REQUISITION FOR FIRE ALARM SYSTEM

A

Issued for Internal Review

REV

DESCRIPTION

BY

CHKD

REVISIONS CLIENT

: PT Bukit Asam

PROJECT :

Coal Handling Facility – Mutiara Tiga Besar Utara Barat Tahap 1

JOB NO.

: -

DOC NO.

: -

APVD

DATE

Date

: 18 Aug 2009

REQUISITION

Doc. No.

FIRE ALARM SYSTEM Rev

: A

Page

2 of 8

TABLE OF CONTENTS

1.

GENERAL ..................................................................................................................... 3

2.

REFERENCE DOCUMENTS......................................................................................... 3

3.

EQUIPMENTS TO BE SUPPLIED ................................................................................ 3

4.

VENDOR SCOPE OF WORK........................................................................................ 3

5.

DOCUMENTATION ....................................................................................................... 4

6.

TRAINING...................................................................................................................... 4

7.

INSPECTION AND TESTING........................................................................................ 5 7.1

Testing Requirements....................................................................................... 5

7.2

Factory Acceptance test (FAT)......................................................................... 5

7.3

Site Acceptance Test (SAT).............................................................................. 5

ATTACHMENT 1 – FIRE ALARM SYSTEM DATA SHEET ................................................ 6 ATTACHMENT 2 – CONTROL SYSTEM SCHEMATIC DIAGRAM .................................... 7 ATTACHMENT 3 – SPESIFIKASI TEKNIS ELEKTRIKAL/KONTROL ............................... 8

Date

REQUISITION

: 18 Aug 2009

Doc. No.

FIRE ALARM SYSTEM Rev

1.

: A

Page

3 of 8

GENERAL This requisition, together with the references and documents specified below defines the minimum requirements for design engineering, supply, fabrication, configuration, testing and installation of the Fire Alarm System which shall be supplied for Coal Handling Facility – Mutiara Tiga Besar Utara Barat Tahap 1, PT Bukit Asam.

2.

REFERENCE DOCUMENTS Fire Alarm System Data Sheet – Attachment 1 Control System Schematic Diagram – Attachment 2 Spesifikasi Teknis Electrikal/Kontrol – Attachment 3

3.

EQUIPMENTS TO BE SUPPLIED The following items shall be furnished in accordance with the requirements specified in this requisition, specification, data sheet and other related documents 1. 2. 3. 4. 5. 6. 7. 8.

B

4.

Fire Alarm Control Panel - 1 lot Addressable Smoke Detector – 11 sets Non-Addressable Smoke Detector – 17 sets Addressable Manual Call Point - 4 sets Non Addressable Manual Call Point – 4 sets Fire Alarm Motor bell – 8 sets Outdoor Manual Call Point – 1 set Horn & Beacon – 1 set

VENDOR SCOPE OF WORK Fire alarm VENDOR scope of work shall include design, supply of materials, fabrication, shop test and inspection, painting, marking, packing, works up to FOB, etc. for the equipment, but not limited to: -

-

Fire alarm system Hardware, Software, and related accessories. All related job inside control room: (a) Fire alarm system equipments installation and configuration (b) System cable installation Testing and Inspection Documentations

Fire alarm VENDOR responsibility shall include but not limited to the followings:

Date

: 18 Aug 2009

REQUISITION

Doc. No.

FIRE ALARM SYSTEM Rev

: A

5.

Page

4 of 8

Clarification meetings and Kick Off Meeting with PURCHASER Engineering Manufacturing Documentations Factory Acceptance Test Packing and Shipping Site Acceptance Test Pre-commissioning and commissioning assistance Warranty

DOCUMENTATION The Vendor shall provide the following basic technical information for the proposed Control System along with Quotation submission: a. Listing of the Codes and Standards to be used in design, manufacturing, construction, performance testing, and quality control for controls and instrumentation works of the Plant. Code and Standards to be used shall be internationally recognized and accepted. b. Control System Configuration c. Project experience lists. d. Deliverable List and Submission Schedule e. Manufacturing Schedule f. Recommendation Spare Pare List for 2 years operation (with unit price)

The following documentations shall be included in Vendor’s Deliverable List, but not limited to: a. b. c. d. e. 6.

Functional Specification Fire alarm Regulatory Control (Function Control Narratives) Logic Diagram Hardware and Software Specification Fire alarm Self Documentation (for each Controller)

TRAINING Training shall be provided for all aspects of the Fire alarm including theory of operation, system architecture, system configuration implementation, maintenance and day to day operation of the equipment. Vendor shall be responsible for supplying all equipment, computer terminals and consumables in a professional learning environment.

Date

REQUISITION

: 18 Aug 2009

Doc. No.

FIRE ALARM SYSTEM Rev

: A

Page

5 of 8

Technician training classes shall be carried out at the Vendor’s premises to train technician personnel with all aspects of the Fire alarm theory, operation and configuration and logic implementation. 7.

INSPECTION AND TESTING Details of Inspection and Testing requirements shall be in accordance with the following:

7.1

Testing Requirements a) All equipment specified in Vendor's documents shall be presented to inspection (identification, fitting, cables, wiring, labeling, painting) b) Interface links tests (Integration Test with other Systems supplied by Package Vendor.) c) Simulation of programs implemented in the system d) Factory Acceptance Test (FAT)

7.2

Factory Acceptance test (FAT) The test shall include both specific performance tests for individual hardware and software modules and integrated system tests to demonstrate that all hardware, standard software and custom software functions correctly under normal and abnormal conditions. All point configurations shall be checked by using I/O test panels. Errors detected during these tests in the system programming and configuring, shall be listed on a punch list and corrected before the end of the factory acceptance tests. Vendor shall be required to prove that all foreground functions including on-line data scanning and control functions consume no more time than specified.

7.3

Site Acceptance Test (SAT) The test shall be conducted by the Vendor with Client’s and/or Purchaser’s representatives present and the test shall essentially be a repetition of most of the FAT with a view to ensuring that the system has been installed and functions properly and complies with the specification. SAT is a part of the overall plant pre-commissioning and commissioning activities.

Date

: 18 Aug 2009

REQUISITION

Doc. No.

FIRE ALARM SYSTEM Rev

: A

Page

6 of 8

ATTACHMENT 1 – FIRE ALARM SYSTEM DATA SHEET

Date

: 18 Aug 2009

REQUISITION

Doc. No.

FIRE ALARM SYSTEM Rev

: A

Page

7 of 8

ATTACHMENT 2 – CONTROL SYSTEM SCHEMATIC DIAGRAM

Date

: 18 Aug 2009

REQUISITION

Doc. No.

FIRE ALARM SYSTEM Rev

: A

Page

8 of 8

ATTACHMENT 3 – SPESIFIKASI TEKNIS ELEKTRIKAL/KONTROL

Related Documents

Rfq Fire Alarm
June 2020 6
Fire Alarm
November 2019 29
Fire Alarm
November 2019 18
16006 Fire Alarm
December 2019 14
Fire Alarm Riser.pdf
December 2019 13
Bap Fire Alarm
August 2019 49