Risk Assessment

  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Risk Assessment as PDF for free.

More details

  • Words: 198
  • Pages: 2
Risk Assessment

Project Title: Take A Break With Billy (Radio Show) Premises to be used: Radio Studio, Neale-Wade Academy, Wimblington Road, March, Cambs, PE15 9PX

Assessment Date: 13th March 2019 Assessor: Billy Griffiths

Activity

Possible Risk Trips

Risk Rating Frequency Severity 3 3

Wires

Possible Solutions Total 6

Uneven Carpet Tiles

Trips and Slips

2

2

4

Tables

Trips

2

2

4

Water Spillages

Electrocution

1

1

2

Reduction by making everyone aware of the wires and making sure that wires have some sort of hazard tape over them. This is only precautionary as there are currently no uneven carpet tiles. Reduced by knowing that they are there No drink or food allowed into the radio studio

Proposed Filming in or on privately owned or occupied premises or land Site Details

Parts of site to be used

Personnel Details Description Producer Site Manager Gaffer Electrician Security Officer Emergency Procedures

Forename Billy Neale-Wade Academy Billy N/A N/A Mr B

Neale-Wade Academy Wimblington Road March Cambs PE15 9PX Radio Studio located on the first floor next to rooms 119 and 120

Surname Griffiths Griffiths N/A N/A Sheppard (Head of Media Studies)

Contact [email protected] [email protected] [email protected] N/A N/A 01354 606000 [email protected]

Related Documents

Risk Assessment
April 2020 43
Risk Assessment
November 2019 56
Risk Assessment
April 2020 40
Risk Assessment
July 2020 20
Risk Assessment
May 2020 33
Risk Assessment
November 2019 49