RUNNING ACCOUNT BILL 1
Division
RE Works, Chhattisgarh Sub-Division : Site Office Durg
2
Name of Work
Rulal Electrcification work of Durg Dist.
3
Name of Contactor
M/s R.P.G. Transmission Ltd. Jabalpur
4
Serial No. of Bill
5
Reference to Contract Agreement No.
1st Running Bill NH/CONT.(E&M)-III/RE-22/PR-269/705/07/I dt 16.05.2007 NH/CONT.(E&M)-III/RE-22/PR-269/706/07/II dt 16.05.2007
6
Date of Commencement of work
7
Date of Completion of work
8
Date of MB Entry
9
MB No. & Page No.
10
Nature of Bill
S. No Contract S. No.
23/03/2007 Under Progress
Ex-works price of Supply items
Description of item/ Works
Unit
Quantity
Rate in Rs.
Amount(Rs) Since Prv.
Upto Date
1
A/3
AAAC equivalent to ACSR Rabbit conductoras per TS
KM
102
32563.84
-
3321479.12
2 3
A/4 A/6
AAAC equivalent to ACSR Weasel conductor as per TS 11 KV Disc insulator with tension or suspension fittings as required alongwith requisite clamps & hardwares as per TS
KM
2015.23
20529.56
-
41371867.32
Nos
8000
418.21
-
3345680
4
A/7
11 KV Pin insulator with pin & all requisite hardware as per TS
Nos
24984
115.8
-
2893147.2
5
A/8
Guy sets having following component as per TS (Galvanised) (a)Stay plates (b)Stay Rod
(c) Turn Buckle (d) Guy
Wire (7/10 SWG)
Sets
2500
878.53
-
2196325
Sets
3500
725.41
-
2538935
6
A/9
(e) Guy Insulator (Type-C) (f) Stay Clamp Pipe earthing as per TS
7
A/10
Coil earthing as per TS
Nos
3000
140.68
-
422040
8
A/16
Anticlimbing barbed wires
MT
31.99
55143.3
-
1764034.17
9 10
B/11 D-I.10
Nut & Bolts and other items as required to complete the work PVC Insulated PVC Sheathed 2X 25 Sq mm Al cable alongwith cable terminals as required
Kg
1000
76.56
-
76560
Mtr
8028
50.73
-
407260.44
11
D-II. 10
PVC Insulated PVC Sheathed 3.5 core 25 Sq mm Al cable alongwith cable terminals as required
Mtr
3957
104.32
-
412794.24
Nos
4820
1551.3
-
7477266
Nos
6000
85.18
-
511080
Nos
2000
878.53
-
1757060
Nos
5500
311.99
-
1715945
Mtr
399935
8.61
-
3443440.35
12
E/1
PSC Pole (8 m, 140 Kg ) with base plate as per TS
13
E/2
Shackle Insulator with clamps
14
E/4
Guy sets having following component as per TS (Galvanized) (a)Stay plates Buckle
15
E/5
16
F/1
(b)Stay Rod (c) Turn (d) Guy Wire (7/12 SWG)
(e) Guy Insulator (Type-A) GI Earth spike (f) Stay Clamp 2-Core 2.5 sq. mm aluminium conductor PVC insulated weather proof cable as per TS Total Less deduction @15% as Cl No 8.1(II) of SCC Total Amount Payble (85%)
73654913.83 11048237.07 62606676.76
Certified that:1
The materials have been received in Full and good condition as per the terms and condition of the Contract Agreement.
2
The material received has been taken in stock register no 1,2 & 3.
3
As per the clause no 15 of SCC, all received materials have been handed over to M/s RPG Ltd. for the purpose of performance of the contract-II / Erection portion of the Contract against Indemnity Bond.
4 5
Bill verified for Rs ______________________ As per the clause no 8.1 (ii) of SCC, 85% of the total amount of the items supplied i.e Rs _________________________________________________________________________________may be passed for payment.
J.E (Elect.)
J.E (Mech.)
J.E (Elect.)
Durg
Balod
Bemetara
AM (E) Site Office Durg
Bill passed for Rs ______________________
DM (E) RE Office Raipur
Check Measurement
S. No.
1
Measurement to be checked
S. No. 1 to 16
% of Check
Condition of the check
Signature of the concerned Officer
100% ( For Durg section as per Stock Register No. 1)
2
S. No. 1 to 16
3
2) S. No. 1 to 16
4
No. 3) S. No. 1 to 16
5
( For Balod section as per Stock Register No. ( For Bemetera section as per Stock Register
100% 100% 50%
( For Stock Register No. 1,2 & 3)
S. No. 1 to 16
50% ( For Stock Register No. 1,2 & 3)
6
S. No. 1 to 16
( For Stock Register No. 1,2 & 3)
10%
Certified that:1 2
Bill verified for Rs ______________________ As per the clause no 8.1 (ii) of SCC, 85% of the total amount of the items supplied i.e Rs _________________________________________________________________________________may be passed for payment.
J.E (Elect.)
J.E (Mech.)
J.E (Elect.)
Durg
Balod
Bemetara
AM (E) Site Office Durg
Bill passed for Rs ______________________ DM (E) RE Office Raipur
Remarks
CE (E)
RUNNING ACCOUNT BILL Division
RE Works, Chhattisgarh Sub-Division : Site Office Durg
Name of Work
Rulal Electrcification work of Durg Dist.
Name of Contactor
M/s R.P.G. Transmission Ltd. Jabalpur
Serial No. of Bill
1st Running Bill NH/CONT.(E&M)-III/RE-22/PR-269/705/07/I,II&III dated 16.05.2007
Reference to Contract Agreement No. Date of Commence of work
23/03/2007
Date of completion of work
Under Progress
Date of MB Entry
19/10/2007
MB No. & Page No. Nature of Bill S.No.
Ex-works price of Supply items Description of item/ Works
Unit
E1
PSC Pole (8 m, 140 Kg ) with base plate as per TS
A3 A4
AAAC equivalent to ACSR Rabbit conductoras per TS AAAC equivalent to ACSR Weasel conductor as per TS
E4
Guy sets having following component as per TS (Galvanized) (a)Stay plates (b)Stay Rod
(c) Turn Buckle
(d) Guy Wire (7/12 SWG) (e) Guy Insulator (Type-A) (f) Stay Clamp
Quantity
Rate (Rs)
Amount(Rs) Since Prv.
Upto Date
Nos
5323
1551.3
____
8257569.9
KM
101.99
32563.84
____
3321186.04
KM
2015.23
20529.56
____
41371867.32
Nos
2500
878.53
____
2196325
A8
Guy sets having following component as per TS (Galvanised) (a)Stay plates (b)Stay Rod
Sets
2000
878.53
____
1757060
Sets Nos Nos
3500 3000 5500
725.41 140.68 311.99
____ ____ ____
2538935 422040 1715945
MT
1
75755.18
____
75755.18
Mtr
399935
8.61
____
3443440.35
Mtr
8028
50.73
____
407260.44
Mtr
3957
104.32
____
412794.24
MT
31.99
55143.3
____
1764034.17 67684212.64 57531580.74
(c) Turn Buckle
(d) Guy Wire (7/10 Pipe earthing as per TS SWG) Coil earthing as per TS (e) Guy Insulator (Type-C) GI Earth spike (f) Stay Clamp Nut & Bolts and other items as required to complete the work F1 2-Core 2.5 sq. mm aluminium conductor PVC insulated weather proof cable as per TS D-1.10 PVC Insulated PVC Sheathed 2X 25 Sq mm Al cable alongwith cable terminals as required D-II. 10 PVC Insulated PVC Sheathed 3.5 core 25 Sq mm Al cable alongwith cable terminals as required A16 Anticlimbing barbed wires Total 85% of the Total Amount B7 C6 E1
Certified that:1
The materials have been received in Full and good condition as per the terms and condition of the Contract Agreement.
2
The material received has been taken in stock register no 1,2 & 3.
3
All received materials have been handed over to M/s RPG Ltd. for the purpose of performance of the contract / Erection portion of the Contract against Indemnity Bond.
4
Bill verified for Rs ______________________
5
As per the clause no 8.1 (ii) of SCC, 85% of the total amount of the items supplied i.e Rs _________________________________________________________________________________may be passed for payment.
J.E(Elect.) Durg
J.E(Elect.) Bemetara
J.E(Mech.) Balod
Hardware Material Inspection under level C of contract document Store Date of Inspection S.No
Description of item 1 U Clamp Guy sets having following component as per TS (Galvanized)
(a)Stay plates (b)Stay Rod 2 (c) Turn Buckle 3 Pipe earthing as per TS 4 Coil earthing as per TS 5 GI Earth spike
Nut & Bolts of sizes 6x75, 16x75, 16x250 mm
6 16x65, 16x150, 7 11 Kv pin
Qty
Sub-Vendor
Nature of checking
Remarks
Check Measurement
S.No
Measurement to be checked
1
S No. 1 to 16 ( For Durg section as per stock Register)
2
S No. 1 to 16 ( For Balod section as per stock Register) S No. 1 to 16 ( For Bemetara section as per stock Register) S No. 1 to 16 ( For All section as per stock Register) S No. 1 to 16 ( For All section as per stock Register) S No. 1 to 16 ( For All section as per stock Register)
3 4 5 6
Signature of the % of check Condition of the check concerned official/Officer
Remarks