

0.960 7.681

0.960 8.641

0.960 9.601

0.960 10.561

0.960 11.522

0.960 12.482

0.960 13.442

0.960 14.402

0.960 15.362

0.960 16.322

0.960 17.282

3.181 20.464

3.181 23.645

3.181 26.827

3.181 30.008

3.181 33.190

3.181 36.371

3.181 39.553

3.181 42.734

3.181 45.915

3.181 49.097

3.181 52.278

3.181 55.460

3.181 58.641

3.181 61.823

3.181 65.004

3.181 68.186

3.181 71.367

3.181 74.548

3.181 77.730

3.181 80.911

3.181 84.093

3.181 87.274

3.181 90.456

DEVIASI

Disetujui Oleh; PPK S-01S KPD-TP Dinas Pekerjaan Umum Prov. Sulawesi Selatan

Diperiksa Oleh; PT. PT. WIRANTA BHUANA RAYA (KSO)

Dibuat Oleh; PT. GENYTOV FAJAR

MUHAMMAD ROSYADI, ST., MT. NIP. 1977082320021003

MUHAMMAD TANGNILLA, ST. Supervision Engineer

IGNASIUS YANIAR DIDIN K., ST. General Superintendent

3.181 93.637

3.181 96.819

3.181 100.000

TIME SCHEDULE PAKET PEKERJAAN PERUSAHAAN NO. KONTRAK

: : : :

PRESERVASI JALAN BTS.KOTA PALOPO - WOTU PRESERVASI JEMBATAN PT. GENITOV FAJAR HK.02.03/PPK S-01/ADD1/APBN/II/2019

RENCANA WAKTU PEKERJAAN

KONTRAK AWAL NO. MATA PEMBAYARAN

U RAIAN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

TOTAL HARGA (Rp.)

BOBOT (%)

1

2

3

4

5

6=4x5

7

DIVISI I 1.2

26-04

MARET 2019 05-11

12-18

19-25

APRIL 2019 26-01

02-08

09-15

16-22

MEI 2019 23-29

30-06

07-13

14-20

JUNI 2019 21-27

28-03

04-10

11-17

JULI 2019

18-24

25-01

02-08

09-15

AGUSTUS 2019

16-22

23-29

30-05

06-12

13-19

SEPTEMBER 2019 20-26

27-02

03-09

10-16

17-23

OKTOBER 2019 24-30

01-06

07-13

14-20

NOVEMBER 2019 21-27

28-03

04-10

11-17

18-25

DESEMBER 2019 26-02

03-09

10-16

17-23

KETERANGAN 24-31

100

UMUM Mobilisasi

LS

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

1.8.(2)

Pengamanan Lingkungan Hidup

1.17.(1a)

Pengujian PH

Buah

1.17.(1b)

Pengujian Oksigen Terlarut (DO)

Buah

1.17.(1c)

Pengujian Zat Padat Terlarut (TDS)

Buah

1.17.(1d)

Pengujian Zat Padat Tersuspensi (TSS)

Buah

1.17.(1e)

Pengujian Biological Oxygen Demand (BOD)

Buah

1.17.(1f)

Pengujian Chemical Oxygen Demand (COD)

Buah

1.17.(1g)

Pengujian Coliform

Buah

1.17.(1h)

Pengujian Destruksi CU, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn

Buah

1.17.(1i)

Pengujian Sulfurdioksida (SO2)

Buah

1.17.(1j)

Pengujian Total Partikulat (TSP) - Debu

Buah

1.17.(1k)

Pengujian Timah Hitam (Pb)

Buah

1.19

Keselamatan dan Kesehatan Kerja

LS

1.21

Manajemen Mutu

LS

0.50

18,660,000.00

9,330,000.00

1.66

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.18

0.18

0.18

0.18

0.18

0.18

0.18

0.18

SCEDULE RENCANA PRESERVASI JEMBATAN Akhir 29 Juli 2019

0.50

42,500,000.00

JUMLAH - 1

DIVISI 2

FEB 2019

21,250,000.00

3.78

30,580,000.00

5.44

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

75

DRAINASE

2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

2.2.(1)

Pasangan Batu dengan Mortar

M3

JUMLAH - 2

DIVISI 3

PEKERJAAN TANAH

3.1.(1)

Galian Biasa

M3

3.1.(7)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

3.1.(8)

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M2

1,526.29

37,874.02

JUMLAH - 3

DIVISI 4

PELEBARAN PERKERASAN DAN BAHU JALAN

DIVISI 5

PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN

57,806,740.49

10.29

57,806,740.49

10.29

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

1.10

1.10

1.10

1.10

1.10

1.10

1.10

1.10

JUMLAH - 4

5.1.(1)

Lapis Pondasi Agregat Kelas A

M3

5.1.(2)

Lapis Pondasi Agregat Kelas B

M3

5.1.(3)

Lapis Pondasi Agregat Kelas S

M3

JUMLAH - 5

DIVISI 6

50

PERKERASAN ASPAL

6.1.(1)

Lapis Resap Pengikat - Aspal Cair/Emulsi

Liter

6.1.(2a)

Lapis Perekat - Aspal Cair/Emulsi

Liter

6.3.(8)

Bahan anti pengelupasan

6.5.(1)

Laston Lapis Aus Asbuton (AC-WC Asb)

Ton

6.5.(2)

Laston Lapis Antara Asbuton (AC-BC Asb)

Ton

Kg

JUMLAH - 6

DIVISI 7

STRUKTUR

7.1.(7a)

Beton Struktur fc’20 Mpa

M3

44.14

1,254,534.94

55,375,172.44

9.86

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

1.05

1.05

1.05

1.05

1.05

1.05

1.05

1.05

7.3.(1)

Baja Tulangan Polos BjTP 280

Kg

967.30

13,794.00

13,342,936.20

2.38

7.3.(2)

Baja Tulangan Sirip BjTP 280

Kg

1,514.88

15,202.00

23,029,205.76

4.10

7.6.(1)

Fondasi Cerucuk, Penyedian dan Pemancangan



3,119.37

16,289.43

50,812,754.80

9.05

7.9.(1)

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.02 0.04 0.09 0.10 0.44

0.25 0.44 0.97 1.07 4.53

0.25 0.44 0.97 1.07 4.53

0.25 0.44 0.97 1.07 4.53

0.25 0.44 0.97 1.07 4.53

0.25 0.44 0.97 1.07 4.53

0.25 0.44 0.97 1.07 4.53

0.25 0.44 0.97 1.07 4.53

0.25 0.44 0.97 1.07 4.53

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

0.01 0.02

Pasangan Batu

M3

107.27

522,753.62

56,075,780.47

9.98

7.10.(3a)

Bronjong dengan kawat yang dilapisi galvanis

M3

617.00

385,903.57

238,102,503.57

42.39

266,478,883.69

436,738,353.25

77.75

DIVISI 8

PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

JUMLAH - 7

8.1.(1)

Cairan Perekat (Epoksi Resin)

8.5.(4b)

Penggantian baut biasa Grade B diameter 2,54 cm

Kg

6.27

104,500.00

655,215.00

0.12

Buah

40.00

21,195.63

847,825.17

0.15

SKh-2.10.b(8)

Perbaikan Pasangan Batu

M3

SKh-2.10.b(4)

Pengecatan Elemen Baja

M2

SKh-2.10.b(5)

Pengecatan Elemen Beton

M2

25

JUMLAH - 8

DIVISI 9. 9.1.(1) 9.1.(2)

Mandor

Jam

Pekerja Biasa

Jam

Dump Truck 3 - 4 m³

Jam

9.1.(8)

Motor Grader Min. 100 PK

Jam

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

9.1.(16)

Penggilas Roda Karet 8 - 10 Ton

Jam

9.1.(17)

Kompresor 4000 - 6500 Ltr/mnt

Jam

9.2.(1)

Marka Jalan Termoplastik

M2

9.1.(4) a

1,503,040.17

0.27

35,089,711.81

6.25

PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN

JUMLAH - 9

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 10.1.(4)

Perbaikan Lapis Pondasi Agregat Kelas A

M3

10.1.(8)

Perbaikan Campuran Aspal Panas

M3

10.1.(22)

Pengendalian Tanaman

M2

SKh-2.10.b(1)

Pembersihan Jembatan

M2

Pembersihan Drainase



SKh-2.10.a(19)

2,251.33

15,586.21

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.67

0.67

0.67

0.67

0.67

0.67

0.67

1.042 1.042

1.042 2.083

1.042 3.125

1.042 4.167

1.042 5.208

1.042 6.250

1.042 7.292

1.042 8.333

1.042 9.375

1.042 10.417

1.042 11.458

1.042 12.500

1.042 13.542

1.042 14.583

10.677 25.260

10.677 35.938

10.677 46.615

10.677 57.292

10.677 67.969

10.677 78.646

10.677 89.323

0.67 0

JUMLAH - 10 JUMLAH BOBOT RENCANA (%) AKUMULASI RENCANA (%)

35,089,711.81

6.25

561,717,845.72

100.00

56,171,784.57

JUMLAH BOBOT REALISASI (%)

617,889,630.29

AKUMULASI REALISASI (%)

617,889,000.00

10.677 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

0.000 100.000

DEVIASI

Disetujui Oleh; PPK S-01S KPD-TP Dinas Pekerjaan Umum Prov. Sulawesi Selatan

Diperiksa Oleh; PT. PT. WIRANTA BHUANA RAYA (KSO)

Dibuat Oleh; PT. GENYTOV FAJAR

MUHAMMAD ROSYADI, ST., MT. NIP. 1977082320021003

MUHAMMAD TANGNILLA, ST. Supervision Engineer

IGNASIUS YANIAR DIDIN K., ST. General Superintendent

0.000 100.000

0.000 100.000

0.000 100.000

TIME SCHEDULE PAKET PEKERJAAN PERUSAHAAN NO. KONTRAK

: : : :

PRESERVASI JALAN BTS.KOTA PALOPO - WOTU PRESERVASI RUTIN JEMBATAN PT. GENITOV FAJAR HK.02.03/PPK S-01/ADD1/APBN/II/2019

RENCANA WAKTU PEKERJAAN

KONTRAK AWAL NO. MATA PEMBAYARAN

U RAIAN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

TOTAL HARGA (Rp.)

BOBOT (%)

1

2

3

4

5

6=4x5

7

DIVISI I 1.2

FEB 2019 26-04

MARET 2019 05-11

12-18

19-25

APRIL 2019 26-01

02-08

09-15

16-22

MEI 2019 23-29

30-06

07-13

14-20

JUNI 2019 21-27

28-03

04-10

11-17

18-24

JULI 2019 25-01

02-08

09-15

16-22

AGUSTUS 2019 23-29

30-05

06-12

13-19

SEPTEMBER 2019 20-26

27-02

03-09

10-16

17-23

OKTOBER 2019 24-30

01-06

07-13

14-20

NOVEMBER 2019 21-27

28-03

04-10

11-17

18-25

DESEMBER 2019 26-02

03-09

10-16

17-23

KETERANGAN 24-31

100

UMUM Mobilisasi

LS

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

1.8.(2)

Pengamanan Lingkungan Hidup

1.17.(1a)

Pengujian PH

Buah

1.17.(1b)

Pengujian Oksigen Terlarut (DO)

Buah

1.17.(1c)

Pengujian Zat Padat Terlarut (TDS)

Buah

1.17.(1d)

Pengujian Zat Padat Tersuspensi (TSS)

Buah

1.17.(1e)

Pengujian Biological Oxygen Demand (BOD)

Buah

1.17.(1f)

Pengujian Chemical Oxygen Demand (COD)

Buah

1.17.(1g)

Pengujian Coliform

Buah

1.17.(1h)

Pengujian Destruksi CU, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn

Buah

1.17.(1i)

Pengujian Sulfurdioksida (SO2)

Buah

1.17.(1j)

Pengujian Total Partikulat (TSP) - Debu

Buah

1.17.(1k)

Pengujian Timah Hitam (Pb)

Buah

1.19

Keselamatan dan Kesehatan Kerja

LS

1.21

Manajemen Mutu

LS

SCEDULE RENCANA PRESERVASI RUTIN JEMBATAN Akhir 31 Desember 2019

JUMLAH - 1

DIVISI 2

75

DRAINASE

2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

2.2.(1)

Pasangan Batu dengan Mortar

M3

JUMLAH - 2

DIVISI 3

PEKERJAAN TANAH

3.1.(1)

Galian Biasa

M3

3.1.(7)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

3.1.(8)

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M2

JUMLAH - 3

DIVISI 4

PELEBARAN PERKERASAN DAN BAHU JALAN

DIVISI 5

PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN

JUMLAH - 4

5.1.(1)

Lapis Pondasi Agregat Kelas A

M3

5.1.(2)

Lapis Pondasi Agregat Kelas B

M3

5.1.(3)

Lapis Pondasi Agregat Kelas S

M3

JUMLAH - 5

DIVISI 6

50

PERKERASAN ASPAL

6.1.(1)

Lapis Resap Pengikat - Aspal Cair/Emulsi

Liter

6.1.(2a)

Lapis Perekat - Aspal Cair/Emulsi

Liter

6.3.(8)

Bahan anti pengelupasan

6.5.(1)

Laston Lapis Aus Asbuton (AC-WC Asb)

Ton

6.5.(2)

Laston Lapis Antara Asbuton (AC-BC Asb)

Ton

Kg

JUMLAH - 6

DIVISI 7

STRUKTUR

7.1.(7a)

Beton Struktur fc’20 Mpa

M3

7.3.(1)

Baja Tulangan Polos BjTP 280

Kg

7.3.(2)

Baja Tulangan Sirip BjTP 280

7.6.(1)

Fondasi Cerucuk, Penyedian dan Pemancangan



7.9.(1)

Pasangan Batu

M3

7.10.(3a)

Bronjong dengan kawat yang dilapisi galvanis

M3

DIVISI 8

PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Kg

JUMLAH - 7

8.1.(1)

Cairan Perekat (Epoksi Resin)

8.5.(4b)

Penggantian baut biasa Grade B diameter 2,54 cm

Kg Buah

SKh-2.10.b(8)

Perbaikan Pasangan Batu

M3

142.55

522,753.62

74,518,528.07

8.75

SKh-2.10.b(4)

Pengecatan Elemen Baja

M2

10,518.99

53,620.60

564,034,555.19

66.26

SKh-2.10.b(5)

Pengecatan Elemen Beton

M2

2,151.93

34,893.26

75,087,846.84

8.82

713,640,930.11

83.84

137,576,552.12

16.16

JUMLAH - 8

DIVISI 9. 9.1.(1) 9.1.(2)

0.09 0.09 0.68 0.68 0.09 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.09 0.68 0.09

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.27 2.08 0.28

0.16

0.16 0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

1.020 1.020

1.020 2.041

25

PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN Mandor

Jam

Pekerja Biasa

Jam

Dump Truck 3 - 4 m³

Jam

9.1.(8)

Motor Grader Min. 100 PK

Jam

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

9.1.(16)

Penggilas Roda Karet 8 - 10 Ton

Jam

9.1.(17)

Kompresor 4000 - 6500 Ltr/mnt

Jam

9.2.(1)

Marka Jalan Termoplastik

M2

9.1.(4) a

0.09 0.68 0.09

JUMLAH - 9

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 10.1.(4)

Perbaikan Lapis Pondasi Agregat Kelas A

M3

10.1.(8)

Perbaikan Campuran Aspal Panas

M3

10.1.(22)

Pengendalian Tanaman

M2

SKh-2.10.b(1)

Pembersihan Jembatan

M2

SKh-2.10.a(19)

Pembersihan Drainase



8,826.81

15,586.21

0 JUMLAH - 10 JUMLAH BOBOT RENCANA (%) AKUMULASI RENCANA (%)

137,576,552.12

16.16

851,217,482.23

100.00

85,121,748.22

JUMLAH BOBOT REALISASI (%)

936,339,230.45

AKUMULASI REALISASI (%)

936,339,000.00

1.020 3.061

1.020 4.082

1.020 5.102

1.020 6.122

1.020 7.143

1.020 8.163

1.020 9.184

1.020 10.204

1.020 11.224

1.020 12.245

1.020 13.265

1.020 14.286

1.020 15.306

1.020 16.327

1.020 17.347

1.020 18.367

3.140 21.507

3.140 24.647

3.140 27.786

3.140 30.926

3.140 34.066

3.140 37.206

3.140 40.345

3.140 43.485

3.140 46.625

3.140 49.765

3.140 52.904

3.140 56.044

3.140 59.184

3.140 62.323

3.140 65.463

3.140 68.603

3.140 71.743

3.140 74.882

3.140 78.022

3.140 81.162

3.140 84.301

3.140 87.441

3.140 90.581

DEVIASI

Disetujui Oleh; PPK S-01S KPD-TP Dinas Pekerjaan Umum Prov. Sulawesi Selatan

Diperiksa Oleh; PT. PT. WIRANTA BHUANA RAYA (KSO)

Dibuat Oleh; PT. GENYTOV FAJAR

MUHAMMAD ROSYADI, ST., MT. NIP. 1977082320021003

MUHAMMAD TANGNILLA, ST. Supervision Engineer

IGNASIUS YANIAR DIDIN K., ST. General Superintendent

3.140 93.721

3.140 96.860

3.140 100.000

TIME SCHEDULE PAKET PERUSAHAAN NO. KONTRAK

: PRESERVASI JALAN BTS.KOTA PALOPO - WOTU : PT. GENITOV FAJAR : HK.02.03/PPK S-01/ADD1/APBN/II/2019

RENCANA WAKTU PEKERJAAN

KONTRAK AWAL NO. MATA PEMBAYARAN

U RAIAN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

TOTAL HARGA (Rp.)

BOBOT (%)

1

2

3

4

5

6=4x5

7

DIVISI I 1.2

FEB 2019 26-04

MARET 2019 05-11

12-18

APRIL 2019 19-25

26-01

02-08

09-15

MEI 2019

16-22

23-29

30-06

07-13

14-20

JUNI 2019 21-27

28-03

04-10

11-17

JULI 2019

18-24

25-01

AGUSTUS 2019

16-22

23-29

30-05

06-12

13-19

SEPTEMBER 2019 20-26

27-02

03-09

10-16

17-23

OKTOBER 2019 24-30

01-06

07-13

14-20

NOVEMBER 2019 21-27

28-03

04-10

11-17

18-25

DESEMBER 2019 26-02

03-09

10-16

17-23

KETERANGAN 24-31

100

Mobilisasi

LS

1.00

104,190,000.00

104,190,000.00

0.72

Manajemen dan Keselamatan Lalu Lintas

LS

1.00

18,660,000.00

18,660,000.00

0.13

1.8.(2)

Pengamanan Lingkungan Hidup

0.24 0.00

0.24 0.00

0.239226 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.00 0.00

0.00 0.00

0.00 0.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00

1.17.(1a)

Pengujian PH

Buah

3.00

10,000.00

30,000.00

0.00

1.17.(1b)

Pengujian Oksigen Terlarut (DO)

Buah

3.00

28,000.00

84,000.00

0.00

1.17.(1c)

Pengujian Zat Padat Terlarut (TDS)

Buah

3.00

38,500.00

115,500.00

0.00

1.17.(1d)

Pengujian Zat Padat Tersuspensi (TSS)

Buah

3.00

38,500.00

115,500.00

1.17.(1e)

Pengujian Biological Oxygen Demand (BOD)

Buah

3.00

55,000.00

165,000.00

1.17.(1f)

Pengujian Chemical Oxygen Demand (COD)

Buah

3.00

55,000.00

165,000.00

0.00

1.17.(1g)

Pengujian Coliform

Buah

3.00

127,000.00

381,000.00

0.00

1.17.(1h)

Pengujian Destruksi CU, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn

Buah

3.00

430,000.00

1,290,000.00

0.01

1.17.(1i)

Pengujian Sulfurdioksida (SO2)

Buah

3.00

145,000.00

435,000.00

0.00

0.00 0.00

1.17.(1j)

Pengujian Total Partikulat (TSP) - Debu

Buah

3.00

395,000.00

1,185,000.00

0.01

0.00

1.17.(1k)

Pengujian Timah Hitam (Pb)

3.00

120,000.00

360,000.00

0.00

Keselamatan dan Kesehatan Kerja

LS

1.00

15,445,000.00

15,445,000.00

0.11

0.00 0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00 0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00 0.01

1.21

Manajemen Mutu

LS

1.00

42,500,000.00

42,500,000.00

0.29

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

185,121,000.00

1.28

0.00

0.00

0.00

0.00 0.02

0.02

0.02

0.02

JUMLAH - 1

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00

Buah

1.19

SCEDULE RENCANA

Akhir 31 Desember 2019

75

DRAINASE

2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

37.81

30,099.47

1,138,060.79

0.01

2.2.(1)

Pasangan Batu dengan Mortar

M3

17.07

569,825.64

9,726,923.69

0.07

10,864,984.48

0.07

JUMLAH - 2

DIVISI 3

09-15

UMUM

1.8.(1)

DIVISI 2

02-08

PEKERJAAN TANAH

3.1.(1)

Galian Biasa

M3

1,526.29

37,874.02

57,806,740.49

0.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

3.1.(7)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

216.67

139,730.16

30,275,334.85

0.21

0.00

0.00

0.00 0.00

0.00 0.00

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.07

0.00 0.00

0.00

9,879,307.13

0.00 0.00

0.00

135,129.35

0.00 0.00

0.00

73.11

0.00 0.00

0.00

M3

0.00 0.00

0.00

Galian Perkerasan Beraspal tanpa Cold Milling Machine

0.00 0.00

0.00

3.1.(8) 3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M2

67.81

207,474.09

14,068,818.24

0.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

112,030,200.71

0.77

0.00 0.00

0.00 0.00

0.00 0.00 0.12

0.00 0.00 0.12

0.00 0.00 0.12

0.00 0.00 0.12

0.00 0.00 0.12

0.00 0.00 0.12

0.00 0.00 0.12

0.00 0.00 0.12

0.00 0.00 0.40

0.00 0.00 0.40

0.00 0.00 0.40

0.00 0.00 0.40

0.00 0.00 0.40

0.00 0.00 0.40

0.00 0.00 0.40

0.00 0.00 0.40

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.01 0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00 0.00 0.00 0.00 0.12 0.12

0.02 0.01 0.75 0.58

0.02 0.01 0.75 0.58

0.02 0.01 0.75 0.58

0.02 0.01 0.75 0.58

0.02 0.01 0.75 0.58

0.02 0.01 0.75 0.58

0.02 0.01 0.75 0.58

0.02 0.01 0.75 0.58

0.07 0.04 2.31 2.02

0.07 0.04 2.31 2.02

0.07 0.04 2.31 2.02

0.07 0.04 2.31 2.02

0.07 0.04 2.31 2.02

0.07 0.04 2.31 2.02

0.07 0.04 2.31 2.02

0.07 0.04 2.31 2.02

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.04 0.01

0.04 0.01

0.04 0.01

0.04 0.01

0.04 0.01

0.04 0.01

0.04 0.01

0.04 0.01

0.00 0.00 0.00 0.00 0.02 0.02 0.02 0.02

0.00 0.00 0.07 0.08

0.00 0.00 0.07 0.08

0.00 0.00 0.07 0.08

0.00 0.00 0.07 0.08

0.00 0.00 0.07 0.08

0.00 0.00 0.07 0.08

0.00 0.00 0.07 0.08

0.00 0.00 0.07 0.08

0.00 0.00 0.20 0.08

0.00 0.00 0.20 0.08

0.00 0.00 0.20 0.08

0.00 0.00 0.20 0.08

0.02 0.04 0.23 0.08

0.02 0.04 0.23 0.08

0.02 0.04 0.23 0.08

0.02 0.04 0.23 0.08

0.02 0.04 0.08 0.08

0.02 0.04 0.08 0.08

0.02 0.04 0.08 0.08

0.02 0.04 0.08 0.08

0.00 0.00 0.00 0.00 0.01 0.01 0.04 0.04 0.01 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.01 0.09 0.01

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.00

0.00 0.00 0.07

0.00 0.00 0.07

0.00 0.00 0.07

0.00 0.00 0.07

0.00 0.00 0.07

0.00 0.00 0.07

0.00 0.00 0.07

0.00 0.00 0.07

0.00 0.00 0.25

0.00 0.00 0.25

0.00 0.00 0.25

0.00 0.00 0.25

0.00 0.00 0.25

0.00 0.00 0.25

0.00 0.00 0.25

0.00 0.00 0.25

0.00 0.00

0.00 0.00 0.13 0.13 0.03 0.03 0.01 0.01 0.01 0.01

0.00 0.25 0.03 0.01 0.01

0.00 0.25 0.03 0.01 0.01

0.00 0.25 0.03 0.01 0.01

0.00 0.25 0.03 0.01 0.01

0.00 0.25 0.03 0.01 0.01

0.00 0.25 0.03 0.01 0.01

0.00 0.25 0.03 0.01 0.01

0.00 0.25 0.03 0.01 0.01

0.00 0.54 0.03 0.01 0.01

0.00 0.54 0.03 0.01 0.01

0.00 0.54 0.03 0.01 0.01

0.00 0.54 0.03 0.01 0.01

0.00 0.54 0.03 0.04 0.01

0.00 0.54 0.03 0.04 0.01

0.00 0.54 0.03 0.04 0.01

0.00 0.54 0.03 0.04 0.01

JUMLAH - 3

DIVISI 4

PELEBARAN PERKERASAN DAN BAHU JALAN

DIVISI 5

PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN

JUMLAH - 4

5.1.(1)

Lapis Pondasi Agregat Kelas A

M3

154.50

444,605.86

68,691,605.80

0.47

5.1.(2)

Lapis Pondasi Agregat Kelas B

M3

88.40

377,354.28

33,358,118.06

0.23

5.1.(3)

Lapis Pondasi Agregat Kelas S

M3

1,827.47

329,044.67

601,319,255.11

4.14

703,368,978.96

4.84

10,886,300.14

0.07

JUMLAH - 5

DIVISI 6 6.1.(1)

Lapis Resap Pengikat - Aspal Cair/Emulsi

Liter

801.21

6.1.(2a)

Lapis Perekat - Aspal Cair/Emulsi

Liter

9,743.04

6.3.(8)

Bahan anti pengelupasan

Kg

771.08

93,500.00

72,095,980.00

0.50

6.5.(1)

Laston Lapis Aus Asbuton (AC-WC Asb)

Ton

3,964.58

1,254,525.10

4,973,665,121.24

34.26

6.5.(2)

Laston Lapis Antara Asbuton (AC-BC Asb)

13,587.32

Ton

2,536.44

1,188,713.95

3,015,101,615.16

20.77

8,204,033,719.19

56.51

13,577.35

JUMLAH - 6

132,284,702.65

0.91

DIVISI 7

STRUKTUR

7.1.(7a)

Beton Struktur fc’20 Mpa

M3

44.14

1,254,534.94

55,375,172.44

0.38

7.3.(1)

Baja Tulangan Polos BjTP 280

Kg

967.30

13,794.00

13,342,936.20

0.09

7.3.(2)

Baja Tulangan Sirip BjTP 280

Kg

1,514.88

15,202.00

23,029,205.76

0.16

7.6.(1)

Fondasi Cerucuk, Penyedian dan Pemancangan



3,119.37

16,289.43

50,812,754.80

0.35

7.9.(1)

Pasangan Batu

M3

996.58

522,753.62

520,965,799.41

3.59

7.10.(3a)

Bronjong dengan kawat yang dilapisi galvanis

M3

617.00

385,903.57

238,102,503.57

1.64

901,628,372.18

6.21

DIVISI 8

PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

JUMLAH - 7

655,215.00

0.00

Buah

40.00

21,195.63

847,825.17

0.01

SKh-2.10.b(8)

8.1.(1)

Cairan Perekat (Epoksi Resin)

8.5.(4b)

Penggantian baut biasa Grade B diameter 2,54 cm Perbaikan Pasangan Batu

M3

142.55

522,753.62

74,518,528.07

0.51

SKh-2.10.b(4)

Pengecatan Elemen Baja

M2

10,518.99

53,620.60

564,034,555.19

3.89

SKh-2.10.b(5)

Pengecatan Elemen Beton

M2

2,151.93

34,893.26

75,087,846.84

0.52

Kg

6.27

104,500.00

715,143,970.28

4.93

JUMLAH - 8

DIVISI 9. 9.1.(1)

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.01 0.00 0.37

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.00 0.00 0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.01 0.09 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.01

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.39 0.10 0.06 0.02

0.00 0.39 0.10 0.06 0.02

0.00 0.39 0.10 0.06 0.02

0.00 0.39 0.10 0.06 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

0.00 0.39 0.10 0.03 0.02

25

PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN Jam

821.00

20,714.29

17,006,428.57

0.12

Pekerja Biasa

Jam

821.00

15,714.29

12,901,428.57

0.09

Dump Truck 3 - 4 m³

Jam

62.60

249,700.00

15,631,220.00

0.11

9.1.(8)

162.50

324,500.00

52,731,250.00

0.36

8.00

250,800.00

2,006,400.00

0.01

9.1.(2) 9.1.(4) a

50

PERKERASAN ASPAL

Mandor

Motor Grader Min. 100 PK

Jam

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

9.1.(16)

Penggilas Roda Karet 8 - 10 Ton

Jam

9.1.(17)

Kompresor 4000 - 6500 Ltr/mnt

Jam

8.00

165,000.00

1,320,000.00

0.01

9.2.(1)

Marka Jalan Termoplastik

M2

2,382.60

157,048.57

374,183,926.29

2.58

475,780,653.43

3.28

JUMLAH - 9

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 10.1.(4)

Perbaikan Lapis Pondasi Agregat Kelas A

M3

48.87

444,605.86

21,727,888.51

0.15

10.1.(8)

Perbaikan Campuran Aspal Panas

M3

991.65

2,445,805.34

2,425,382,862.84

16.71

10.1.(22)

Pengendalian Tanaman

M2

1,027,328.53

463.96

476,643,747.62

3.28

SKh-2.10.b(1)

Pembersihan Jembatan

M2

11,078.14

15,586.21

172,666,263.93

1.19

SKh-2.10.a(19)

Pembersihan Drainase



16,816.80

6,735.93

113,276,763.60

0.78

3,209,697,526.49

22.11

14,517,669,405.72

100.00

0 JUMLAH - 10 JUMLAH BOBOT RENCANA (%) AKUMULASI RENCANA (%)

1,451,766,940.57

JUMLAH BOBOT REALISASI (%)

15,969,436,346.29

AKUMULASI REALISASI (%)

15,969,436,000.00

0.669

0.669

2.194

2.184

2.184

2.184

2.199

2.199

2.199

2.199

6.173

6.164

6.164

6.164

6.357

6.357

6.357

6.367

1.445

1.445

1.445

1.445

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.136

1.376

0.669

1.338

3.319

5.715

7.899

10.083

12.282

14.480

16.679

18.877

25.051

31.214

37.378

43.541

49.898

56.255

62.612

68.979

70.424

71.869

73.315

74.760

75.896

77.033

78.169

79.305

80.442

81.578

82.715

83.851

84.987

86.124

87.260

88.397

89.533

90.670

91.806

92.942

94.079

95.215

96.352

97.488

98.624

100.000

DEVIASI

Disetujui Oleh; PPK S-01S KPD-TP Dinas Pekerjaan Umum Prov. Sulawesi Selatan

Diperiksa Oleh; PT. PT. WIRANTA BHUANA RAYA (KSO)

Dibuat Oleh; PT. GENYTOV FAJAR

MUHAMMAD ROSYADI, ST., MT. NIP. 1977082320021003

MUHAMMAD TANGNILLA, ST. Supervision Engineer

IGNASIUS YANIAR DIDIN K., ST. General Superintendent

JADWA Satker

: PJN Metro Makassar

PPK

: PPK 02 Metropolitan Makassar I

PAKET

: PRESERVASI JALAN BTS.KOTA PALOPO - WOTU

PERUSAHAAN

: PT. GENITOV FAJAR

NO. KONTRAK

: HK.02.03/PPK S-01/ADD1/APBN/II/2019

Nilai Kontrak

:

Penyedia

: PT. Genytov Fajar

Konsultan Supervisi

: PT. Astakona Duta Sarana Dimensi

No.

Rp

JENIS

PENERIMAAN (KAS MASUK) 1 Pembayaran Uang Muka 2 Sertifikat No. 1 3 Sertifikat No. 2 4 Sertifikat No. 3 5 Sertifikat No. 4 6 Sertifikat No. 5 7 Sertifikat No. 6 8 Sertifikat No. 7 9 Sertifikat No. 8 10 Sertifikat No. 9 11 Sertifikat No. 10 JUMLAH KAS MASUK JUMLAH KUMULATIF PENGELUARAN KAS 1 BAHAN 2 PERALATAN 3 TENAGA KERJA JUMLAH PENGELUARAN JUMLAH KUMULATIF BALANCE ALIRAN KAS

15,969,436,000.00

FEBRUARI Rp

MARET

APRIL

MEI

JUNI

3,193,887,200.00 Rp

1,009,167,621.06 Rp

1,121,620,458.55 Rp

3,431,853,472.35 Rp

3,249,795,748.05

Rp Rp

3,193,887,200.00 Rp 3,193,887,200.00 Rp

1,009,167,621.06 Rp 4,203,054,821.06 Rp

1,121,620,458.55 Rp 5,324,675,279.61 Rp

3,431,853,472.35 Rp 8,756,528,751.96 Rp

3,249,795,748.05 12,006,324,500.01

Rp Rp Rp Rp Rp Rp

1,437,249,240.00 1,277,554,880.00 479,083,080.00 3,193,887,200.00 3,193,887,200.00 -

454,125,429.47 403,667,048.42 151,375,143.16 1,009,167,621.06 4,203,054,821.06 -

504,729,206.35 448,648,183.42 168,243,068.78 1,121,620,458.55 5,324,675,279.61 -

1,544,334,062.56 1,372,741,388.94 514,778,020.85 3,431,853,472.35 8,756,528,751.96 -

1,462,408,086.62 1,299,918,299.22 487,469,362.21 3,249,795,748.05 12,006,324,500.01 -

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp

Lampiran B.6

JADWAL ARUS KAS

TAHUN 2018 JULI

Rp

AGUSTUS

SEPTEMBER

OKTOBER

NOVEMBER

738,542,959.29 Rp

725,910,486.67 Rp

580,728,389.34 Rp

725,910,486.67 Rp

580,728,389.34

Rp Rp

738,542,959.29 Rp 12,744,867,459.30 Rp

725,910,486.67 Rp 13,470,777,945.98 Rp

580,728,389.34 Rp 14,051,506,335.31 Rp

725,910,486.67 Rp 14,777,416,821.99 Rp

580,728,389.34 15,358,145,211.32

Rp Rp Rp Rp Rp Rp

332,344,331.68 295,417,183.72 110,781,443.89 738,542,959.29 12,744,867,459.30 -

326,659,719.00 290,364,194.67 108,886,573.00 725,910,486.67 13,470,777,945.98 -

261,327,775.20 232,291,355.74 87,109,258.40 580,728,389.34 14,051,506,335.31 -

326,659,719.00 290,364,194.67 108,886,573.00 725,910,486.67 14,777,416,821.99 -

261,327,775.20 232,291,355.74 87,109,258.40 580,728,389.34 15,358,145,211.32 -

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp

KONTRAKTOR PELAKSANA PT. GENYTOV FAJAR

HENDRIKUS ARNOLDUS DIREKTUR

Lampiran B.6

DESEMBER

611,290,788.68 Rp Rp

611,290,788.68 15,969,436,000.00

Rp Rp Rp Rp Rp Rp

275,080,854.90 244,516,315.47 91,693,618.30 611,290,788.68 15,969,436,000.00 -

KET.

5.819 3.174 1.587 10.58

9.747 8.664 3.249 21.66

12.4444350055 29.3018357178 42.6946131872 61.439128153 78.4013479663 91.9128077957 97.8655142879 100

12.4444350055 16.8574007123 13.3927774694 18.7445149658 16.9622198133 13.5114598294 5.9527064922 2.1344857121 100

Rp16,000,000,000.00

Rp

15,969,436,000.00

7.272 6.464 2.424 16.16

Rp14,000,000,000.00

23 14

Rp12,000,000,000.00

Rp10,000,000,000.00

Rp8,000,000,000.00

378,994,589.05 686,370,694.47

866,265,876.74 649,959,149.61

Rp6,000,000,000.00

Rp4,000,000,000.00

Rp2,000,000,000.00

Rp-

Februari 2019

Maret 2019

April 2019

Mei 2019

Juni 2019

Juni 2019

11.4 12.825 4.275 28.50

7.696 8.658 2.886 19.24

1.544 1.737 0.579 3.86

612,296,559.41 147,708,591.86

852,839,368.44 145,182,097.33

1,052,767,955.82 116,145,677.87

Juli 2019

Agustus 2019

September 2019

1,082,265,628.30 145,182,097.33

Oktober 2019

714,846,359.57 116,145,677.87

November 2019

100

2,006,693,986.34 (997,526,365.29)

November 2019

Desember 2019

Rp16,000,000,000.00

Rp14,000,000,000.00

Rp12,000,000,000.00

Rp10,000,000,000.00

Rp8,000,000,000.00

Rp6,000,000,000.00

Rp4,000,000,000.00

Rp2,000,000,000.00

Rp-

Februari 2019

Maret 2019

April 2019

Mei 2019

Juni 2019

Juni 2019

Juli 2019

Agustus 2019

September 2019

Oktober 2019

November 2019

November 2019

Desember 2019

NO

POSISI

1 ASPHALT MIXING PLANT

JUMLAH

SCHEDULE ACTUAL

1.00 Schedule

2 ASPHALT MIXING PLANT

2.00

3 ASPHALT SPRAYER

2.00

4 BULLDOZER 100-150 HP

1.00

5 COMPRESSOR 4000-6500 L\M

1.00

6 CONCRETE MIXER 0.3-0.6 M3

1.00

7 CRANE 10-15 TON

1.00

8 DUMP TRUCK 3 - 5 TON

6.00

9 DUMP TRUCK 10 TON

3.00

10 EXCAVATOR 80-140 HP

1.00

11 FLAT BED TRUCK 3-4 M3

1.00

12 GENERATOR SET

1.00

13 MOTOR GRADER >100 HP

1.00

14 TRACK LOADER 75-100 HP

1.00

15 WHEEL LOADER 1.0-1.6 M3

2.00

16 THREE WHEEL ROLLER 6-8 T

1.00

17 TANDEM ROLLER 6-8 T

2.00

18 TIRE ROLLER 8-10 T.

2.00

Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual

Februari

Maret

April

Mei

19 VIBRATORY ROLLER 5-8 T

1.00 Schedule

20 WATER PUMP 70-100 mm

2.00

21 WATER TANKER 3000-4500 L

1.00

22 PEDESTRIAN ROLLER

1.00

23 JACK HAMMER

1.00

24 CONCRETE PUMP

1.00

25 TRAILER 20 TON

1.00

26 CRANE ON TRACK 35 TON

1.00

27 WELDING SET

1.00

28 ASPHALT LIQUID MIXER

1.00

29 TRONTON

1.00

30 COLD MILLING MACHINE

1.00

31 ROCK DRILL BREAKER

1.00

32 ASPHALT DISTRIBUTOR

1.00

33 SLIP FORM PAVER

1.00

34 CONCRETE PAN MIXER

2.00

35 CONCRETE BREAKER

1.00

36 CONDRETE MIXER (350)

4.00

37 TRUK MIXER (AGITATOR)

5.00

Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual Schedule Actual

38 MECHANICAL FEEDER (30 Ton/Jam)