Rtl Reference

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Rtl Reference as PDF for free.

More details

  • Words: 245
  • Pages: 1
RocheThiess Linfox Joint Venture

A.B.N. 500S9719317 A.C.N.004 142223 A.C.N.01022146 A.C.N.053 4441U

RTL To ltlhom it

PO Box 1236 Monrell Vic 3840 Australia Telephone (03) 5136 1000 Facsimile (03) 5133 0496

Hay Concern:

Roche Thiess Linfox has been using Banlaw PipeJ-ine refuelling systens and oil dispensing couplings since December n-999. $i-nce convertinq our mining mechines and operations across the board tc Banlaw products we have experienced considerably less usage of parts due to failure from normal everyday mining conditions. I{e are extremely happy with the al-l Banlaw systems as they last longrer in the field than the brand we used previously. parts (AUS23) and refuelling Most notahle are the F\rel Receivers nazales {BAM800M}. Since changing to Banlaw fuel receivers we have never had to replace a single receiver due to fuel leaks ar equipment failure untike the previous brand, which are manufactured from an aluminiu.m srateriai. Ile have over 1"80 machines spread across three sites and all- require refuelling twice a day. The BanLaar refueLL ing nozzles are afl serviced every six months as part of our continuous pl-an and as part envirorrnentaliryroveuent. of Banlar*'s preventative program. tsfe send our nozzles back to maintenance Banlaw for servicing. tlhen they come back to si-te they teave standard 3 month warranty. l{e view Banlar., Pipeline as a specialist Carbons l{anagement and have no hesitatic,n is experiencing problens with refuelling components. RqaTdSPETERM{ACHLAN (Mafutemrce Supervisod

fn"&-

cosq>any in the area cf Hydrorecoilmending tlrem to anyone systesn and oil dispensing

who

Related Documents

Rtl Reference
November 2019 24
Rtl
May 2020 22
Rtl
August 2019 35
Rtl Verilog
May 2020 29
Rtl Mmd.xlsx
June 2020 20
Rtl Elpa.docx
May 2020 17