URBAN GREEN THUMB
SITE SECTION LOOKING NORTHEAST
SITE PLAN
SITE
F.A.R. 4.0
F.A.R. 4.0
F.A.R. 4.0
MAXIMUM BUILT AREA
F.A.R. 4.0
F.A.R. 4.0
MAXIMUM OPEN AREA
PROPOSED DESIGN
FAR DIAGRAM
1. TRANSLATE GROUND FLOOR TO ROOF
2. CREATING POROUS URBAN CONDITION
3. FRACTURE AND SHIFT MASSING TO BREAK 4. REINTRODUCE GROUND LEVEL COMMERCIAL TO ENGAGE BUIDING WITH COMMUNITY DOWN THE MONOLITHIC SCALE
5. INSERT EVENT SPACES
GROUND FLOOR PLAN 1/32”=1’-0”
TOWER MASS EVOLUTION DIAGRAM
COMMERCIAL AND AMENITY
CONNECTORS
CIRCULATION
STRUCTURE
SKIN SYSTEMS
COMPOSITE
SECOND FLOOR PLAN 1/64”=1’-0” PROGRAM COMPONENT DIAGRAM
LIVE / WORK
STUDIO
2 BEDROOM
1 BEDROOM
3 BEDROOM
COMPOSITE
UNIT STACKING DIAGRAM
THIRD FLOOR PLAN 1/64”=1’-0”
FOURTH FLOOR PLAN 1/64”=1’-0”
FIFTH FLOOR PLAN 1/64”=1’-0”
12TH FLOOR PLAN 1/64”=1’-0”
DETAIL SECTION THROUGH ROOF AND UNITS
13TH FLOOR PLAN 1/64”=1’-0”
14TH FLOOR PLAN 1/64”=1’-0”
3 BEDROOM PLAN 1/8”=1’-0”
2 BEDROOM PLAN 1/8”=1’-0”
1 BEDROOM PLAN 1/8”=1’-0”
STUDIO PLAN 1/8”=1’-0”
LIVE / WORK PLAN LOWER 1/8”=1’-0”
PERSPECTIVE LOOKING SOUTH WEST
PERSPECTIVE AT INTERIOR SHOPPING COURT
PERSPECTIVE AT SHOPPING ARCADE
LIVE / WORK PLAN UPPER 1/8”=1’-0”
URBAN CONNECTOR DIAGRAM
BUILDING SECTION 1/16”=1’-0”