Method of statement for sanitary system Site Address/Location: Installation of sanitary system 1. S, W, V systems a. Under ground pipe must be PVC class 13.5 b.
The ground joist pipe must be PVC class 8.5
c. To installing S,W,V
pipe (Horizontal) must be 1:
100 slope level d.
The extended pipe which stretches out the building must connect with the flexible connection.
e.
To run the pipe through the wall or floor: must run through pipe sleeve. Also pipe sleeve must minimum 1” bigger than pipe size.
f. After complete installation must do the leakage testing follow the testing regulation. g. Marking symbol follow the regulation. b) Cold Water Supply System a. Under ground pipe must be HDPE PN.6.3 b.
The ground joist pipe must be GSP
c.
To run the pipe through the wall or floor: must run through pipe sleeve. Also pipe sleeve must minimum 1” bigger than pipe size.
d. After complete installation must do the leakage testing follow the testing regulation. e. Marking symbol follow the regulation.