Resume Muhammad Yasir Raza

  • Uploaded by: Muhammad Raza
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Resume Muhammad Yasir Raza as PDF for free.

More details

  • Words: 746
  • Pages: 3
Muhammad Yasir Raza HOUSE # 1049-50, Kashmiri Muhallah Matli, Taluka Matli, District Badin, PAKISTAN. Home # +92-297-840-909 Cell # +92-301-358-7757

E-mail: [email protected], [email protected]

I

Objective I want to join such a challenging environment with opportunities.

I

Academic Qualification Graduate (B.A)

I

Recently Working

With MOL PAKISTAN OIL & GAS CO.B.V, here I am involved from July -2008 to till date as Document Controller & Technical Assistant.

I

Work Experience with Responsibilities

Total 07 years of experience from February 2002 to till to date in the different projects such as (Compressors, Flow lines, Jetpumps) Oil & Gas Exploration Inc at BPPI Badin Concession Block & MOL Pakistan B.V, Central Process Facility, Manzalai Field Development, as follow:-

Experience



I

From July 2008 till to date I am working as Document Controller & Technical Assistant at MOL Pakistan Oil & Gas Co.B.V, Manzalai Field Development Surface Facility, Makori, Kohat. (In this case the manpower supplier is M/S Moody International).

I

Responsibilities MOL PAKISTAN OIL & GAS CO.B.V •

Control Project Drawings, maintaining computerized Drawings records with traceability.



Assist Manager in collecting day to day planning of the QA/QC activities.



Assist Manager in collecting progress report from site (CPF & GS)



Compile progress reports



Document controlling



Computerized record keeping of all QA/QC activities with traceability



Any Other job assigned by the QA/QC Manager or Site Incharge.

Experience BRITISH PETROLEUM PAKISTAN



I

01 year experience as a Assistant Planning Engineer in BPPI: With STEELMAN Engineering & Construction Company (From January 2007 to 08 July-08) I was involved as Assistant Planning Engineer in BP Pakistan Exploration and Production. (In this case the manpower supplier is M/S Steelman Engr. Instead of Moody, though the work is continued for BPP).

Responsibilities

I



Effective communication with concerned departments and contractors for better coordination in order to ensure timely execution of works.



Discuss & follow with Construction Team Leader for HSSE Target, Objective & Management



Compile/Up-dates all Construction Department Administration/HSE documentation. CPM “Contractor performance management” and all BPPI Procedures.

Page 1 of 3



Construction Weekly Performance Report for construction activities showing progress, status, cost, Administrative & Technical issues.



Preparation of Spread Sheets, Presentation Slides and Reports for Construction Department.



Prepare / follow-up monthly in house and Contractor's In-put Safety Data.



Preparation of Monthly progress reports.



Maintain dispatch record.



Prepare MIV/RMIV/MTF/DN for issuance and return accordingly with stock number/specifications.



Prepare/Up-date CRF's materials AFE's / MIV's documentation files for audit purpose.



Preparation of PR for direct charge items and follows up with CBWH (Central Badin Ware House) & Purchasing.



Updating Record on BPPI Documentum Webtop.



Follow with Contractors & Moody CSS for issuance & Closing of Field Instructions Level-II.



Follow with Contractors & Moody QA/QC for Closing of Quality Alerts & NCRs.



Review of Moody QA/QC & Moody CSS KPI’s



Quarterly Audit of CRFs of Construction Department



Follow with contractors for timely download & Over Speed Limit Violation of Drive Right.

I

Experience MOODY INTERNATIONAL



4 Year of experience from February 2002 to December 2006 with Moody International as a Document Controller at BPPI Badin Concession Block.

I

Responsibilities •

Assist QA/QC Manager in collecting day to day planning of the QA/QC activities.



Assist QA/QC Manager in collecting progress report from site various sites.



Control Project Drawings, maintaining computerized Drawings records with traceability.



Compile progress reports



Document Controlling



Computerized record keeping of all QA/QC activities with traceability



Prepare QA/QC Procedures with the help of QA/QC Manager.



Any Other job assigned by the QA/QC Manager.

• Planning Administrator: IT consultant & service provider (Feb 1998 to Nov 2001) • Friends Networks here I am involved as Network Administrator. Computer Skill

I

Well versed with use of Windows 2000 Server / Professional / XP / vista, MS office, MRO software Maximo, Crystal Reports, Adobe Photoshop, Dream weaver, Correl Draw & Internet access.

I

Certifications • BP’s 8 Golden Safety Rules Certification in BP Pakistan Exploration and Production.

I

Achievements Achieved 1 Spot Recognized Awards from BP Pakistan Exploration and Production. 1) Excellent record keeping of the Construction Planning Document & Construction Manual updating.

I

Personals Father’s Name

:

Muhammmad Iqbal Page 2 of 3

Date of Birth Place of Birth N.I.C # Status Religion

: : : : :

February 09, 1980 Matli 41103-5206473-1 Married Islam

References

I

Will be furnished if desired

Page 3 of 3

Related Documents

Yasir
November 2019 7
Yasir Rajput
October 2019 15

More Documents from "saifullah"