XXXXX XXXXXXX BOARD GANTT CHART AS OF X/XX/XX TASK NAME 1. Definition of the Scope/Request for Qual Run Customer Documents/Specs Quotation P.O. Documents requested from Customer: Gerber File PCB Panelization
JUNE '0X JULY '0X 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4
AUG. '0X 16 17 18 19 20
START
FINISH
A/R
15-Jun
15-Jun
X. XXX XXXX
DONE DONE
-
-
-
DONE DONE
Mechanical Drawing
-
-
-
DONE
BOM with AVL Component Diagram
-
-
-
DONE DONE
Packaging Procedure/Specs
-
-
-
DONE
Final Assy Specs Workmanship Standard Endorsement of Docs to BU or PMG 2. Feasibility/Preparation Stage Generate Internal Specs Source Docs Internal BOM Component Diagram Process Sheet (SMT) Process Sheet (B / E) Feeder Checklist Process Flow Chart Control Plan
-
-
-
DONE DONE DONE
17-Jun 17-Jun 17-Jun 17-Jun 17-Jun 17-Jun 17-Jun
25-Jun 25-Jun 25-Jun 25-Jun 25-Jun 25-Jun 25-Jun
X. XXX X. XXXXXX X. XXXXXX X. XXX X. XXXXXXXX X. XXX X. XXX
DONE OPEN OPEN OPEN
17-Jun
25-Jun
X. XXX
DONE
Submission of above docs to DCC
26-Jun
26-Jun
Release of DCC CONSIGNED MATERIALS Material Delivery Quantity Verification IQA Endorsement to SMT Store JIGS FABRICATION AND BUY-OFF DFM Stencil DFM P.I. Customer N.R.E. P.O. P.I. / Approval Fabrication Stencils (Top & Bottom) Pallet Soldering Jig Cleaning Basket Baseplate Arrival Buy-off MACHINE ACTIVITIES Programming Set-up/Temp Profiling 4. QUAL RUN SMT build Back end build. Buy-off Shipment
26-Jun
1-Jul
16-Aug 16-Aug 18-Aug 20-Aug
16-Aug 17-Aug 20-Aug 20-Aug
XXXXX X. XXXXXXXXX X. XXXXXXX X. XXXXXXXXX
OPEN OPEN
17-Jun
23-Jun
X. XXXXXXXX
DONE
15-Jun 15-Jun
15-Jun 16-Jun
X. XXX XXXX X. XXXXXXXX
DONE DONE
Initially rec'd e-mail confirmation.
24-Jun 17-Jun 17-Jun 17-Jun 17-Jun 1-Jul 1-Jul
30-Jun 30-Jun 30-Jun 24-Jun 24-Jun 1-Jul 2-Jul
X. XXXXXX X. XXXXXX X. XXXXXX X. XXXXXX X. XXXXXX Vendor X. XXXXXX
OPEN OPEN OPEN OPEN OPEN OPEN OPEN
P.I. generated 6/16. P.I. generated 6/15. P.I. generated 6/15.
26-Jun 26-Jun
26-Jun 26-Jun
X. XXXXXXXX X. XXXXXXXX
OPEN OPEN
X. XXXXXXX X. XXXXX APQP Team X. XXXXXXXX
OPEN OPEN OPEN OPEN
Packaging Procedure
X. XXX / X. XXXXXXXX X. XXXXXXX
STATUS
REMARKS
Initially rec'd e-mail confirmation.
Document available. None available, Gerber file to be used.
Standard bubble wrap packing to be used. IPC Class 3 Standard to be used. IPC Class 3 Standard to be used.
OPEN OPEN OPEN Standard bubble wrap packing to be used.
OPEN OPEN
P.I. generated 6/16.
Line 4 to be used.
XXXXX XXXXX XXXXXX BOARD GANTT CHART AS OF X/XX/XX TASK NAME 1. Definition of the Scope/Request for Qual Run Customer Documents/Specs Quotation P.O. Documents requested from Customer: Gerber File PCB Panelization
START
FINISH
A/R
STATUS
15-Jun
15-Jun
X. XXX XXX
DONE DONE
-
-
-
DONE DONE
Mechanical Drawing
-
-
-
DONE
BOM with AVL Component Diagram
-
-
-
DONE DONE
Packaging Procedure/Specs
-
-
-
DONE
Final Assy Specs Workmanship Standard Endorsement of Docs to BU or PMG List of Jigs/Fixt./Equip. for SMT & B/E 2. Feasibility/Preparation Stage Generate Internal Specs Source Docs Internal BOM Component Diagram Process Sheet (SMT) Process Sheet (B / E) Feeder Checklist Process Control Plan Packaging Procedure
18-Aug
20-Aug
Prod. Eng'g
DONE DONE DONE DONE
17-Jun 16-Aug 16-Aug 16-Aug 16-Aug 17-Jun 17-Jun
25-Jun 23-Aug 23-Aug 23-Aug 23-Aug 25-Jun 25-Jun
DONE OPEN OPEN OPEN OPEN OPEN DONE DONE
24-Aug
24-Aug
X. XXX X. XXXXXX X. XXXXXX X. XXX X. XXXXXXXX X. XXX X. XXX X. XXX / X. XXXXXXXX
16-Aug 17-Aug 19-Aug 23-Aug 24-Aug
16-Aug XXXXX 18-Aug X. XXXXXXXXX 21-Aug X. XXXXXXX 23-Aug X. XXXXXXXXX 24-Aug X. XXXXXXXXX
DONE OPEN OPEN OPEN OPEN
15-Jun 15-Jun 16-Aug 17-Aug
15-Jun X. XXX XXX 16-Jun X. XXXXXXXXX 16-Aug X. XXXXXXXXX 17-Aug X. XXXXXXXXX
DONE DONE DONE DONE
17-Jun 16-Aug
23-Jun 18-Aug
X. XXXXXXXX X. XXXXXX
DONE OPEN
24-Jun TBD 17-Jun TBD 17-Jun TBD 16-Aug 23-Aug 16-Aug 23-Aug
30-Jun TBD 30-Jun TBD 30-Jun TBD 23-Aug 24-Aug 23-Aug 24-Aug
Vendor X. XXXXXX Vendor X. XXXXXX Vendor X. XXXXXX Vendor X. XXXXXX Vendor X. XXXXXX Vendor X. XXXXXX
DONE OPEN DONE OPEN DONE OPEN OPEN OPEN OPEN OPEN OPEN OPEN
19-Aug 19-Aug
21-Aug X. XXXXXXXXX 21-Aug X. XXXXXXXXX
OPEN OPEN
X. XXXXXXX X. XXXXX APQP Team X. XXXXX APQP Team X. XXXXXXXXX
OPEN OPEN OPEN OPEN OPEN OPEN
DCC documentation CONSIGNED MATERIALS Material Delivery Quantity Verification IQA Endorsement to SMT Store Kitting FINANCE DOCUMENTATION Customer N.R.E. P.O. P.I. / Approval Generate P.I. for Router Jigs Approval DESIGN Stencil DFM Router Jig Design MECHANICAL FABRICATION Stencil (Top & Bottom) Fab. & Del. F/A Buy Off Pallet Fab. & Del. F/A Buy Off Soldering Jig Fab. & Del. F/A Buy Off Cleaning Basket Fab. & Del. F/A Buy Off Baseplate Fab. & Del. F/A Buy Off Router Jig Fab. & Del. F/A Buy Off BUILD SCHEDULING SMT Line Reservation B/E Line Reseration SMT QUALIFICATION BUILD Programming & Setup Qualification Run & Value Reading Buy Off B/E Build Buy Off Delivery
OPEN
AUGUST '0X 16 17 18 19 20 21 22 23 24 25 26 27 28 28 29 30 31
1
2
3
SEPT. '0X 4 5 6
7
8
9
REMARKS
Initially rec'd e-mail confirmation.
Document available. None available, Gerber file to be used.
Standard bubble wrap packing to be used. IPC Class 3 Standard to be used. IPC Class 3 Standard to be used.
Standard bubble wrap packing to be used. Delivered 8/20.
P.I. generated 6/16. P.I. generated 6/15. P.I. generated 6/15.
P.I. generated 6/16.
Line 4 to be used.