Narrative Summary Goal
To have a strong and sustainable parents association that can effectively manage programs and projects for children.
Objectives
1.To build the capacities of parent association along the areas of organizational leadership program and financial management;
Families and Children for Empowerment and Development Foundation, Inc. LOGICAL FRAMEWORK FOR Capacity Building FY 2008-2008 Objectively Means of Important Budget Verifiable Indicators Verification Assumptions Programs and OCA projects supported by documentation CCF are sustainably Minutes of implemented meetings At least 1 project for Reports children is sustainably Committee reports implemented by the Acomplishment PA from other fund report sources -13 BOT members - Leadership and PA leaders are evaluation performing their - Accomplishment respective roles and reports, Feedback functions reports and -PA Policies, systems documentation and procedures are in - Policies place (organizational, Sustainability plan project management guidelines, financial system) -at least 39 Parent Leaders are Skilled in PIME A sustainability development plan for the PA
CCF
Counterpart
Narrative Summary 2. To enhance the technical competencies of staff for efficient management of SR, community programs and, projects
3. To develop and manage pool of community volunteers for effective implementation of programs, projects and SR activities
4.To effectively manage child sponsorship
Objectively Verifiable Indicators Staff are able to satisfactorily respond to SR, program and finance concerns as evidenced by : a) programs and projects implemented as planned, b) technical assistance provided on time, c) quality reports submitted on time
Means of Verification Monthly cliniquing output Performance appraisal M&E report, SSIMS, FITS and other reports
At least 87 (37 old and 50 new) volunteers will be mobilized and be provided with technical skills to support implementation of programs, projects and SR activities
Volunteer profiles; contract with volunteers; job description of volunteers; logbook of volunteers; volunteer reports
100 % of SR requirements complied with according to standards Full compliance with
SSIMS report Report of Monitoring Visit
Important Assumptions
Budget
CCF
Counterpart
Narrative Summary 5. to ensure that the project meets the sponsorship certification requirements Outputs (Strategies)
1.Building the capacities of board and officers of parents/ community associations in organizational development, /program and financial management;
Objectively Verifiable Indicators sponsorship certification requirements
Means of Verification OCI Checklist
-At least 60% (39) of the officers/leaders are applying skills in SAPIME
Existence of sound project design, Planning, Monitoring and Evaluation System
-Policies and guidelines on financial management is developed and implemented
Audit reports Financial reports
Important Assumptions
Budget
CCF
- Internal controls are in place
Activities: Organizational Development a.OCA
-Existence of project management guideline
PMG manual Board resolution adopting the manual
At least 39 leaders participate in OCA
OCA output Attendance
OCA: Meals: P130 x 39 = P 5070 Venue: P 1500 Transpo: P18 x 39 = 702
7272
Counterpart
Narrative Summary
b. Conduct of plan and budget session
c. ASP Review and formulation of 3 year ASP
d. structured learning visit to a phased out project affiliate that is able to sustain the PA (Milagrosa Parents Association in Lucena or BUBI in Batangas) e. Sustainability planning
Objectively Verifiable Indicators
Means of Verification
Important Assumptions
Budget
CCF
At least 39 leaders attending Plan and Budget Session
Attendance Documentation Plan and Budget
Plan and Budget Session: Meals: P130 x 39 x 2 days = P 10140 Venue: P 1500 x 1 day = 3000 Transpo: P18 x 39 x 2 days = 1404 Materials: P 500
15044
At least 39 leaders, 13 Barangay Officials and 3 LGU officers and 2 partners participating in the ASP Review and formulation
Attendance ASP Document
ASP Review: Meals: P130 x 39 x 2 days = P 10140 Venue: P 1500 x 1 day = 3000 Transpo: P18 x 39 x 2 days = 1404 Materials: P 500
15044
At least 26 leaders attending SLV
Attendance and documentation Plan of Action
SLV: Transpo: P 500 x 26 pax = 13000 Meals: P 130 x 26 pax= 3380
16380
At least 39 leaders are involved
Sustainability plan
Sustainability Planning: Meals: P130 x 39 = P 5070 Venue: P 1500 Transpo: P18 x 39 = 702
7272
Counterpart
Narrative Summary
f. formulation of organizational mechanism
g. Renewal of SEC Documentations
Financial Management a. audit of the PA
b. Resource Mobilization Training
c. collection of monthly
Objectively Verifiable Indicators
Means of Verification
Important Assumptions
Budget
At least 13 leaders draft the OMG
OMG Attendance
Snacks: P 20 x 13 x 3 mtgs= 780
At least 3 leaders are involved in processing SEC Documents -All government reportorial requirements are complied with
SEC Registration
Transpo: P 100 x 3 pax x 3 visits = 900 Meals: P 130 x 3 pax x 3 visits = P1,170
At least 9 Barangay Parents Associations will be audited
Audit report
Audit fee of volunteer auditor (CPA): 20,000
At least 39 leaders participate in the training and at least 7 PA are able to document their Resource Mobilization Plan
Attendance, minutes, documentation Attendance Resource Mobilization Plan
At least P100,000 will be raised.
Financial Statement
- at least P64,680.00 monthly dues
List of members paying dues and
RM: Meals: P130 x 39 = P 5070 Venue: P 1500 Transpo: P18 x 39 = 702 Materials: P500 Trainer’s Fee Volunteer resource person:P3000
CCF
Counterpart 780
1170
900
20,000
7772
3000
Narrative Summary
Objectively Verifiable Indicators
Means of Verification financial statement
6 regular meetings of the BOT of PA
Attendance Documentation
Snacks: P 20 x 13 pax x 6 mtg= 1560 Transpo: P 18 x 13pax x 6 mtg = 1404
12 meetings of the different committees with 30 pax
Attendance Documentation Committee Reports
Snacks P 20 x 30 pax x 12 mtg = 7200 Transpo: P 18 x 30 pax x 12 mtg= 6480
membership fees and monthly dues
Program Management a. conduct of regular meetings/ mentoring of the PA
b. quarterly committee meetings
2.Building the capacity of staff(ie project management cycle);
Important Assumptions
Budget
CCF
1560
1404
7200
6480
Satisfactorily performance appraisal of majority of the staff
Project Level a. monthly cliniquing meeting
Regular attendance of the staff to monthly cliniquing
Attendance Minutes
Participation of all the staff
Attendance Feedback Report
Food, Transpo,Acco. P 1000 x 8 staff = P8000
8000
b. Teambuilding activity
Participation of concerned staff
Attendance and documentation Letter of invitation
Registration fee: P 2500 x 4 staff= P 10000
10000
c. Participation in training of concerned staff in
Counterpart
Narrative Summary
Objectively Verifiable Indicators
development activities for continuous professional development (as per invitation to the project) NO Initiated a. Planning and Budgeting Workshop
Important Assumptions
Budget Capacity Building Specialist: P 20,0000
CCF 20000
Participants are: PM,SR, 2 CMs, FAO
Letter, Handouts, Certificate and Feedback Report
47500
PM,GB Chair, CM
Letter, Handouts, Certificate and Feedback Report
20800
PM, SR
Letter, Handouts, Certificate and Feedback Report
14200
PM, SR, FAO, CM
Letter, Handouts, Certificate and Feedback Report
14200
PM,CM
Letter, Handouts, Certificate and Feedback Report
20800
MEAC
Letter, Handouts, Certificate and Feedback Report
3600
CM, PM, GB
Letter, Handouts, Certificate and Feedback Report
20,800
b.National Conference
c. SR Updates Conference
d. Project Management Guidelines
e.Orientation on ALS and Child Friendly School and Community Development of School f. M&E System Implementation and Benefit Tracking g. Business Planning or Social Enterprise and Entrepreneurship
Means of Verification and Certificate of Participation
Counterpart
Narrative Summary
Objectively Verifiable Indicators
Means of Verification
Important Assumptions
Budget
CCF
Development (SEED) CMs, PM
Letter, Handouts, Certificate and Feedback Report
14,200
CM and PA
Letter, Handouts, Certificate and Feedback Report
14,200
87 volunteers are capacitated
Volunteer profiles Feedback Reports
At least 50 volunteers (adult or youth) would be recruited
Volunteer profiles
a. Recruiting and profiling of the needed volunteers (new) b. Orientation to volunteers
At least 50 volunteers will be oriented
Attendance and orientation
Monthly of quarterly supervision with volunteers depending on the nature of the task
Attendance and minutes
87 volunteers are provided with support (actual snacks/meals
Feedback report/ accomplishment report
h. Responding to Disasters: Child Centered Spaces and Developing Resiliency i. Convergence on Primary Health Care
3.Building the capacity of volunteers(i.e Program and SR Delivery);
c. supervision meeting of concerned staff with volunteers (old and new)
d. volunteer support and recognition
1900 Snacks: P 20 x 50 volunteers = 1000 Transpo: P 18 x 50 volunteers= 900
174 Certificates: 87 vol x P 2 = 174
3800
Counterpart
Narrative Summary enhancement/ upgrading/ reorientation training of volunteers
Objectively Verifiable Indicators and/ or transpo) and certification
Means of Verification Volunteers Logbook
76 volunteers are provided with SR Kits
Important Assumptions
Budget SR Kits: P 50 x 76 SRV= 3800 Advocacy Shirts: P 130 x 37 vol = 4810
CCF 4810
37 volunteers are provided with Advocacy shirts
4. Sponsorship Requirements effectively managed
a. Regular SR Volunteers Meeting (Discuss SSIMS
report to volunteers)
quota maintained (+3); 100% of children’s correspondence submitted within standards; Sponsor inquiries submitted according to standards; 100% RAM request complied according to standards
Correspondence charts,SR logs, Masterlist, Communications
At least 26 SR volunteers/ leaders will be regularly attending meetings and monitor/ follow-up
Attendance and minutes
Snacks: P 20 x 26 pax x 12 mos = 6400 Transpo:
6400
Counterpart
Narrative Summary
Objectively Verifiable Indicators SR concerns
Means of Verification
100% of children’s letters submitted on time
Transmittal, copy of letters
All CCF children are visited within the year
Home Visit Record
c. Home Visits
1500 copies of forms
Requisition form and purchase order
e. Updating of Correspondence Chart f. Orientation to Newly Enrolled Families (to include Child Protection Policies and Standards) g. Quarterly general filing day
Budget P 18 x 26 pax x 12 mos = 5616
b. Submission of children’s letter
d. Printing of Forms –FCIs, Child Progress Reports, Home Visit Forms, Stationeries, pictures for CPR, benefit tracking
Important Assumptions
CCF
Counterpart
5616
44218
1078
Snacks: P 20 x P 150 = P 3000 Transpo: P 18 x P 150 = 2700
3000
2700
Snacks: P 20 x 26pax x 4 = 2080
3952
Forms: P 300/ ream x 3 reams x 4 in a year x 3 forms = 10800 Pictures for CPR: 1078 x P 6 = P 6468 CPR forms: P 25 x 1078 = 26,950 CPR Capture forms: 1078 pcs x P 1 = 1078 13 Correspondence charts are updated quarterly
Updated correspondence chart
At least 150 newly enrolled families
Attendance and minutes, singed CPPS statement
At least 26 volunteers are involved in filing of SR documents 100 of the required
Attendance
Narrative Summary
h. CPR preparation
i. Processing and submission of materials for NS and RAM .
J. Benefit tracking
5. Sponsorship Certification Requirements in place 1.
Compilation of certification documents based on checklist
2.
Preparation of directories list of documents with proper labels
Objectively Verifiable Indicators documents are completed and on file
Means of Verification CPRs, Transmittal
100% of sponsored children have CPRs
Transmittal SSIMS
+3% of the quota are met for new sponsorship
SSIMS Transmittal
Sponsor Retention of at least 80% and increase in sponsorship
SSIMS Transmittal
100 of enrolled children benefited from ccf supported projects
Benefit Tracking Capture forms
OCI Requirements Compiled
OCI
List of available OC documents produced; Control and access system installed;
OCI OCI
Important Assumptions
Budget
CCF
Counterpart
Transpo: P 18 x 26 pax x 4 = 1872 Volunteer Services: P 150 x 87 vol x 12mos = 156600
156600
Narrative Summary 3.
Set up system for control and access of filed documents.
4. Accomplishments of lacking certification requirements
From CCF Subsidy: Counterpart:
360,884.00 189,164.00
Objectively Verifiable Indicators Point Person for OC documents designated; OC documents completed
Means of Verification
Important Assumptions
Budget
CCF
Counterpart